Response to Information Request - Received 31 May 2011 · OPW11/0098
SCRC CORRESPONDENCE
TGM Group Ballarat Malhnurne I f,PPlonn I Rallina
1315 tut street
Ballarat Vic 3350 Vh pi:^
PO Box 563W
Ballarat West Vic 3350
T 03 5330 8888
B0370352
TGM
F 03 5333 3815
25 May 2011
Project Reference: 4400-03
Mark Lewis,
Sunshine Coast Regional Council,
Locked Bag 72,
Sunshine Coast Mail Centre,
QLD 4560.
RE: OPW 11/0098 - Bunnings Noosaville Area A Filling
Dear Mark,
Further to the information request dated 21St April 2011 and subsequent computations and plans
submitted, this letter provides further clarification of the design of the proposed stormwater drainage and
method of stabilisation.
The proposed 750mm diameter RCP and headwall is designed to convey up to the 1 in 100 year rainfall
runoff from the entire site at 176 Eumundi Rd Noosaville (approximately 1 Ha), assuming a blockage
factor (BF) of 20% in accordance with Cl 10.04.10 of the QUDM. A headwall was adopted as the
preferred type of inlet due to its superior blockage avoidance compared to a grated pit or other similar
inlet configuration, where BF of 50% is recommended by the QUDM.
Headwater is expected to be 250mm above the obvert of the inlet at P04, or an RL of 15.40m AHD. This
is approximately 1.20m below the lowest pavement level on the site. Given the high energy losses
caused by the existing development outlet at this location (see attached photo) the proposed outfall is
not expected to be a constraint on flows from the site and the internal drainage system can be expected
to `back up' well before the capacity of the proposed outfall is reached. Therefore the proposed 750mm
diameter RCP and associated endwall is not expected to increase the existing water levels of the
development at 176 Eumundi Rd. Further development of the site would be subject to on-site detention
requirements in accordance with the QUDM and relevant council regulations.
The underground drainage system in Gateway Drive is not expected to convey the 1 in 100 year ARI
event from 176 Eumundi Rd. The diameter of the outfall pipe is `stepped down' at pit P02 to match the
diameter of the existing drain in Gateway Drive and allow excess flows to spill out into Gateway Drive.
This is essentially what occurred prior to the development of 178 Eumundi Rd (Bunnings site), as runoff
from 176 Eumundi Rd discharged across 178 Eumundi Rd and entered the Gateway Drive drainage
system via an endwall and 450mm diameter RCP.
Page 1 www.tgmgroup.com
ec IlOS
30 . I1o221 Io
(I)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
TGM The proposed filling is designed to match the levels of the existing finished surface at the north western boundary of 176 Eumundi Rd. Therefore in the event of the proposed stormwater drain completely blocking the site will still be free draining towards Gateway Drive across the interface between the proposed filling and the existing natural surface (refer Section A of Sheet CF1). Stabilisation will be via planting of appropriate shrubs and ground covers. Erosion mat is to be provided in the 'gully' that is formed at the interface of the filling and existing natural surface in the Area A' to prevent erosion during the plant establishment phase. If you have any further queries regarding this matter please contact Glenn Mansell at our Ballarat office. Yours faithfully TGM GROUP PTY LTD Ballarat Office per: GLENN MANSELL Senior Civil Engineer GM:gm
Page 3
Page No.:
Job No.:
Computed:
TGM
Engineers and Surveyors
Checked:
Date:
'1 r e
/0 1Q i t t I KQ `ear Tc^ CQ 70
cc.^a ^Oti
^af^ ^LZ^^t a-e4 o;y 1 S,f^e =
Sou O Oe)
^/a w /1 die
=e-'4.jX(^f4& 2- 42
36o C o• 9
34,
u
^^4P = 3 ° ^ ^ 3 ^ S > ^io
E11 4 1 , r,7 ?a 1.1 ^
lj
r
o PI. c 7 c. . ^, c° r ems, ^o
^w = /n o o = > a • 2 s^.,, aGev e eLVP, / OS
ACA.
V
Page 4
Page No.:
Job No.:
Computed: (iM
TGM
Engineers and Surveyors
Checked:
Date:
«rP^^ ,41 1 L • ee f p Q^FW q, PQ jr i I- : X6.6.
,G , P, /n f c aa rc^^^'" G jc, s ^Fi pct t'e`a
Lv o U ^^ z e l r/e l^ ^z 1< <c° r o ^^C J r cy u IFFY
Page 5
rr
ROAD DESIGN MANUAL
PIPE CULVERT FLOW
HEADWATER DEPTH FOR CONCRETE PIPES
INLET CONTROL
4500
EXAMPLE
4200 (1) (2) (3)
0 = 1050nm - 6-0
3900 0 = 3.38 comets 60
! Nil 50
3600
0 (m) 60 50
1000D (1) 2.5 2 .6
3300
E (2) 2.1 2.2 50
40
40
3000 (3) 2.15 2.3
50 00 (D in metres) 40
2700 3
40-00 30
2400 30-00 30
20 00
2100 20
20
L /
/
2.0
N 1800 1000
a^ / Q
C-
15
a 15
E 3
E
500 a)
a L 15
5-00 c-
a
U, 400/ E
1350 aa) 0
O E v
V
300
a
1200
/
w C3 200 Hw SCALE ENTRANCE
L
0 TYPE _ 10
J 10
01 50
u LLJ (1) Square edge with headwall .
LIJ 10
Cr (2) Groove end with headwall. = H
I alo
L
C) 100 (3) Groove end pro w 09
09
00 v
Cr N - 09
w 0 Cr
825 W
w F-
F 0.50 08 0a
a aG 4w- 3
O OB
0.40 Q
w
675
0 30
0-7
07
0-20
525
0-6
06
06
450
375
05
05
L05
0,03
300
6-91
Page 6
2A [OCR of page images] = a a D Q oO 3 ® = el, ie en ena
Used in these records
Response to Information Request - Received 31 May 2011Related documentApplication case desk ↗
About this file
- File size
- 951 KB (small file)
- File type
No other editions are linked here.