 2022 Survey           30.3%    8.6 sec       18.3 sec        A   B           15.8m         11.5m   5.7m    12.0m
                                           (RT Grant St N)
 2024 Base             31.2%    8.7 sec      18.6 sec         A   B           16.4m         12.0m   6.1m    12.5m
                                          (UT Grant St N)
 2034 Base             36.5%    9.2 sec      20.8 sec         A   C           20.2m         14.7m   8.1m    15.6m
                                          (UT Grant St N)
 2024 Base +           31.8%    9.0 sec      19.0 sec         A   B           16.9m         12.4m   10.0m   13.2m
 Development                              (UT Grant St N)
 2034 Base +           37.4%    9.5 sec      21.2 sec         A   C           20.8m         15.2m   13.0m   16.2m
 Development                              (UT Grant St N)
 Weekday - PM Peak Hour

 2022 Survey           40.2%    9.0 sec      20.3 sec         A   C           19.9m         23.8m   5.6m    15.3m
                                          (UT Grant St N)
 2024 Base             41.7%    9.1 sec      20.8 sec         A   C           20.8m         24.9m   6.1m    16.0m
                                          (UT Grant St N)
 2034 Base             49.8%    9.9 sec      24.2 sec         A   C           26.7m         32.2m   8.5m    20.2m
                                          (UT Grant St N)
 2024 Base +           45.9%    9.7 sec      21.5 sec         A   C           22.3m         26.3m   14.1m   18.5m
 Development                              (UT Grant St N)
 2034 Base +           54.3%     10.9        25.2 sec         A   C           28.5m         37.3m   19.1m   22.9m
 Development                     sec      (UT Grant St N)
 Weekend – PM Peak
 2022 Survey           31.6%    8.1 sec      19.3 sec         A   B           16.8m         16.9m   3.1m    13.7m
                                          (UT Grant St N)
 2024 Base             32.6%    8.2 sec      19.7 sec         A   B           17.4m         17.6m   3.2m    14.3m
                                          (UT Grant St N)
 2034 Base             38.2%    8.7 sec      22.6 sec         A   C           21.5m         21.6m   4.7m    17.8m
                                          (UT Grant St N)
 2024 Base +           34.0%    8.8 sec      20.6 sec         A   C           18.5m         18.4m   12.0m   17.9m
 Development                              (UT Grant St N)
 2034 Base +           39.9%    9.5 sec      22.9 sec         A   C           22.9m         22.7m   15.7m   21.9m
 Development                              (UT Grant St N)

RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement
N – North, S – South, E – East, W - West
9.2.2        Analysis Conclusions
The analysis indicates that the roundabout is expected to operate at suitable levels at the 2034 design year,
with development traffic included, with a worst-case DOS 54.3% (less than 85.0%, operational capacity of
roundabout) and overall LOS A. The addition of the development traffic has no notable impact to key
operational metrics, with minor change to average intersection delay and at most an increase in queuing of
12m (equivalent to 2 vehicles).

Based on this assessment, the proposed development is considered to have no adverse impact on the
operations of this roundabout.

9.3          Analysis of Grant Street / Banksia Avenue



Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex                                                 32
Reference: 22BRT022 RP01_1
Log in to download the original file

RFI - Traffic Engineering Report.pdf · 19.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.