Original source · versioned page text
Decision Notice
Attached to the e-mail Applicant Request for Amended Decision Notice to update approved plan of subdivision & feedback regarding IC Notice - MCU15 0095 & REC15 0022.
Noosa Council documents
MCU15/0095
Stormwater
9. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval, and must include:
9.1. Stormwater system designed and constructed in accordance with Council’s
Planning Scheme Policy 5 – Engineering Design Standards – Roads,
Drainage and Earthworks
9.2. No adverse impact on other properties and the road’s footpath and grassed
verge (eg by diverting flows and/or blocking flows and causing additional
ponding)
9.3. Where applicable, extension of the site stormwater system to accommodate
stormwater from external site, including registration of drainage easements
9.4. The use of gravity stormwater drainage only and not surcharge pits or
pumps.
10. Stormwater runoff from the development must be disposed of without causing
scour or damage to the subject site or any adjoining property.
Water & Sewer Connections
11. An underground connection to reticulated water and sewerage must be provided to
each lot in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
12. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection
to reticulated water and sewerage has been provided to each lot.
6 REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Referral Agency and Referral Trigger Response
Status Address
Advice Energex Limited Proximity to Electrical The agency provided its
Agency Town Planning Substation response on 17
GPO Box 1461 December 2015. A copy
BRISBANE QLD 4001 is attached.
7 ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not
form part of the assessment manager conditions:
Infrastructure Charges
1. This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in
accordance with Council’s “Charges Resolution” made pursuant to the Sustainable
Planning Act 2009 and in conjunction with the State Planning Regulatory Provision
(Adopted Charges).
Page 3 of 21
Document Set ID: 20060077
Version: 1, Version Date: 29/04/2016 Print Date: 29 April 2016, 4:34 PM