Council archive · source document
Appendix B - PSCodes · RAL26/0026
RECONFIGURING A LOT CODE
Performance Outcomes Acceptable Outcomes Compliance Comments
û/ü/NA
centres, employment, education facilities, edges and are visually exposed to
community services, open space and roadways.
recreation facilities; AO9.3 Neighbourhoods (including roads, NA
(c) creates useable and interconnected pathways and open space) are designed
movement and open space networks; with a high degree of legibility with public
(d) effectively connects and integrates the site spaces and corridors easy to find and
with existing or planned development on recognise.
adjoining sites;
(e) provides for moderate and large size
developments to have multiple access
points;
(f) promotes a sense of community identity and
belonging;
(g) promotes a variety of streetscapes;
(h) provides for a high level of amenity, having
regard to potential noise, dust, odour and
lighting nuisance sources;
(i) integrates prominent site features including
landmarks, native vegetation and views into
the design;
(j) discourages crime or antisocial behaviour by
facilitating casual surveillance of streets,
paths and public open space;
(k) avoids the sporadic or out-of- sequence
creation of lots; and
(l) protects and enhances ecologically
important areas and provides for the
clustering of lots into cleared areas.
PO10 Infrastructure AO10 No acceptable outcome provided ü Proposed Lot 2 can be serviced with
Development accommodates and provides for the the required infrastructure.
efficient and timely delivery of infrastructure
appropriate to the site’s setting and intended use.
PO11 Roadway and pathway layout are predominantly AO11 No acceptable outcome provided NA No new roads or pathways are
rectilinear with a high degree of permeability. proposed or required.
Infrastructure and Services
PO12 New lots are located, sized and configured so as AO12.1 All lots are connected to power supply ü All lots will be connected to power
to ensure each lot is capable of being serviced by and telecommunications services and supply and telecommunications.
appropriate levels of infrastructure including: where located within the Urban
(a) power supply; boundaries, power supply and
Covey Associates Pty Ltd
Noosa Plan 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix B - PSCodes.pdfRelated documentApplication case desk ↗
About this file
- File size
- 184 KB (small file)
- File type
No other editions are linked here.