Council archive · source document
170903 ADAMS + SPARKES Minor Change Application · 51993.615.03
Attached to the e-mail Change to a Development Approval - 51993.615.03.
MINOR CHANGE TO EXISTING APPROVAL 3 6/13 NOOSA PARADE, NOOSA HEADS It is noted that the development does not seek to vary the overall height of the building and will not result in any additional overshadowing impacts on the adjoining residential development to the immediate west. The proposed development contains consistent northern, southern and eastern setbacks to the current situation, with the only variation proposed to the western setbacks. The development proposes a setback of 1.2 metres, which is compliant for a typical single storey development, however, is largely non- compliant in this case due to the development containing a roof form, which integrates with the existing development. It is noted that the development could be designed to provide a compliant setback, however, this would result in an inferior design outcome. Further discussion on this will be provided in Section 2 below. Figure 2 Elevations (Source: DCM Building Design) Figure 3 Section (Source: DCM Building Design) In order to facilitate the extension, the removal of approximately four (4) palms are required between the existing built form and the boundary (demonstrated in Figure 4 below). In addition to this, the additions are proposed to be located over an existing sewer main, which runs between the boundary and the existing building (demonstrated in contour and detail survey - Appendix 2). In support of the application, a Service Advice Notice was requested from Unitywater, which identified the below comments relating to building over assets: • Unitywater permits construction over existing sewerage mains. For the current proposal Unitywater advises a redesign of the proposal is required to address the above requirement for clearances to the sewerage property connection (1 metre from any property connection); • Should you proceed with a redesigned proposal to meet the property connection clearance requirements and the proposal still involves building over the existing sewerage main, the following will be required to be submitted to Unitywater for assessment: TIM BARRETT AND JANE EAKIN MARCH 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
170903 ADAMS + SPARKES Minor Change Application.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.