                                                                                 Officer:            Nadine Gorton
                                                                                 Direct Telephone:   07 5329 6215
                                                                                 Our Reference:      132001.210239.2
                                                                                 Your Reference:     n/a

               3 April 2024


               MA Woodley & J Woodley
               C/- Brennan Planning Pty Ltd
               44 Maple St
               COOROY QLD 4563
               [email protected]



               Dear Sir/Madam,
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 15 December 2022, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              132001.210239.2

                   Street address:              36 Seaview Terrace, Sunshine Beach

                   Real property description:   Lot 54 RP 81810

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               The following type of approval was issued on 21 March 2002
               •       Development Permit for Material Change of Use – Dwelling in a Sand Dune Problem Area
               In relation to the request to make a minor change to the existing approval, Council on 26 March
               2024, decided to approve the requested changes. The changes are detailed below.
               A.      Approve the change;
               B.      Amend condition 4; and
               C.      Included additional condition 9
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                              PO Box 141
               noosa.qld.gov.au                                                         Tewantin QLD 4565
               [email protected]                                                         07 5329 6500
                                                                                                          Page 1 of 5
Document Set ID: 22887910
Version: 5, Version Date: 03/04/2024
Full text of the other 4 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

               Building
               1.     An identification survey of the subject site is to be carried out by a Licensed Surveyor and is
                      to be submitted to Council at the time of foundation inspection or immediately thereafter.
                      Such survey shall set out the boundaries of the site and the position of the buildings on the
                      site.
               2.     The geotechnical report submitted as part of your application has been appraised and
                      approved subject to the following conditions:
                      2.1. There is to be no uncontrolled discharge of water onto the slope.
                      2.2. Stripping of vegetation for construction purposes should be minimised. If vegetation is
                           destroyed it should be reinstated immediately after construction is completed.
                      2.3. Additional load due to fill, construction equipment or stockpiled materials should not be
                           located on the dune slope. Filling in the open space area is to be avoided.
                      2.4. The use of vibratory equipment of any kind is not permitted to be used, including
                           vibrating rollers, the use of vibrating installation techniques for sheet piling and other
                           construction vibrations caused by excavating, earthmoving or demolition machinery or
                           other similar construction techniques.
                      2.5. The builder, landscaper and all workers associated with the construction of the works
                           on this site shall at all times comply with the directions of the consulting geotechnical
                           engineer.
                      2.6. The applicant shall pay Council’s reasonable costs in relation to any geotechnical
                           advice sought by it in relation to this development provided that a quotation of the likely
                           costs to be incurred be obtained from the Council’s consultants Messrs Coffey
                           Geosciences Pty Ltd and that the amount of such costs be agreed to by the applicant
                           before the advice is obtained.
               Land Development
               3.     Roof and surface water is to be collected on site and is to be discharged through a single
                      underground drain line into the existing drainage channel in Sunshine Beach Park to the
                      reasonable satisfaction of the Manager - Land Development.
               Land Use
               4.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table below.

                        Plan No.       Rev.   Plan/Document Name                                      Date

                        DD.01          06     Proposed Site Plan prepared by Georgia Price Design     06.03.2024

                        DD.08          07     Level B Floor Plan prepared by Georgia Price Design     06.03.2024

                        DD.09          08     Level G Floor Plan prepared by Georgia Price Design     06.03.2024

                        DD.10          08     Level 1 – Floor Plan prepared by Georgia Price Design 06.03.2024

                        DD.11          07     Level 1 Roof Plan prepared by Georgia Price Design      06.03.2024

                        DD.12          07     Proposed West and North Elevations prepared by 06.03.2024
                                              Georgia Price Design

                        DD.13          07     Proposed East and South Elevations prepared by 06.03.2024
                                              Georgia Price Design



                                                                                                        Page 2 of 5
Document Set ID: 22887910
Version: 5, Version Date: 03/04/2024

Page 3

                        DD.14          06   Proposed Section A-A, B-B prepared by Georgia Price 06.03.2024
                                            Design

                        DD.15          05   Proposed Section C-C prepared by Georgia Price 06.03.2024
                                            Design

               5.     The development must be undertaken and operated in a manner that causes no detrimental
                      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
                      lighting nuisance or other emissions.
               6.     Existing trees on the site and within road reserves are to be retained, except where required
                      to be removed due to building operations or the conduct of the approved use.
               7.     The site must be landscaped to further enhance the existing native vegetation on the
                      property. The landscaping is to incorporate native coastal species endemic to the area.
                      Particular attention should be given to the western edge of the site to further screen the site
                      from the adjoining car park, the southern side of the site to enhance the native coastal
                      vegetation in this area, and along the eastern edge the Pandanus trees are to be retained
                      and this area further landscaped to provide a visual buffer between the site and the property
                      to the east.
               8.     This Development Permit for a material change of use of premises lapses if:-
                      8.1. the use or erection of a building or other structure associated with the use, has not
                           been commenced within four (4) years of the date of issue of the Development Permit,
                           unless application is made and approved by Council for an extension; or
                      8.2. the use of any premises pursuant to the Development Permit ceases.
               9.     All balustrades to decks and balcony areas must be open or transparent.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               1.     The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
                      Local Law No. 12, prevents a builder or building contractor carrying out building work on a
                      building site in a way that makes or causes audible noise to be made from the building work:-
                      1.1. On a Sunday or public holiday, at any time; or
                      1.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
                      A maximum penalty of $1,500 applies to an offence under this legislation.

                      Infrastructure Charges
               2.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further information, please refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.



                                                                                                        Page 3 of 5
Document Set ID: 22887910
Version: 5, Version Date: 03/04/2024

Page 4

               9.       FURTHER DEVELOPMENT PERMITS REQUIRED

               Not applicable.
               10.      SUBMISSIONS

               Not applicable.
               11.      RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               12.      OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.

               Yours faithfully,




               Nadine Gorton
               Coordinator Planning



               Enc:     Appeal Rights
                        Approved Plans/Documents
               cc.      Unitywater

               DECISION NOTICE HISTORY
               •     Original Decision Notice – 21 March 2002.

               •     Decision Notice - Minor 132001.210239.1 – 23 February 2021, Refused.

               •     Decision Notice - Minor 132001.210239.2 – 26 March 2024, with an amendment to condition 4 and additional condition 9.




                                                                                                                                 Page 4 of 5
Document Set ID: 22887910
Version: 5, Version Date: 03/04/2024

Page 5

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                    Page 5 of 5
Document Set ID: 22887910
Version: 5, Version Date: 03/04/2024

Used in these records

About this file

File size
146 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - 132001.210239.2 [As Published].pdf · 146 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.