Council archive · source document
Response to Information Request - Received 31 May 2011 · OPW11/0098
TGM The proposed filling is designed to match the levels of the existing finished surface at the north western boundary of 176 Eumundi Rd. Therefore in the event of the proposed stormwater drain completely blocking the site will still be free draining towards Gateway Drive across the interface between the proposed filling and the existing natural surface (refer Section A of Sheet CF1). Stabilisation will be via planting of appropriate shrubs and ground covers. Erosion mat is to be provided in the 'gully' that is formed at the interface of the filling and existing natural surface in the Area A' to prevent erosion during the plant establishment phase. If you have any further queries regarding this matter please contact Glenn Mansell at our Ballarat office. Yours faithfully TGM GROUP PTY LTD Ballarat Office per: GLENN MANSELL Senior Civil Engineer GM:gm
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received 31 May 2011Related documentApplication case desk ↗
About this file
- File size
- 951 KB (small file)
- File type
No other editions are linked here.