Original source · versioned page text
Jen Drysdale submission 17 Dec 15
Attached to the e-mail MCU15/0095 & REC15/0022 PM Submission Object - Jennifer Drysdale.
4. NON COMPLIANCE WITH RELEVANT PLANNING INSTRUMENTS: The Applicant has completely failed to address the numerous and significant potential impacts of the proposed Development on the adjoining School. The following specific areas of non-compliance are noted: Code Objective Developer’s Assessment Objectors’ Assessment RECONFIGURING A LOT CODE O9 The subdivision layout is designed to facilitate linkages with adjoining sites in the immediate area. O09 Complies: The proposal will comply where reasonably applicable. Does not Comply The phrase “reasonably applicable” is unclear and the specific linkages with adjoining sites in the immediate area have not been considered or adequately addressed. 010 Where the lots are to be used for Industrial business or Commercial business uses, the layout provides for appropriate buffer areas, to mitigate possible impacts on nearby residences or other noise sensitive uses 010 Complies : Landscaped buffering has been provided along all boundaries adjoining the school to the east. Does not Comply The layout does not provide for appropriate buffer areas, to mitigate possible impacts on the adjacent School. Landscape buffering is insufficient and ineffective to mitigate the negative impacts, including those of fugitive emissions, of the Development. O12 An adequate and accessible water supply is provided for fire fighting purposes. $12.1- 12.2 Complies Will comply as applicable. Does not Comply The Applicant has not adequately addressed the issue of fire safety and its potential impacts, particularly given the proximity of the Development to the adjacent School. O32 Access easements are in appropriate locations for safe access and egress, and supply appropriate widths and levels of service for the number of vehicles that will utilise them $32.1 Complies It is considered that the proposed access easement has been designed in accordance with Sections 2 and 3 of PSP5 Engineering Design Standards — Roads, Drainage and Earthworks. Does not Comply The proposed access is not appropriate for the Development and does not provide safe access and egress nor does it provide for the appropriate level of safety of school children given its proximity to the School 033 Traffic generated by the development is within the acceptable capacity of external roads and does not have an adverse impact upon the functioning of the $33.1 Complies The development will comply where reasonably applicable. Does not Comply “reasonably applicable” is indeterminate. The proposed Development does have an adverse impact upon the functioning of the road network. The Applicant has 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original