RFI - Traffic Engineering Report

of 132

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

 2034 Base +              7.2%   5.5 sec       9.1 sec            A   A       0.1m         3.0m   2.6m   1.6m
 Development                               (UT Banksia Ave
                                                 N)
 Weekday - PM Peak Hour

 2024 Base +              9.9%   5.3 sec       9.4 sec            A   A       0.1m         4.4m   1.8m   2.6m
 Development                               (UT Banksia Ave
                                                 N)
 2034 Base +           10.4%     5.5 sec       9.4 sec            A   A       0.1m         4.7m   2.0m   2.7m
 Development                               (UT Banksia Ave
                                                 N)
 Weekend – PM Peak
 2024 Base +           10.2%     5.3 sec       9.5 sec            A   A       0.1m         4.6m   2.3m   3.1m
 Development                               (UT Banksia Ave
                                                 N)
 2034 Base +           10.7%     5.4 sec       9.6 sec            A   A       0.1m         4.8m   2.6m   3.2m
 Development                               (UT Banksia Ave
                                                 N)

RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement
N – North, S – South, E – East, W – West


9.3.2       Analysis Conclusions
The analysis indicates that the roundabout is expected to operate at suitable levels at the 2034 design year,
with development traffic included, with a worst-case DOS 10.7% (less than 85.0%, operational capacity of
roundabout) and overall LOS A. The addition of the development traffic has no notable impact to key
operational metrics, with minor change to average intersection delay and queuing.

Based on this assessment, the proposed development is considered to have no adverse impact on the
operations of this roundabout.




Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex                                            34
Reference: 22BRT022 RP01_1
Log in to download the original file

RFI - Traffic Engineering Report.pdf · 19.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.