Original source · versioned page text
Information Response - Email 1 of 2 MCU16/0153 & REC16/0041
Very large file: it may take a few minutes
The original of this document is very large (22.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Peter Gintrac From: Adam McArthur <[email protected]> Sent: Tuesday, 21 March 2017 10:02 AM To: Peter Gintrac Cc: Matthew Figg; Mark Dunleavy ([email protected]) Subject: 170321 AM to PG RE: 215 David Low Way, Peregian Beach (162042 gen) Hi Peter, As you are aware, from an ecological perspective the two main concerns with stormwater discharge are Quality and Quantity. The site occurs adjacent to a low-lying area of wet heath vegetation known locally as Emu Swamp, which forms part of the Lake Weyba sub-catchment of the Noosa River catchment. It is understood from our discussions that stormwater will generally be discharged from the site after cycling through a bioretention system. This should adequately deal with the issue of Quality. In relation the Quantity, issues can arise at the point of discharge (i.e. scouring, erosion, deposition etc.) or in some cases more broadly through elevated water levels in adjoining habitat areas through increased peak flows. It is understood from our discussion and your email below that scour protection would be in place at the discharge point and that the velocity of the discharge would be controlled to ensure sheet flows from the site. This should adequately deal with issues at the discharge point and closely mimic natural flows from the site. With consideration of potential changes to hydrology in Emu Swamp as a result of increased peak flows from the development, it is likely that any increase in flow volume to Emu Swamp would be negligible. This is because the area within the subject site that drains into Emu Swamp forms an extremely small portion (likely less than 0.01%) of the local catchment. The small increases in peak volume predicted to be discharged from the subject site would therefore not be likely to elevate the water level in the Emu Swamp by any more than a few millimetres during peak flows. This is not considered to represent a significant impact on the hydrology of the Emu Swamp. Please don’t hesitate to contact me if you require any further information. Regards, Adam McArthur Principal Ecologist / Group Operations Manager T: 07 3219 9436 | F: 07 3423 2076 |M: 0467 099 119 | E: [email protected] Suite B, Building 11, Garden City Office Park, 2404 Logan Road, Eight Mile Plains QLD 4113 www.jwaec.com.au | ABN 18 862 767 739 From: Peter Gintrac [mailto:[email protected]] Sent: Monday, March 20, 2017 10:49 AM To: Adam McArthur <[email protected]> Cc: Matthew Figg <[email protected]> Subject: 215 David Low Way, Peregian Beach (162042 gen) Hi Adam, As discussed, we would like your input with regards to the stormwater outlet from our development, in particular the Stormwater Quantity aspect. 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.