Information Response - Email 1 of 2 MCU16/0153 & REC16/0041
Very large file: it may take a few minutes
The original of this document is very large (22.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
ELEVATIONS FOR HOUSE TYPE 3 (SD13)
40. Floor and elevation plans for House Type 3 that accurately depict proposed building styles for this house
type.
Please refer to the architectural plans prepared by Sprout Architects (Attachment VII).
EARTHWORKS
41. Provide additional comment on:
a) the need for the proposed filling of the site and it’s impacts on the adjoining properties, and
b) a proposed retaining system (batters, walls and other structures) that is wholly contained
within the subject site
The proposed filling of the site is required to facilitate drainage to and provide fall through, the proposed
stormwater treatment devices. The proposed grading of the site generally will be required to provide
acceptable steps between the closely spaced driveways. The proposed extent of earthworks has been
amended to ensure that all retaining structures will be contained wholly within the development site. The
preliminary earthworks plan and Engineering Services Report prepared by Covey and Associates (Attachment
IX) has been amended to reflect this.
This response represents our complete response to the Information Request issued by the Noosa Shire Council,
and we will commence the Public Notification, in accordance with the relevant provisions of the Sustainable
Planning Act 2009.
As always, please feel free to contact me direct should you require any additional information or clarification.
Yours faithfully,
ADAMS + SPARKES
TOWN PLANNING + DEVELOPMENT
Cameron Adams
MANAGING DIRECTOR
Encl: Economic Response prepared by Urban Economics (Attachment I)
Stormwater Management Plan prepared by Covey and Associates (Attachment II)
Acoustic Response prepared by ASK Consulting (Attachment III),
Previously Approved Bushfire Management Plan dated February 2015 (Attachment IV)
Compliance assessment for Peregian Beach Market Place prepared by JWA Ecological Consultants (Attachment V)
Bushfire response prepared by JWA Ecological Consultants (Attachment VI)
Architectural Plans prepared by Sprout Architects (Attachment VII)
Arborist Report prepared by ETS Environmental Services (Attachment IIX)
Engineering Services Report prepared by Covey and Associates (Attachment IX)
Cc: Thomco No 2087 Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.