Council archive · source document
Response to Information Request - Final 21 March 2024 · MCU23/0096
“Adamson Town Planning, specialising in providing higher order town planning advice”
• Site cover, gross floor area and building bulk (PO18) - All buildings on the site will not
exceed a site cover of 50% (refer Attachment 2). The Site Coverage Plan provides for the
approximate areas of the new buildings and the buildings to be removed, including the
PAC, which provides for a general overall site cover of about 26%. Consequently, the site
cover from the proposed development under the Master Plan is well below 50%
(AO18.3).
The development will be consistent with the performance outcome with respect to the
built form being fit for purpose and not presenting an appearance of building bulk to
adjacent properties, roads, or other areas. Further, adequate open space and landscaping
is being provided and maintained within the site and contributes in a positive manner to
the streetscape. The proposed PAC while a relatively large building, is well removed from
the street, being over 40m from Walter Hay Drive.
• Setbacks (PO19) – All buildings within the site will provide for adequate landscaped
building setbacks to maintain the amenity of adjoining and nearby residential properties.
Further, will allow for adequate space for parking and landscaping, and will preserve
vegetation where possible consistent with performance outcome.
• The Master Plan provides for other improvements including mostly a 3m wide
landscaped buffer (AO19.1) to the adjoining residential properties (where possible) to the
northern and eastern boundaries. Further, provides for the erection of new sound
attenuation fencing to a maximum height of 2.4m, where adjoining residential properties.
Parking and Traffic Management
The location of the proposed parking and traffic management within the site has been
carefully considered and provides for the following:
• A total of 298 car parking spaces including:
o Area P1 - 17 spaces for pre‐prep / early years (including 1 PWD)
o Area P2 - 81 spaces for short term parking (including 1 PWD)
o Area P3 - 153 spaces for secure staff long term parking
o Area P4 - 47 spaces for mixed use and student parking
In addition to the 298 car parking spaces there are 16 spaces in the drop-off and pick-up
lane and queueing for a further 8 vehicles within the site (Area P2). It is noted than an
existing classroom will be partially or completely demolished to achieve this outcome (refer
Site Plan – Attachment 3).
Further traffic engineering advice is provided as Attachment 6. The traffic engineering
advice confirms that with the maximum number of students stipulated and the number of
equivalent full-time staff, which generally accords with the number of secured parking spaces
provided in Area P3, the educational establishment will have ample onsite parking. For
5|Page
23002 – Good Shepherd Lutheran College – Preliminary Approval & Performing Arts Centre
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Final 21 March 2024.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.