Council archive · source document
09/1227 - Operational Works - Landscaping [As Published] · 142009.1227
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
sere ee —
ISEC’ "TON (1 section +’ must be completed for all applications that require completion of the DAS Assessment Checklist.
HERMAGE~ - Ce ee oe — ]
441A Is any part of the proposal intended to be carried out on a Queensland heritage place under the Queensland Heritage Act 1992?
IX] No-Gotorz18 =] Yes
IPA, schextuie 8, part 7, table 5, item 21P Re: in, schedule 2. table 2, item 18
1.1B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?
[XJ No-Gotoarz2 [[] Yes
IPA, seheduié 8, pari 1, tabie 5. iter) 24, IP Fegulaiion. scheduie 1. part 2. tahie 5, item 2.
IREMOVING QUARRY MATERIAL; WILD RIVER AREA , a de ee a |
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
BX] No-Gotoa13 [_] Yes
IPA, schedule 8, part 1, lable 5. item 1; IP Regulation, schedule 2. table 2, item 11; 1P Reguiation, schedule 1, iable 5, iter 2 {wild river area); Water Act 2000,
section S86C: Wild Rivers Act 2005, section 43A
IENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA®
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
—X] No-Gotoar4 ((] Yes
IPA, schadule &. part 1, lable 2. item 1: IPA, schedute &. part 1, table 5, dems 3 and 4. IP Regulation. schedule 2, jable 2. items | and 23: Environmental Protection Act 1294, section
TAA (wild river area}, Wild Rivers Act 2005, section 434; relevant wild river declaration, Wild Rivers Code.
[WITHIN THE LIMITS OF A PORT es eenrasar as 2
1.4 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
No - Go to. Q1.5
1 Yes
IP Regulation. schedule 2, table 2. items 15 and 16
{DECLARED FISH HABITAT AREA ** Sf 808 Se eS - _
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
KK] No - Goto 07.6
O Yes - If answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schoo
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Reguilelion. schedule 2, table 2, item 26
COMMUNITY INFRASTRUCTURE « - 8 woe ees ed
1.6 Is any part of the premises designated for community infrastructure?
DX] No - Goto 01.7
(J Yes
JP Requiation, schedule 2. table 3. item 7
[WASTE WATER MANAGEMENT _< : ees
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
DX] No - nd of Sections [CT] Yes
iP Regulation, schedule 2. table 2, item 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1227 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.