Minor Change Existing Approval - 132001.210239.2 [As Published]
4. ASSESSMENT MANAGER CONDITIONS
Building
1. An identification survey of the subject site is to be carried out by a Licensed Surveyor and is
to be submitted to Council at the time of foundation inspection or immediately thereafter.
Such survey shall set out the boundaries of the site and the position of the buildings on the
site.
2. The geotechnical report submitted as part of your application has been appraised and
approved subject to the following conditions:
2.1. There is to be no uncontrolled discharge of water onto the slope.
2.2. Stripping of vegetation for construction purposes should be minimised. If vegetation is
destroyed it should be reinstated immediately after construction is completed.
2.3. Additional load due to fill, construction equipment or stockpiled materials should not be
located on the dune slope. Filling in the open space area is to be avoided.
2.4. The use of vibratory equipment of any kind is not permitted to be used, including
vibrating rollers, the use of vibrating installation techniques for sheet piling and other
construction vibrations caused by excavating, earthmoving or demolition machinery or
other similar construction techniques.
2.5. The builder, landscaper and all workers associated with the construction of the works
on this site shall at all times comply with the directions of the consulting geotechnical
engineer.
2.6. The applicant shall pay Council’s reasonable costs in relation to any geotechnical
advice sought by it in relation to this development provided that a quotation of the likely
costs to be incurred be obtained from the Council’s consultants Messrs Coffey
Geosciences Pty Ltd and that the amount of such costs be agreed to by the applicant
before the advice is obtained.
Land Development
3. Roof and surface water is to be collected on site and is to be discharged through a single
underground drain line into the existing drainage channel in Sunshine Beach Park to the
reasonable satisfaction of the Manager - Land Development.
Land Use
4. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
DD.01 06 Proposed Site Plan prepared by Georgia Price Design 06.03.2024
DD.08 07 Level B Floor Plan prepared by Georgia Price Design 06.03.2024
DD.09 08 Level G Floor Plan prepared by Georgia Price Design 06.03.2024
DD.10 08 Level 1 – Floor Plan prepared by Georgia Price Design 06.03.2024
DD.11 07 Level 1 Roof Plan prepared by Georgia Price Design 06.03.2024
DD.12 07 Proposed West and North Elevations prepared by 06.03.2024
Georgia Price Design
DD.13 07 Proposed East and South Elevations prepared by 06.03.2024
Georgia Price Design
Page 2 of 5
Document Set ID: 22887910
Version: 5, Version Date: 03/04/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 132001.210239.2 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 146 KB (small file)
- File type
No other editions are linked here.