SPECIAL MEETING AGENDA 30 AUGUST 2021
Safety Risks Mitigation
High-risk work using The contractor is accredited to AS 4801 (Occupational Health & Safety
machinery and hoisting Management Systems) and the contractor has demonstrated their capability
involved. through the tender process. The contractor is experienced having successfully
completed several similar type bridge projects within the past years, moreover,
was principal contractor within the Sunrise Beach, Orealla Crescent Bridge
replacement project.
Environmental Harm Mitigation
Risks
Works impact on the The contractor is responsible for the development and implementation of
environment. strategies to minimise impacts such as noise, dust, vibration, sediment and
erosion. Approved plans will be in place to manage species such as Tusked
Frogs. Necessary tree removal and trimming requirements are brought to a
minimum in the design phase and are well specified in the contract
specifications. The superintendent and Council staff will closely monitor the
construction phase to ensure all impacts are minimised.
Scope and Quality Mitigation
Risks
Risk of not meeting To be managed through reviews performed by experienced Superintendent
project objectives. and Council staff, supported by a specialist consultant.
Public Disruption Risks Mitigation
Traffic disruption due to See the 'access during construction' section in this report. Maximum road
total road closure at the closure durations and timing windows are well specified in the contract and are
site location. endorsed by an external legal advisor upfront tender release. The current traffic
use of both roads at bridge locations is minimal.
Communication issues. For SP1 – Tablelands Road Bridge B, Council has engaged an external
experienced communication / community engagement consultant who will
closely work with Council’s Communications and Infrastructure departments,
as well with the contractor to inform affected residents and businesses.
For SP2 – Wahpunga Lane Bridge, the internal experienced Infrastructure
Communications and Consultation Officer is appointed to the project.
Noise from plants and This will be minimised by working during normal working hours where possible.
equipment may be a
cause of disruption to
residents.
Vibration during piling and At Tablelands Road Bridge B, the specified piling method of micro piling
demolition. (boring) due to the soil conditions minimises vibration.
For the Wahpunga Lane Bridge, due to soil conditions, a bored pile solution
with steel liners has been specified which uses an auger drill and is less
intrusive compared to the usual pile driving. Sheet piles will be used to mitigate
the existing scour issue along the eastern bridge approach. Common vibration
techniques will be used to install the steel sheet piles during a relatively short
duration of around one week expected, pending soil conditions.
Disaster occurs during For Tablelands Road Bridge B, the experienced contractor uses detailed
construction e.g. bushfire weather forecasting to plan ahead and will liaise with emergency services
and properties are not upfront, especially to plan the 72hr full road closure duration (Phase 2).
accessible. On-site availability of steel road plates mitigates access constraints for
emergency services by providing an ad-hoc access option to all properties
behind the bridge outside the 72hr full road closure duration.
For Wahpunga Lane Bridge, before the contractor starts deconstructing the
existing bridge, detours will be in place. Emergency services, affected
residents and road users will be informed regards detours well upfront for them
to plan ahead.
Page 9 of 15