NATURAL HAZARDS OVERLAY CODE
Performance Criteria and Acceptable Solutions

PERFORMANCE CRITERIA

) Emergency service facilities;
Hospitals;
Education Type 4 uses, including stores for
valuable records or items of historic or cultural
significance; and

d) Service and utility uses, including electricity
substations, major electrical depots and water
treatment plants.

 

a
yea

 

ACCEPTABLE SOLUTIONS SOLUTIONS’ oe) a RS) COUNCIL USE ONLY
$3.2
The community infrastructure, development— No community infrastructure has been incorporated into this
a) does not result in any new building work other proposal.
than an addition to an existing building;
b) does not involve vegetation clearing; and
c) does not alter ground levels or stormwater
conditions; or
$3.3
The development includes measures that ensure— v The subject site is not identified as being within a landslide hazard

a) _ the long term stability of the site;

b) access to the site will not be impeded by

a) landslide event; and

c) the community infrastructure will not be
adversely affected by landslides originating on
sloping land above the site28.

area.

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Uses

 

 

04 $41 AIS Part of the site is located within a Medium Bushfire Hazard Area.
The proposed use does not compromise the safety | The use is sited on land that is not in a Medium or The majority of the proposed development is not located within this
of people or property from bushfire. High Bushfire Hazard Area29. area and has been designed to mitigate the effects of Bushfire.
Protection of Infrastructure and

Community Uses NIA No community or infrastructure uses form a part of this proposal.
05 $5.4

Community Uses and Infrastructure Uses, | Community Uses and Infrastructure Uses are

including that identified below, are able to function | not located in a High or Medium Bushfire Hazard

effectively during and immediately after bushfire | Area identified on Overlay Maps OM1.4 to OM9.4;

events— or

a) Emergency service facilities;

b) Hospitals; $5.2

c) Education Type 4 uses, including stores for | Building work will not involve more than an NIA

valuable records or items of historic or cultural
significance; and’

d) Service and utility uses, including electricity
substations, major electrical depots and water

 

 

additional 20m2 of Gross Floor Area to an existing
building; or

 

 

 

 

 

1 Solution: | ¥ = Acceptable Solution
A/S = Alternative Solution

N/A = Not applicable to this proposal

20517 ~ Essence of Peregian

Appendix Q
20517_naturalhazardsOverlayCode_FINAL_mrc.doc

Page 2

Used in these records

About this file

File size
6.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20517 App Q.pdf [As Published].pdf · 6.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.