Outlined in Section 5, the access to the development will be achieved with the addition of a fourth leg to the
existing Grant Street / Banksia Avenue roundabout. The Sidra layout identified for this intersection is shown
in Figure 9-3. This layout is based on the concept intersection documented in TTM Drawing 22BRT0122-01,
Revision B, included in Appendix B.
Figure 9-3: Grant Street / Banksia Avenue SIDRA Layout
9.3.1 Analysis Results
The results of the SIDRA analysis for the 2034 Base + Development scenarios (both weekdays and weekends)
are summarised in Table 9-3. Detailed SIDRA output data is also included in Appendix E.
Table 9-3: Summary of Sidra Outputs (Grant Street / Banksia Avenue Roundabout)
Scenario DOS Average Delay LOS 95th Percentile Critical Queue (m)
Overall Worst Overall Worst Banksia Ave Grant Banksia Ave Site
Movement Movement (S) Street (E) (N) Access
(W)
Weekday - AM Peak Hour
2024 Base + 6.8% 5.5 sec 9.1 sec A A 0.1m 2.8m 2.3m 1.6m
Development (UT Banksia Ave
N)
Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex 33
Reference: 22BRT022 RP01_1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.