SPECIAL MEETING AGENDA                                                                        30 AUGUST 2021


    Public Disruption Risks      Mitigation
    Inability to attend to       As soon as possible after the tender award, a meeting will be held with the
    medical condition of a       contractor, project team and emergency services regards risk and limited
    local resident, situated     access during construction windows. Contact will be sought with affected
    behind the Tablelands        residents to discuss situation and access constraints.
    Road Bridge B.               Temporary relocation of any high risk residents during the 72 during full road
                                 closure (except pedestrian traffic) could be an additional risk mitigation if the
                                 residents agree.
                                 The set methodology and construction phasing in the contract specifications
                                 minimise road closure durations compared to common bridge construction
                                 methodology. Moreover, during any road closure, the contractor has small taxi
                                 buses available to transport residents from their property north of the bridge to
                                 the temporary pedestrian bridge, and to bring them to their parked cars south
                                 of the bridge which could transport medical staff and equipment if required.

Consultation
External Consultation - Community & Stakeholder
        Telstra
        Direct affected community residing north of the Tablelands Road Bridge B.
A comprehensive communication plan has been drafted and initial activities have been
undertaken as part of the project delivery.
A community consultation meeting was held with residents near Tablelands Road Bridge B in
late 2020. Residents were receptive to the temporary disruption to replace the existing bridge, with
a request they are kept well informed. Residents south of Tablelands Road Bridge B have offered
impacted residents north of the bridge to park their cars at their property if needed during
construction.

Internal Consultation
Departments/Sections Consulted:

       Chief Executive Officer        Community Services                          X   Corporate Services
       Executive Support              Director                                    X   Director
                                      Community Development                       X   Financial Services
                                      Community Facilities                            Fleet
                                      Libraries & Galleries                           ICT
                                      Local Laws                                  X   Procurement
                                      Waste & Environmental Health                    Property
                                                                                      Revenue Services

       Executive Services             Environment & Sustainable Development       X   Infrastructure Services
       Director                       Director                                    X   Director
       Community Engagement           Building & Plumbing Services                X   Asset Management
       Customer Service               Development Assessment                          Buildings and Facilities
       Governance                     Economic Development                            Civil Operations
       People and Culture             Environmental Services                          Disaster Management
                                      Strategic Land Use Planning                 X   Infrastructure Planning,
                                                                                      Design and Delivery




                                                                                                   Page 10 of 15
Log in to download the original file

2021-08-30 Special Meeting Agenda(PDF, 1MB).pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.