Skip to the record
Every meeting, every word.

Original source · versioned page text

Court order - approved (002)

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

P, 03/08

8. A Trade Waste Permit is required to discharge each type of Trade Waste. The
: hydraulic drawings arc to show all the Trade Waste requirements in accordance
with the Noosa Trade Waste Policy.

9. A place of food preparation and/or cooking is to have the liquid waste
connected to a trade waste line and to an approved grease arrestor of a size
determined by Council’s Trade Waste Policy.

10. Waste requirements are required to be in place, inspected and approved prior to
the commencement to trading or operation. The appropriate Trade Waste
Pemmits will be issued following the necessary approvals.

Land Development

11. Carparking shall be provided within the site as shown on plan 9977SKO1J dated

November 1999 as submitted by Greg Gibbs Architects for at least 14 spaces

os including a minimum of 4 covered spaces and 1 clearly marked disabled car

€ i spaces shall be included on site. The carparking area shall be designed to

— comply with the provisions of AS 2890.1-1993 for user class 3. The minimum
head clearance (headroom) at any point shal] be 2.3m.

-12. The existing overhead powerlines in James Street shall be taken underground
from the pole adjacent to the western end of the boundary between lots 1 and 5
on RP 226878 to the existing pole at the comer of Gympie Terrace and James
Street.

13. Prior to undertaking any excavation, the person acting on this permit shall
contact public utility service providers to ascertain the location of their

underground services.

14. The person actmg on this permit shall apply and obtain all other necessary
permits including crane permits, road opening permits, hoarding permits,
footpath occupation permits and/or any other approvals required under any other
Act.

15. Prior to commencement of work relating to a Development Permit for
Operational Works, the Applicant shall sign a written undertaking to be
responsible for the full cost of repairs to road pavement, footpath, kerb and
gutter, or other Council property damaged as a result of construction of the
proposed development.

If any person acting under this permit damages any Council property or
facilities (such as underground drainage, water supply and scwcrage), through
any cause whatsoever in the course of, directly or indirectly carrying out
development, that person shall forthwith notify the Manager - Land
Development and shall forthwith rectify that.damage at its cost. Alternatively,
the Applicant may request the Council to carry out the rectification works.

 
   

_ Any damage to a water main shall be rectified by Council. Any damage to a
#-%%, sewer main shall be undertaken by either Council or a Council approved

 
Log in to download the original file

Court order - approved (002).pdf · 2.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.