Court order - approved (002)

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

U(-NUV-U2 TUE LLU NOUSA COUNCIL

  

23.

24.

25s.

26.

27.

28.

29.

A registered practicing Geotechnical Engineer shall test the existing ground
conditions for suitability of placing additional fill, prior to such fill being
placed.

Filling works shall be restricted to the subject site. Batters shall be at a
maximum grade of 1:4 unless retained by a wall.

Any existing fill or natural materials on the site, which do not satisfy the
Geotechnical Engineer’s requirements, shall be removed and replaced with

suitable material.

Floor levels for the development are defined within the Planning Scheme. Fill
levels will be provided on application to Council's Works Directorate. If any
filling works are required on the site, they shall be carried out in accordance
with Section 3.8 of Council's "Engineering Design Standards" manual and so as
not to cause the ponding of water on any adjoining lands or the blockage of, or
interference with, any natural watercourses. No earthworks or filling works are
to be undertaken until issue of a Development Permit for Operational Works in
respect of fillmg works.

Fill imported to the site may only be from a site licensed with The
Environmental Protection Agency or from a site for which a Development
Permit for Operational Works has been issued approving the export of fill.

All separate, adjoining lots that form part of this application shall be
amalgamated into one undivided lot in accordance with Section 3.7.3 of the
Integrated Planning Act and the Plan of Survey submitted for registration at the
Land Titles Office. Proof of title being issued for the amalgamated lot shall be
submitted to Council prior to the issue of the Development Permit for Building

Works.

The site shall be connected to Council’s Water Supply and Sewerage
reticulation systems to the water and Sewerage design guidelines and the
requirements of the Manager - Land Development, at no cost to Council.

Each water connection to the water reticulation system shall extend to the

P. 05/08

property boundary and be metered. Where multiple units including leased |”

buildings are served by a single service, multiple water meters to each
individual unit or leased building shall be installed. All fees for the supply of
water meters shall be paid to the Council.

Roof and surface water is to be collected on site and is to be discharged through
a single underground drain line into existing drainage in Gympie Terrace or
James Street. In this regard, a grease/oil arrestor is to be provided on site to
ensure that polluted runoff does not enter Council's stormwater drainage system.

 

“4, &

i
i
i
if
&, fF
LeNremp\1860% Ha without prejudice conditions sma.doc
Log in to download the original file

Court order - approved (002).pdf · 2.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.