Court order - approved (002)

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

OT-NOV-02 TUE 17:10 NOOSA COUNCIL

16.

17.

18.

g 19.

20.

21.

22.

\
“3

In all cases, Council reserves the right to carry out rectification works in an
emergency and where no reasonable attempt has been made to complete the
rectification works as part of the development.

‘The carparking area shall be drained and the sealed pavement constructed to
access road standards. Plans and specifications for these works shall be
submitted in conjunction with an application for a Development Permit for
Operational Works.

All carparking shall be kept maintained and line-marked in a condition fit for
use, i

A 5.5m wide vehicular access from the James Street frontage of the site is to be
constructed to Council’s design standards.

All redundant vehicular crossings to the site shall be removed and replaced by
kerb and channel and footpath paving in accordance with Council’s Standard
specifications prior to commencement of the use permitted by this permit.

A contribution of $4,346 shall be paid to Council toward the cost of the
Noosaville Master Drainage Plan prior to issue of a Development Permit for
Operational Works. The amount of the contribution shall be adjusted in line
with changes to the Consumer Price Index, All Groups Brisbane from December
1999 until the date of payment.

Contributions shall be paid to Council in accordance with Planning Scheme
Policies PSP 28 and PSP 30 on. Water Supply Headworks Contributions and
Sewerage Headworks Contributions respectively and at the rates applicable at
the time of payment. An estimate only of the contribution rates as of February
2000 under the current policies is as follows:

Water Supply $10,378
Sewerage $12,305

TOTAL $22,683

Where a change in the levels of the site outside of an existing or proposed road
reserve is approved, the site shall be filled or cut so that each lot drains towards
a road frontage unless an existing or proposed drainage system will collect
stormwater from off each lot and discharge the stormwater to an adequate
Council stormwater drainage system.

Such works undertaken on the site shall be carried out in accordance with
Section 3.8 of Council's "Engineering Design Standards" Manual so as not to

 

A

“Ss Z
ewe SA ute withoul prejudice couditions sma.doc

P. 04/08
Log in to download the original file

Court order - approved (002).pdf · 2.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.