GENERAL COMMITTEE MEETING AGENDA 13 DECEMBER 2021
Service Vehicles
8. Service vehicle parking, manoeuvring, and standing spaces must be provided on the site and
must include in particular a loading bay for a single unit truck 12 metres x 3.6 metres.
Landscaping
9. The development site must be landscaped in accordance with the approved site plan and be
provided to a minimum of 15% of the site. The works must be undertaken in accordance with
an Operational Works approval and PSP2 Landscaping in Noosa Plan, for that specific area
and must include in particular:
a. A 2 metre wide landscaping strip along the Rene St road frontage of the subject site,
exclusive of the access driveway.
Stormwater Drainage
10. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and generally in accordance with report titled “Preliminary Stormwater Management Plan”, rev
0, dated 7 October 2021 and prepared by RECOR Pty Ltd.
Easements
11. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered against
the title of the property.
12. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
13. All works must be kept clear of any existing or proposed easements on the subject land, unless
agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
14. All fill and associated batters must be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council. All earthworks must be
undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on
Earthworks for Commercial and Residential Developments.
15. Where the development involves excavation or filling over, or adjacent to, drainage, water
supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
provide a freeboard of 100mm above the finished ground surface level.
16. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that are
publicly accessible and exceed 1.0m in height must be fitted with a commercial grade safety
fence.
Damage to Services and Assets
17. Any damage caused to existing services and assets as a result of the development works must
be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
B. Refuse the Caretakers Accommodation for the following reason:
Page 7 of 65
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.