07/0738 - Response to Information Request [As Published] · 132007.738
H ken hicks AND ASSOCIATES 20 February 2007 Our Ref: 070145T Council Ref: 2007/738 The Chief Executive Officer Noosa Shire Council PO Box 141 TEWANTIN QLD 4565 ATTENTION: Denis Wallace Dear Denis INFORMATION RESPONSE DEVELOPMENT PERMIT FOR AN INDUSTRIAL BUSINESS TYPE 1 (WAREHOUSE) & TYPE 2 (PRODUCTION, ALTERATION, REPACKAGING & REPAIRING) 64 GATEWAY DRIVE, NOOSAVILLE LOT 13 ON SP170295 Further to Council's Information Request of 4 June 2007 for the abovementioned proposal we now respond in full to each of the items raised. LAND USE Issue 1 Please indicate waste storage areas on plans and further detail how the proposal complies with the Specific Outcome 013 of the Business Uses Code. Comment: Waste storage will occur within each separate tenancy. Waste collection points and 3 bin wash areas are designated through the development as shown on the amended proposal plan attached in Appendix A. Further information on proposed waste management arrangements are detailed in the attached Waste Management Plan prepared by Cardno attached in Appendix B. Issue 2 It is considered that a development of this scale, with a number of smaller units/tenancies may generate traffic and parking demand that exceeds the minimum Vehicle Parking Requirements detailed in the Driveways and Carparking Code. Please provide a carparking and traffic generation report prepared by a suitably qualified person to address the requirements of Specific Outcome O9 of the Code. In this regard, it may be necessary to amend the plans to provide additional carparking spaces and/or reduced floor areas of the development. Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C addresses the parking requirements for the proposed development and confirms that suitable carparking provision is achieved. Issue 3 Please provide amended floor plans indicating end-of-trip facilities in accordance with Probable Solution $15.3 of the Driveways and Carparking Code. TOWN PLANNERS | CONSULTING SURVEYORS | URBAN DESIGNERS | PROJECT MANAGERS Kan Hicks & Associates Pty Ltd | Suite 7 Oalton Centre. 1 Newspaper Place Maroochydore BC QLD 4558, PO Box 6380. Marcochydore BC 4558 P 07 5443 284d ! F OF 54437145 | A.C.N. 010 274 823 | A.B.N. 74308 405611
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 62 pages
Page 2
-2- Comment: In accordance with Probable Solution $15.3 of the Driveways and Carparking Code, end of trip facilities are only required for the Industrial Use and are not required for the café. Each industrial tenancy will be provided with end-of trip facilities. Attached in Appendix A is an indicative floor plan indicating the proposed provision of end-of-trip facilities to be provided within each separate tenancy. Issue 4 i Please provide a noise and lighting assessment report prepared by a suitably qualified person to ! address the acoustic and lighting amenity issues raised in the Business Uses Code (specifically Qutcomes 03 and O11) with respect to the residential areas to the west of the site and any noise attenuation measures that may be necessary. | The acoustic report shall assess all potential noise sources and demonstrate how the development will not cause — e Excessive noise under Council's Local Law No. 12 - Control of Nuisances. , © Untawful environmental nuisance under the Environmental Protection Regulation 1998. i “It is noted that the existing development approval for the site (23074DA) involved a report of this ‘nature, prepared by,Cardno. MBK (Qld) Pty Ltd,.and. this may. be revised forthe new. proposal. Comment: A Noise and Lighting Assessment Report prepared by Cardno is attached in Appendix D. This report confirms that the development will not result in any detrimental noise or lighting impacts. [1sSue's”” we ee au ee cm ee (It is noted that the development is adjacent to bushfire hazard and areas mapped in The Noosa Plan — and includes significant buildings between these areas and the access/egress provided via Gateway . ‘Drive. Please provide a bushfire management report for the site prepared by a suitably qualified . person and include any necessary recommendations on amended plans. wee ee Comment: The Noosa Plan does not include the subject site within a bushfire hazard area nor does any boundary of the site adjoin an area designated as bushfire hazard area. As such and given that the application is code assessable, no need or requirement exists for provision of a bushfire management report. LAND DEVELOPMENT ‘Wie 6 wee ae - wee ee Please provide a detailed survey plan, prepared by a licensed land surveyor, of all existing features on site and on land adjacent to the site, such as any services (including their alignment, size, depth, invert level, etc) vegetation, topography of the land (contours) and any other relevant information. All level information shall be to the Australian Height Datum (AHD). Existing services that run through the site (including any easements) and existing vegetation to be retained should all be shown on the amended proposal plans. Where existing services are to be extended or new services are to be provided within the site, they should also be shown on the proposal plan to ensure that the proposed buildings do not conflict with ° such services. . d Comment: Existing contours and relevant services are shown on the plans prepared by Callaghan & Toth attached in Appendix E. These plans also provide details of the proposed finished site levels and sewer and stormwater layout.
Page 3
"Issue 7 ~
{Demonstrate that the car park area (including all car park spaces, manoeuvring areas, and
, driveways) comply with Australian Standard AS2890.1 — Off-street Car Parking. Some issues to be
addressed include:
Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C demonstrates
that the carpark area complies with Australian Standard AS2890.1 — Off-street Car Parking.
"Issue 7.1 - 7 ae awe meee mee em ee iain’ 1
,_ Demonstrate that adequate sight lines are available to and from Gateway Drive and internal to the
.site in accordance with section 3.2.4 of AS2890.1 |
Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C demonstrates
that adequate sight lines are available.
‘ssie72 07 nena fone ee wear ae ms
‘Demonstrating that a vehicle queue length on all driveways of at least 12m. is. provided. (measured
\ from the Gateway Drive property boundary into the site) whereby no parking spaces or manoeuvring 1
}areas are permitted in order to allow the free influx of traffic in accordance with section 3.4 of |
+AS2890.1.._. -—_. ae
Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C demonstrates
that adequate vehicle queue length is achieved.
ope a em me mm er . “
“Issue 7.3 ~
‘Demonstrate that the car park will be suitable to cater for pedestrians. In this regard specific
, attention needs to be given to section 4.1 of AS2890.1.. kk
Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C demonstrates
that the car park will be suitable to cater for pedestrians.
{Issue 7 7.4
: Demonstrate how it is intended to control vehicle speeds internal to the site given the long straight | i
.circulation aisles. In this regard speed humps or other, similar devices may be necessary... _ _ }
Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C indicates that
speed humps will be installed to control vehicle speeds.
— - me : ne : Pa + oe :
‘Issue 7.5
Demonstrate how safe pedestrian access is proposed to each of the Industrial Units, as the | i
‘entrances to most of the proposed units is presently proposed directly off the main circulation aisle.
*The present proposal raises safety concerns and the applicant will need to provide a means of |
‘separating pedestrian and vehicle safety to avoid any conflicts between the two. s
i
‘In this regard a 1.5m wide walkway, raised above the level of the circulating road, may be required
to the frontage of all of the Industria! Units to ensure adequate separation between pedestrians and" '
circulating traffic, and to allow pedestrian friendly access to the proposed buildings.
Provision of landscaping elements to the frontages of the industrial units should also be incorporated -
to soften the building facade, to create interest, and to assist in reducing vehicle speeds on the |
circulating aisle.
Page 4
-4- Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C demonstrates how safe pedestrian access is proposed to each of the Industrial Units. This includes provision of a pedestrian path around the entire site at a width of 1.2m which is the Australian Standard. “Issue 7.6 To prevent vehicles from encroaching over proposed landscaped areas, wheel stops will be necessary to most of the proposed car parking spaces and these wheel stops should be shown on the amended proposal plan. __ pe Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C details the circumstances under AS2890.1 in which wheel stops should be provided. Encroachment over landscaped areas is not one of these circumstances and as such wheel stops are not considered necessary. "Issue 7.7 ~ 7 1 Staff car park spaces on a development of this scale, with 44 different Units/tenancies, is‘ * inappropriate and will not function adequately. In accordance with AS2890.1, staff car parks cannot | be intermingled across the development but instead need to be kept together if they are to work | | ' properly. This however will be difficult to achieve in practice on this development due to the size of | the site. As such all spaces on site should be sized as standard spaces 2.6m wide x 5.4m long, ® unless the space is obstructed by an adjacent wall or fence, in which case the space will need to be | ‘at least 300mm wider.to allow access and room for.car,doors to open... _ Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C confirms that the amended carparking provision shown on the proposal plan is acceptable and appropriate for the use. (Issue 7.8 ' ' Provide at least 4-disabled carpark spaces (evenly distributed across the development to maximises .their usage) each with a minimum dimension of, 3.2m wide x 5.4m long. Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C confirms that only 2 disabled car spaces are required under AS2890.1. 3 disabled car spaces are proposed which is above standard. “Issue 8 Demonstrate that the car park area (including all loading areas, manoeuvring areas, and driveways) | I ‘comply with Australian Standard AS2890.2 — Commercial Vehicle Facilities. The issues addressed , Shall include: | eh ee ee Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C confirms that the carpark area complies with AS2890.2. Issue 8.1 Te : Cs Demonstrate that a 19m-semi trailer is capable of entering and leaving the site in a forward gear | with provision for such vehicle to be safely parked for loading and/or unloading without restricting , _the operation of the industrial facility. In this regard a designated semi trailer loading area needs to” be provided and this should be shown on the amended proposal plans along with the swept path of . this vehicle.
Page 5
-5- Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C indicates that provision for a semi-trailer is not required and that the appropriate service design vehicle would be a MRV. A HRV was nevertheless considered and can be appropriately accommodated through the site. ‘Issue 8.2 ~— , Demonstrate how it is intended to safely load and unload all trucks and commercial vehicles, as! ‘there is concern that these activities occurring in a common area could place other users of the site ‘at risk. In this regard, it may be necessary to provide additional loading bays to adequately serve the site. | Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C demonstrates how the proposal provides for service vehicles. Hissue 9 | ‘Demonstrate that adequate sight lines are available to all proposed pathways, with consideration | ‘given to cyclists who wilt be travelling at higher speeds than pedestrians and therefore will require * ‘greater sight distances. In this regard the positioning and alignment of the pathway between Units ; 110 & 11 (and linking to the Gateway Drive cul-de-sac) is considered dangerous in a number of ! different ways and will need to be reviewed. J Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C comments on the bicycle pathway. ee game de saa ‘Issue10 ~ 7 . “ee ,A 2m wide pathway should be provided around the cul-de-sac frontage of the development and this ; .should be shown on the amended proposal plans. ed Comment: A 2m wide pathway can be provided around the cul-de-sac frontage of the development and can be conditioned with the development permit and detailed as part of a subsequent Operational Works application. ' Illustrate the proposed finished floor levels of the proposed building and car parking areas on the ‘plans and elevations. Also provide a series of sections through the site to demonstrate the .telationship between the natural landform and the proposed industrial development. § Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F. ‘Issue 12 Indicate on the proposal plans the extent of cut/fill earthworks anticipated for the proposed _ development (including the extent of any batters and/or retaining walls) and provide an estimate of the volume of earthworks likely to occur in order to develop the site as proposed. __ —_ ee Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F. ‘Issue 13°” Illustrate on the proposal plan any retaining walls that may be necessary to support any fill material | placed on site and also indicate the height of these retaining walls. An indication of the type of .retaining walls to be constructed should also be given... Ce
Page 6
-6-
Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F.
| Demonstrate that each industrial unit will be capable of draining all effluent waste by gravity means
(Issue 14 ~ a ]
‘to Council’s sewerage reticulation network (i.e. without the need for pumps)...
Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F.
Issue 15
\ Demonstrate how internal access for maintenance purposes (by the owner and/or Council) will be
given to the southeast corner of the site where at least part of the development will need to be
connected to sewer. In this regard the proposal does not provide access to this part of the site due
to existing developments, likely future developments, and due to extensive vegetation in this area.
'To this end it is noted that the previous approval over the site (23704DA) had proposed a carparking |
! area in this part of the site and as such access would be more readily available by the owner and/or -
, Council if needed.
- : - f
‘In this regard, an access may need to be provided between Units 29 & 30 or alternatively have Unit —
29 setback sufficiently from the eastern boundary to allow access past the building and to the south
teast corner of the site.
Comment: The proposal plan has been amended to provide suitable access provision to the sewer
easement in the southeast corner of the site.
+ a -- -= eee we - ose ee 5
“Issue 16 ~~
{Illustrate on the proposal plans the location of the electrical substation and the location of the fire ;
;hydrant booster boxes that are likely to be required in order to serve the proposed development, |
‘with consideration given to how maintenance and/or emergency vehicle access to these services will
{be obtained.
Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F.
“Issue 17
Provide certification from a Registered Professionat Engineer Queensland demonstrating that each
- industrial unit will be above the estimated 1 in 100 year Average Recurrence Interval design storm ; ‘
(Q100). In this regard it is likely that the rear of the site will be subject to flooding from the Noosa i
River and Lake Doonella. 0 8 ee
Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F.
‘Issue 18”
All existing drainage flow paths that enter the site, whether overland or within a pipe, shall be {
‘accepted and safely carried through the site. In this regard Gateway Drive will act as an overland
flow path in a major storm event and due to the grade of this road stormwater runoff will be
directed into and across the subject site towards Lake Doonella at the rear. This overland flow will
,therefore need to be taken into consideration with the design of the industrial development and an
" appropriately sized flow path provided through the site to safely carry this volume of water past the |
Industrial Units.
As such, please arrange a Registered Professional Engineer Queensland to design the overland flow
path through, the site, with consideration given tothe actual, drainage catchment and the. future.
Page 7
-7- ‘in runoff. This overland flow path will need to be shown on the proposal plans for Council to review and ascertain the level of, impact. Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F. “Issite 19 ~ Demonstrate how the site is proposed to be drained such that there is no impact to any of the adjacent land and no increase in run-off for storm events up to and including a 1 in 100 year Average Recurrence Interval design storm (Q100). Consideration will also need to be given to the I ikely contaminants that could be expected off an industrial site and to erosion caused by | concentrated flows that scour the natural landform. It is noted that the present proposal does not give an indication of the extent of scour that could occur nor the measures that will be necessary to j avoid the affects of scouring. Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F. ‘Issue 20 ‘On review of the Stormwater Quality Management & Assessment Report by Callaghan & Toth it is | : noted that a number of different devices are proposed to manage and treat stormwater runoff. In this regard please indicate on the Architectural plans these devices (i.e. once they have been ! correctly sized to cater for the Q100 flow), particularly when they are proposed to be located above ground (such as rainwater tanks), as Council will need to review the devices in context with the \ , Proposed buildings and carpark. As such the Architectural plans and elevations will need to ber ‘reviewed. Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F. It is not considered necessary for rainwater tanks to be shown on the architectural plans or elevations as The Noosa Plan includes rainwater tanks as part of landscaped area. Further, elevations of rainwater tanks are irrelevant to engineering assessment of the proposal. "Issue 21 Please provide a detailed Traffic Report assessing the impacts of the proposed development and _ making recommendations as to the level of upgrading works that may be necessary to the road network to cater for the development. Traffic generation rates should be based on a worst-case scenario for the actual Uses proposed (including the Café and Outdoor Dining Area particularly if | that is what is going to be ultimately proposed by, the applicant). ‘ Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C provides an adequate traffic assessment of the development and concludes that traffic generation would have limited impact on the external road network and thus not require upgrading of external road networks, and as such a detailed traffic report is not necessary in this situation. “Issue 22 ees 7] Please submit a copy of the Environmental Management Plan for the site, and incorporate the relevant aspects of the Acid Sulphate Soil Report, the Stormwater Quality Management al Assessment Report, the Ecological Assessment Report, the Traffic Report, and any other site-specific s _reports, ne a ane om ve ee ere Comment: An Environmental Management Plan is not required for the assessment of this code assessable material change of use and can be imposed as a condition of the development permit and submitted as part of a subsequent Operational Works application.
Page 8
"Issue 23 . — It is noted that some of the outcomes proposed and recommended by the various reports submitted ;with the proposal are in conflict with one another. In this regard each individual consultant should 'be given copies of the other consultants reports to review and to ensure that they each have a workable and consistent approach to developing the site. The applicant should then review the .various reports to ensure consistency prior.to resubmitting the amended reports to Council. Comment: The reports submitted with the application were background documents to demonstrate that no specific site issues exist. Any specific site development requirements can be addressed by conditions of approval and integrated into a subsequent Environmental Management Plan. ENVIRONMENTAL SERVICES / WORKS roe eee oe eee one ee ——a ee Issue 24 | It is requested that further discussions are held with Council to confirm an appropriate layout for the ‘bicycle path any fire fighting access path. necessary to protect the development. Appropriate , , connectivity is also required with other development currently, being assessed in the area. __ Comment: The bicycle path has been located as discussed at the pre-lodgement meeting. As indicated in our response to issue 5 above, The Noosa Plan does not include the subject site within a bushfire hazard area nor does any boundary of the site adjoin an area designated as bushfire hazard area. As such a fire fighting access path is not necessary. ENVIRONMENTAL HEALTH ‘Sse 25 ™ 7 ° ee ‘Please submit a Waste Management Plan (Operational) in accordance with Planning Scheme Policy : | No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, for the day- | to-day operation of the development. i ! It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9: (explaining exactly how to predict waste quantities and design waste areas Is available from Council i ‘or online. The Plan shail include the following information: - « The types of waste that will be generated from the activities approved within the development. « €stimated volumes or tonnage of both recyclables and waste generated. e Methods to be used for dealing with garden waste. 1 ¢ Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling. ‘ e Description of procedures for getting all waste to the bins; the storage of bins and the f collection of bins by the contractor. 1 e A description of the design details of waste storage and recycling areas including size, location, elevation and floor plan, methods of bin washing and system to prevent storm water getting into sewer via the bin wash. e Adescription of types and volume of waste storage containers to be used. i e The waste and recycling storage area shall include the provision of containers for all waste and recycling materials including putresable matter, non-recycling waste, paper/ cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin washing facilities ' connected to sewer. ae eee ee eel
Page 9
-9- @ _A detailed description of vehicular access to collect waste. Where collection is off street, access must allow vehicles to enter and leave the site in a forward direction. Comment: A Waste Management Plan has been prepared by Cardno and is attached in Appendix B ‘"Issie26- 0° °° | ~ ~ The application has not addressed the typical uses that may be anticipated, and hence has not . allowed for associated infrastructure, vehicle wash down bays, sound-proof walls, grease traps etc. Given the difficulty in retrofitting such infrastructure consideration should be given to their provision § vat this stage. i Comment: It is expected that the development will cater for ‘light’ industrial uses, similar to uses which have already been established along Gateway Drive. It is not considered that any special provision needs to be incorporated for the likely future uses. The Information and Referral Stage of IDAS has now concluded and the application is now in the Decision Stage. Should you have any questions with respect to the above, please do not hesitate to contact me direct. Yours faithfully KEN HICKS & ASSOCIATES Scott Sobey DIRECTOR
Page 10
-10- APPENDIX A AMENDED PROPOSAL PLANS
Page 11
3TNAYSOON
JAIdd
AYMALVS
N LONIDSud LY
LNIWdO13A30
TWIdLSNGNi
a
FE
-
A
o
BAQMOLNIW
EUzy PURISUBSAD,
‘ospeing S79LNS “LL oa
Od 0) s2uzpUodsHH09 Ay
9OSRL6SS (20) ayuuIsze 4
POSSESS (20) auoud
qoeag WE SAU POEs
ates ULeN Pet ans
youeyews
SY ONKVEL “CLV Ald
SINYLINSNOO GNYULEWH
an
9060: ON BOF
80 @34: aLva
EXOD Ll (PTs)
TeAQIGGe
Buuued @ jo enssi
BU) J} (OUNED aug 10
AID ajo swvawasnbas
aut Buldysnes jo asodind
‘au Jo} pevedeid useq
easy SOUWMEIP OS@UL
“AUOUINE [FIO
8] UM BaBpo} Buieg
sued of soud sOuymeup
@60uy Jo slaadse JauIo [|e
pue Suucnsed pue sazs
sagen ‘purl ud Ounis
“suorsuaunp (fe AeA oF
a
“Cupurysino Bs 3995
jeunpertpue Aue ap yen
Sueld asauy jo a8n au 10}
Parss! 9q WA BURA] ON
pansst pus pasedsud
20 peidao
jou Aew pue spanipsy
au jo Ayado:d oq pur
wu6uAdoo si Bumesp 61
BOLE ON Bay ere uoIG
Teh 6IMaH
«
“SP b681 2zT6e
eres ueld aS
003 | 31VDS
2 oe ao wan
weRee Lo WAYW ONIGVOSGNY) WWLCL whee ceo wes cot tn oSr yay 259 WoL sare XUMONE SN WOSCNVT
a
3 ‘C3GMOad ONDE TYLOL a wrey 380 WLOL wee zee wht O01 we wZee ty2D) Wi THLOL > wen 229-0 TWwLoL
¥
¢ 0048 GTO = en09 aus a wae em (90) neva a we sri001 Wane LNRM
= =
a (44415) 30m OPT SID 70S ene ig2't way SNETUCE ute ae ook 198 iv 20) WRF HOO CNNOYD | 5 | ate yS PEL 334399 3é73S0K"N
7 aS vaevawn wo Teo Tina ibe! ae \ eases Tan THiNIN 8 ZOvINOHE
Py 00st S30¥05 escct i g 1
= Loy
Buryiedueg 2eq ays seasy Buipying , Fa ‘ah seoly Buidesspuey
ers
woorar
ES
88
%
¢ %
55.01.68 esms %
ater
z
vo
01.05 aap err
QELS BLZ eet
coonearee res mee
a
awe
seneezz30 sareezran
wien
uy
oe ao soe
paver [ogaezon | sue
ONITTINE LNOWS NOLYATTA HINOS
‘ONICTING LNON4 NOILVAITS HLYON
os att
Srovezza
ONITING LNOYd NOILVASTS 13a
ONIOTING LNONI NOLLVAR3 1saMm
Loe
|
seoone seuon0e
Bencieucsser 4 ‘ey seen sere saan jer pees
‘ONIOTING Uvgy NOLYATTA HL4ON
(000g
se msocere mood shames ances 2 oe ONICTING AVEY NOWYASTS 1S¥9 Ae Aeotesic ee
= mo 8888 on Lo — = = SS
@
toca eas pare
vowmes mene
ONIQTING HWA NOUVATTS 13M
SNITTING NVIw NOUYATTA HANOS
=o +o 0 © © 8888 8668
awe
Oa oo
sme La nerrees 98 ects wh ng sans pe meer ee Mn eg
surg -
Gunyed yes -
Bunved pelgesig -
9B) aE +
cera
=D» 00 68)
Page 12
Herwig Hartl
aren. bdebat fing No 7708
E pyr 1s copynght
and the property of the
27,520 Architects and may not
ne
o
2,700
6,211 __
70.
_. 12,161
150,
9,091
9,241
5,500
b
150, , 150.
4 150
150), 150
150 150 be retained, copied or
70, 1,200 7, 1,200.70 _ 4,730 150, 4,730 .— 20, 1,200_, ,, 1,200 ...70 weet co, osnee ana
site for which it has been,
. .6,000 150... 1,270 prepared and issued.
rt No Licance will be issued
__ 6,000 150... 1270 who ory orouechal
Te ” fees are outstanding.
builder and chent are
to varify all dimensions,
siting on land, window
¥ sizes and positioning and
af) ather aspects of these
drawings pnor to plans
being lodged with the
local authanty.
150 12,380
A150. 13,650 150
iS
iS
5
¢
4
150 eee 7,500 150, 6,000 150
oa
ig
io
iB
/
\,
Up
K
Y
xR
These drawings have
Ki MEZZANINE MEZZANINE 4M) MEZZANINE wt tansy
t requirements of the City
Sink and vermin E OVER OVER ‘On bag] == OVER ries
16 soot eupboar S| 00m 20 =f
, Pee Se),
Sink and vermin Sink and vermin Sink and vermin
euis
__proof cupboard _proof cupboard _ _Proof cupboard
Ce TT — -
SN 17 18 19
72.01 m? 70.92 m?
i
119,26 m? ‘
{
12,390
ui
MEZZANINE
OVER Up ue Tce
Carpart 33.90 m?
4: 100
%
%
Smartarch
Carpart Sute 144 Marina Mirage
‘Seaword Drive, Main Beach
Phone: (07) 5918503
Facsimille : (07) 55018606
All cotrespandence to PO
* box 11, Surters Paradise,
Queensland, 4217
J it i
tt
MINTGROVE
7a
|
c
4H
o
INDUSTRIAL
DEVELOPMENT
Typical floor plan. ‘ AT PRECINCT N
Scale 1:100 : DRIVE
NOOSAVILLE
eS
0 1 2 3 4 5
Scale as shown 1:100 to Standard A3 drawing.
Standard size A3 = 42cm x 29.7¢m
Page 13
-11- APPENDIX B OPERATIONAL WASTE MANAGEMENT PLANS
Page 14
CIS Cardno Shaping the Future GATEWAY DRIVE, NOOSAVILLE Operational Waste Management Plan 14 February 2008 Job No. 7800/62 Mintgrove Pty Ltd a |
Page 15
GATEWAY DRIVE, NOOSAVILLE < Cardno OPERATIONAL WASTE MANAGEMENT PLAN Cardno (Qld) Pty Ltd ABN 57 051 074 992 5 Gardner Close Milton Q 4064 PO Box 388 Toowong Queensland 4066 Australia Telephone: 07 3369 9822 Facsimile: 07 3369 9722 International: +61 7 3369 9822 [email protected] www.cardno.com.au Document Control Author Reviewer Version Date Name Initials Name Initials 1 23 January 2008 E. Young EY P. Jacob PJ 2 14 February 2008 E. Young af P. Jacob ees "© 2008 Cardno (Qld) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this document belongs to Cardno (Qld) Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person without the prior written consent of Cardno (Qid) Pty Ltd.” Mintgrove Pty Ltd Version 2 14 February 2008 1\7800-62\wp\Waste Management Plan (2) doc Commercial in Confidence Page i
Page 16
GATEWAY DRIVE, NOOSAVILLE )
OPERATIONAL WASTE MANAGEMENT PLAN C Cardno
GATEWAY DRIVE, NOOSAVILLE
OPERATIONAL WASTE MANAGEMENT PLAN
TABLE OF CONTENTS
1. INTRODUCTION... ecseseecnscrsesssseesesecssescessessecessaseusauseasanseesesssansesseesseneensesenseseersensens 1
2. WASTE STREAMS... eeeeseeceececeeeeececceesersneaceeeaseasseatsersetsceceneessessesseseseseesdsesoeseeesenanee 2
3. WASTE MANAGEMENT STRATEGIES ....00....-esccccesseseecsseveecesceeseeseseseatsscssseeeesasentaneesaeens 3
3.1. Council Requirements... cece neces ceeeeeeeeseeeseaeenneecieeesieenieesnesseeestennaees 3
3.2 Legislative Requirement... ec cee cceeeneeeeceseseaeeesectecseenseseneeesstensusenseesnsees 4
3.3. Waste Management Hierarchy ........0..00.00 cece cee ceeee teste esses seeeneecneeeiaaennieeseeea 4
3.3.1 Waste AVOIdane oo... ccccceeceeecetceteeeceeeceesetteeseneeteeerecaeensesetenteeneesereneee 4
3.3.2 Waste REUSC.... ccc ccc cee cect eeeereeetieesieteneeseeeesaeesiavesivertensrerneesntenes 4
3.3.3. Waste Recycling .......0... cece eceee erect enrseeneecreeniseesneecssenaenieeerireenerenies 5
3.3.4 Waste Disposal oo... ccccccccceeceeeeecceeeeaeeecsescsesesseenscesseecsesetanereecnerenenens 5
4. WASTE MANAGEMENT PLAN
4.1
4.2
4.3
4.4
45
4.6
4.7
4.8
49
Components of the Waste Management Plan ...
Terminology ..........cceceeeeceseeteerereetenseneeees
Rationale...
Objectives ....
Tasks/Actions................ we
4.5.1. Training and Education ..
4.5.2 Waste Quantities.........
4.5.3 Separation of Waste Materials .
4.5.4 Waste Storage and Processing
Performance Indicators 0.0.0.0...
Frequency/Timelines....
Responsibility ................
Monitoring and Recording
4.10 Corrective ACtiOn 2.00... cece ceenteceneescernsecetereceeseeesieeeeesesseeessesescesseeeniteeesenaees®
LIST OF FIGURES
Figure 1 Locality Plan
Figure 2 Site Layout Plan showing Waste Storage Area
APPENDICES
APPENDIX A Waste Register Form
APPENDIX B Corrective Action Request Form
Mintgrove Pty Ltd Version 2 14 February 2008
1A7800-62\wp\Waste Management Plan (2).doc Commercial in Confidence Page ii
Page 17
GATEWAY DRIVE, NOOSAVILLE < > Cardno OPERATIONAL WASTE MANAGEMENT PLAN 1. INTRODUCTION Mintgrove Pty Ltd proposes to develop a 42 lot light-industrial precinct at 64 Gateway Drive, Noosaville, also known as Lot 13 on SP170295, within the Noosa Shire Council (‘Council’). A development application (Applicant 07/0738) was made to Council in June 2007 for a development permit that would allow for an Industrial Business Type 1 (Warehouse) and Type 2 (Production, alternation, repackaging and repairing) to be developed at this site. A subsequent Information Request (reference number 2007/738) was issued by Council on 4 July 2007 requesting further information to be provided to assist in the assessment of the application. The information Request required a Waste Management Plan to be prepared in accordance with Council's Planning Scheme Policy No. 9 - Waste Management Mullti- Dwellings and Commercial and Industrial Premises, for the day-to-day operation of the development. Compliance with the Business Uses Code of the Noosa Planning Scheme in relation to waste storage areas was also requested. The purpose of this Waste Management Plan (‘WMP’) is to provide a waste management strategy for the operational phase of the proposed development. This WMP seeks to ensure that operation of industrial uses on the site do not adversely impact on areas adjacent to the site in terms of waste handling, storage and disposal. Furthermore, this WWMP seeks to limit the overall quantity of waste disposed throughout the site’s operation. Mintgrove Pty Ltd Version 2 14 February 2008 IA7600-G2\wp\Waste Management Plan (2).doc Commercial in Confidence Page 1
Page 18
GATEWAY DRIVE, NOOSAVILLE Cc ) Cardno OPERATIONAL WASTE MANAGEMENT PLAN 2. WASTE STREAMS Although specific operations for the site are unknown at this stage, the typical waste stream generated is likely to consist of light-industrial waste. Other likely waste streams include some food waste, garden/landscaping waste, general waste, and recyclables, including plastics, paper, cardboard, glass, metals, and organic wastes. The operation of the Cafe will generate grease and cooking oil waste. As such, a grease trap will be connected to all liquid outlets of the cafe. The grease trap will require quarterly maintenance by a licensed waste contractor. As only clean and low-intensity industry will operate from the site, the generation of hazardous and regulated wastes is not anticipated, and as such has not been considered in this WMP. However, if hazardous wastes are generated on-site, they will be stored, handled and disposed of in accordance with the relevant Australian Standard and the Environmental Protection Act 1994. Mintgrove Pty Ltd Version 2 14 February 2008 I\7800-G2\wp\Waste Management Plan (2).dec Commercial in Confidence Page 2
Page 19
GATEWAY DRIVE, NOOSAVILLE F S OPERATIONAL WASTE MANAGEMENT PLAN GC Cardno 3. WASTE MANAGEMENT STRATEGIES The operation of the site will involve the generation of general and commercial wastes. The following outlines the legislative requirements for waste management in Queensland. Also outlined are opportunities for the management and minimisation of wastes using the principles of the ‘waste management hierarchy’. 3.1 Council Requirements Council's Information Request (2007/738) requested the requirements of Specific Outcome 013 of Council's Business Uses Code to be addressed, as well as the preparation of a Waste Management Plan in accordance with Council's Pianning Scheme Policy No. 9 - Waste Management Multi-Dwellings and Commercial and Industrial Premises The requirements of Specific Outcome O13 of Council’s Business Uses Code are as follows. “Specific Outcome - Waste storage areas, external storage areas and loading docks do not detract from the visual amenity of the streetscape or cause nuisance to adjoining properties. Probable Solution - $13.1 Waste storage areas, external storage areas and loading docks are situated to the rear of the building or under the ground; or $13.2 With the exception of the access way, waste storage areas, external storage areas and loading docks are visually screened by landscaping or fencing.” The purpose of Planning Scheme Policy No. 9 - Waste Management Multi-Dwellings and Commercial and Industrial Premises (‘PSP9’) is as follows. “The purpose of this planning scheme policy is to- e support the Waste Management Code within the Noosa Plan in identifying planning and design considerations for waste management; « provide design criteria for waste management areas associated with development; ¢ ensure safe, hygienic, convenient and environmentally sustainable waste management practices; * encourage ongoing improvement in the proportion of waste recycled within the shire; and * provide efficient waste management practices that meet needs of occupants and contractors and minimises environmental nuisance to neighbours. The policy is an adjunct to existing waste management legislation, such as the Environmental Protection (Waste Management) Regulation 2000 and the Environmental Protection (Waste Management) Policy 2000, but does not seek fo duplicate this existing legislation.” Further to the requirements of PSP9, the overall outcomes of Council’s Waste Management Code are as follows. a) The storage, disposal and management of solid and liquid waste are conducted in a safe and ecologically sustainable manner and without environmental nuisance. b) The on-site storage of waste does not create environmental nuisance or visual impact to adjoining property during the construction of a development. Mintgrove Pty Ltd Version 2 14 February 2008 1:\7800-82\wp\Waste Management Plan (2).doc Commercial in Confidence Page 3
Page 20
GATEWAY DRIVE, NOOSAVILLE F S OPERATIONAL WASTE MANAGEMENT PLAN Cc Cardno c) Council and other licensed trade waste services are able to conveniently collect and dispose of waste generated by the development. Council's requirements have been considered during the preparation of this WMP to ensure a relevant and effective waste management strategy. 3.2 Legislative Requirements The Environmental Protection (Waste Management) Policy 2000 (the EPP Waste) and the Environmental Protection (Waste Management) Regulation 2000 are the primary legislative instruments governing waste management in Queensland. The EPP Waste provides for the preparation of waste management programmes to minimise waste generation, promote the efficient use of non-renewable resources and promote the use of waste as a resource in order to achieve the objectives of the Environment Protection Act 1994. The EPP Waste outlines a hierarchy of waste management to be adopted in the preparation of waste management programs. This hierarchy lists waste management practices in the preferred order of adoption; including waste avoidance as a first preference, followed by re-use, recycling and energy recovery and lastly, waste disposal. 3.3 Waste Management Hierarchy 3.3.1 Waste Avoidance Waste avoidance is achieved through the prevention and/or reduction of waste generated by an activity. Typically, prevention and/or reduction are achieved through process redesign or substitution of raw materials. This may include the following practices. e Efficient use of non-renewable resources including improved equipment use. e Accurate estimation of raw material quantities and use of just-in-time ordering to avoid excessive unused materials requiring disposal. e Selection of materials on the basis of waste minimisation (quantity of packaging etc). e Use of processes with high resource efficiency. e Installation of appliances and fittings to reduce operational waste. This element of the waste management hierarchy provides the greatest opportunity for limiting waste generated during the development'’s operation. 3.3.2 Waste Reuse Waste reuse refers to the use of waste products without the requirement of further processing. An example of waste reuse for resource conservation measures is the utilisation of multi-use containers and pallets. Such measures for waste reuse include: e the re-use of material containers; e the purchase of material in bulk form to avoid individual packaging; and e the promotion of the use of container return programs such as the delivery of materials on crates that are then returned to the manufacturer for re-use. Mintgrove Pty Ltd Version 2 14 February 2008 IA7B00-62\wp\Waste Management Plan (2).doc Commercial in Confidence Page 4
Page 21
GATEWAY DRIVE, NOOSAVILLE OPERATIONAL WASTE MANAGEMENT PLAN Cc Cardno 3.3.3 Waste Recycling Waste recycling refers to the reprocessing of waste materials to produce new products. Materials should be selected on the basis of recyclability, including end-of-life recyclability. Opportunities for waste recycling include: e materials salvage and reuse where possible; e the purchase of recyclable or recycled materials; * separation and collection of recyclable materials; and « mulching of garden/landscaping waste for reuse throughout on-site gardens. Waste reuse and recycling may be encouraged through provision of waste separation facilities and collection of recyclable materials by provision of general waste and recycling waste bins. This element of the waste hierarchy provides the extensive opportunity for minimising waste disposal during operation of the site. 3.3.4 Waste Disposal Waste disposal is the final deposit of waste when a material is of no further use. This includes the transport to, and final disposal, by landfill. As the least preferred and final option of the waste management hierarchy, waste disposal should only be used where the waste cannot be otherwise treated, re-used, or recycled. Mintgrove Pty Ltd Version 2 14 February 2008 1N7800-62\wp\Waste Management Pian (2).doc Commercial in Confidence Page 5
Page 22
GATEWAY DRIVE, NOOSAVILLE < > Cardno OPERATIONAL WASTE MANAGEMENT PLAN 4. WASTE MANAGEMENT PLAN This WMP has been prepared to reduce any environmental harm resulting from waste generation during the site’s operation. 4.1 Components of the Waste Management Plan Rationale - The intentions and principles of the WMP, providing the framework for tasks and actions to achieve the objectives for environmental protection. Objectives - Specific goals set for waste management to be achieved with regard to the rationale. Tasks/Actions - Measures to be implemented to manage the identified impacts and to implement the specified objectives. Performance Indicators - Criteria to be measured to ensure achievement of the waste management objectives. Frequency/Timelines - The time frame for each task and/or action is to be completed. Responsibility — The assignment of responsibility for undertaking each task and action, for monitoring any impacts, and for reporting requirements. Monitoring and Reporting - Monitoring and reporting requirements for the implementation of specified waste management measures. Corrective Actions - Measures to be undertaken if objectives, as identified through monitoring, are not achieved. 4.2 Terminology The term Developer refers to Mintgrove Pty Ltd. The term Body Corporate Manager refers to a designated representative of the Body Corporate, responsible for the operational management of the development. The term Owner/Lessee refers to any person and/or company carrying out business or undertaking an action within the completed development. The term Contractor refers to any company, or representative of such, hired to conduct business within the completed development on a temporary basis. The term Consultant refers to the civil and/or environmental engineering consultant employed by the Developer. The term WMP refers to this Waste Management Plan. Mintgrove Pty Ltd Version 2 14 February 2008 1.\7800-62\wp\Waste Management Plan (2).doc Commercial in Confidence Page 6
Page 23
GATEWAY DRIVE, NOOSAVILLE F Sy OPERATIONAL WASTE MANAGEMENT PLAN Cc / Cardno 4.3 Rationale A policy of waste management will be adopted for the site that ensures efficient and practical management of waste and that encourages continual improvement in waste management practices. The waste management hierarchy will be adopted for waste avoidance, reuse and recycling, ensuring disposal of wastes to landfill is the last option after all other options have been considered. The intentions of this WMP will be communicated to each Owner/Lessee (and their staff) and Contractor to ensure successful implementation. Adherence to this WMP will ensure compliance with the relevant legislation and regulations governing waste management and disposal. 4.4 Objectives The following objectives will be adopted for management of waste during the site's operation. e The provision of efficient waste management practices that meets the needs of each Owner/Lessee and Contractor, and minimises environmental nuisance to neighbours. e The provision of waste storage areas that do not detract from the visual amenity of the streetscape or cause nuisance to adjoining properties. e To employ waste avoidance and reduction strategies that eliminates waste generation in operational activities. This will include the review of operational procedures and the materials purchase process. e To implement measures to minimise the volume of waste sent to landfill and to prevent wastes entering the stormwater drainage network. 4.5 Tasks/Actions The following waste management tasks and actions shall be implemented by each operator on site. 4.5.1 Training and Education To ensure each Owner/Lessee understands and complies with this WMP, a clause stating recognition of and compliance with this WMP will be provided in each Owner/Lessee’s lease. Signature of the lease will imply compliance with this document. The Body Corporate Manager shall provide adequate information to each Owner/Lessee regarding the opportunities and procedures for waste minimisation and recycling on-site. The waste receptacles provided for each lot will be colour-coded and/or labelled to identify what wastes can be deposited in each bin. On-site signage will be utilised to clearly identify waste management areas throughout the site, including bin storage and wash-down areas. Mintgrove Pty Ltd Version 2 14 February 2008 1:\7800-62\wp\Waste Management Plan (2).doc. Commercial in Confidence Page 7
Page 24
GATEWAY DRIVE, NOOSAVILLE F » OPERATIONAL WASTE MANAGEMENT PLAN C Cardno 4.5.2 Waste Quantities The operations of each unit had not been finalised at the time of this report's preparation. Consequently, the expected quantity of waste generated on-site could not be determined. As such, a waste audit shall be conducted when the lease for each Owner/Lessee is finalised to determine the expected quantities of waste, and subsequently the required allocation of waste receptacles. 4.5.3 Separation of Waste Materials All waste materials shall be assessed for the ability to be reused or recycled to minimise the volume of waste requiring disposal. Waste materials that cannot be reused on-site shall be separated into designated storage bins for collection. Disposal of waste shall be considered as the last option, when all other strategies in the hierarchy of waste management have been considered. The Body Corporate Manger shall provide one general waste bin and one recyclable waste bin for the occupant of each lot to enable the separation of domestic waste and recyclable materials generated by on-site activities. Information shall be provided to each Owner/Lessee regarding the appropriate materials and methods for recycling. The colour of the bin and/or label will follow AS4123.7 - 2006 Mobile waste containers Part 7: Colours, markings and designation requirements outlined following. + General waste - Dark green or black bin with a red lid. « Recyclables — - Dark green or black bin with a yellow lid. Adequate signage shall be provided for all waste storage bins. Large items of waste that do not fit into waste receptacles shall be removed as soon as is practicable and not accumulated on-site. Bin compounds at each lot are to be designed and landscaped to blend in with the environment. Bin compounds shall be located so unobstructed access is available for manoeuvring bins for waste collection. The Body Corporate Manager shall ensure that a waste contractor is engaged to manage light-industrial wastes which will be transported for sorting at an appropriate waste management facility or for disposal at the Eumundi Road Landfill. Vegetation cleared during site maintenance shall be mulched for reuse as landscaping material. No waste materials shall be buried or burnt on-site. 4.5.4 Waste Storage and Processing All waste receptacles shail be held within the Owner/Lessee individual lease area, and will be adequately covered to avoid stormwater contamination. Cafe receptacles will be stored within the Cafe lease area, as shown on Figure 2. In the case additional waste storage capacity is required for a particular unit, the Owner/Lessee shall notify the Body Corporate Manger who shall subsequently organise the supply of the receptacle which shall be purchased by the Owner/Lessee. Mintgrove Pty Ltd Version 2 14 February 2008 1:\7800-82\wp\Waste Management Ptan (2).doc Commercial in Confidence Page 8
Page 25
GATEWAY DRIVE, NOOSAVILLE f » OPERATIONAL WASTE MANAGEMENT PLAN CG Cardno Each Owner/Lessee shall transport their waste receptacles to the designated Bin Collection Points, as illustrated on Figure 2, which shall be collected by a licensed waste contractor. The Bin Collection Points will service specific units, as follows. « Units 1 — 10 will have waste collected from the first collection point on Gateway Drive; e Units 11 ~ 15 and the Cafe will have waste collected from the second collection point on Gateway Drive; e Units 16 — 22 and 34 — 42 will have waste collected from the collection point within the loading bay, opposite Unit 19; and e Units 23 - 33 will have waste collected from the collection point at the eastern end of the site, adjacent Unit 25. Waste collection will involve one general waste collection per week and one recyclable waste collection per week by an appropriately licensed waste contractor. Each Owner/Lessee will transport the appropriate waste receptacle to the designated collection point weekly, or as required, no more than 24-hours before waste collection. Waste receptacles shall be moved back to the storage area within 24-hours of waste removal. Any additional waste storage receptacles shall be moved to the Bin Collection Points for waste collection as appropriate, and positioned so as to ensure unimpeded access for all vehicles. Additional waste collection services shall be organised by the Body Corporate Manager if required. A grease trap will be connected to all liquid outlets of the Cafe which will separate grease and cooking oil from waste water. Bin Wash-down Area Three bin wash-down areas shall be located throughout the site as shown on Figure 2. The bin wash-down areas will be designed and landscaped so as to blend with the overall landscaping style of the site. Unobstructed access for manoeuvring of waste receptacles will be provided in the design of each bin wash-down area, except during those periods when waste receptacles will be stored in the Bin Collection Points. Litter Control A weekly inspection of the Bin Collection Points will be completed by the Body Corporate Manager. The inspection will review bin capacity and determine if additional waste collection services will be required. Waste receptacles will be covered to prevent wind-blown litter. All waste transported off-site will be covered, where practicable. Odour and Dust Control The following strategies will be followed to minimise odour and dust generation and prevent environmental nuisance. « Waste receptacles for organic and food wastes will be covered. « The retention time of wastes on-site will be minimised i.e. additional waste collection services will be organised if required. Mintgrove Pty Ltd Version 2 14 February 2008 1\7800-82\wp\Waste Management Plan (2).doc Commercial in Confidence Page 9
Page 26
GATEWAY DRIVE, NOOSAVILLE C | > Cardno OPERATIONAL WASTE MANAGEMENT PLAN « Water captured in bunds and sumps will be processed and disposed of as soon as practicable. e All vehicles entering and leaving the site must be clean, and loads securely stowed and covered where practicable. Pest and Vermin Control Each Owner/Lessee and the Body Corporate Manager will facilitate the following strategies to prevent attracting pests, vermin and disease vectors to the facility as required. « Waste receptacles for organic and food wastes will be covered. « No pooling or ponding of spills or stormwater will be allowed around the individual bin storage areas or around the bin wash-down areas. e Pest exterminators are to be utilised on a periodic basis if required. e Training in appropriate housekeeping will be provided to each Owner/Lessee and Contractors. Stormwater Management The bin wash-down areas shall be fully bunded to prevent contamination of the surrounding environment. The area shall be fitted with stormwater diversion facilities. Wastewater will be diverted to sewer after initial treatment to trade waste disposal standards. Non-contaminated stormwater will be diverted from potentially contaminated areas. Spill management procedures will be developed and implemented for the site and spill kits provided. A weekly inspection of Bin Collection Points will be undertaken by the Body Corporate Manager. The inspection will assess housekeeping to ensure all drains are free of litter and are able to operate at optimum efficiency. Removal of Waste All vehicles entering and leaving the site must be clean, and loads securely stowed and covered where practicable. Wastes shall only be transported to recycling or disposal facilities licensed for the particular waste stream(s). The quantities of all wastes removed from the site will be recorded on a Waste Register Form by the Body Corporate Manager for a period of three months following the commencement of operation of the site. An example of a Waste Register From is provided in Appendix A of this WMP. Waste quantity and type will be assessed after this time period to determine if additional services and bin capacity will be required. 4.6 Performance Indicators Evidence of waste spillage or dispersal during inspections shall indicate non-compliance with the objectives and the tasks/actions outlined in this WMP. Visual inspection of on-site stormwater treatment measures shall be undertaken weekly during operation. Evidence of stormwater blockage by wastes or pollution shall indicate non-compliance with the objectives and the tasks/actions outlined in this WMP. Mintgrove Pty Ltd Version 2 14 February 2008 147800-62\wp\Waste Management Plan (2).doc Commercial in Confidence Page 10
Page 27
GATEWAY DRIVE, NOOSAVILLE F ‘» OPERATIONAL WASTE MANAGEMENT PLAN Ci Cardno No waste of any type shall be released from the development in an uncontrolled manner. 4.7 Frequency/Timelines During operation in normal trading periods, both general waste and recyclable waste shall be collected for disposal once per week by an appropriately licensed waste collection vehicle, and additional services arranged if required. Due to capacity limitations of Bin Collection Points, the collection of general waste is to be at a separate time to that of recyclable waste. Adequate time shall be provided between collection times so as to allow movement of waste receptacles as required. Visual inspections of all collection areas and stormwater drains shall be undertaken by the Body Corporate Manager on a weekly basis. The Cafe's grease trap shall be maintained on a quarterly basis, at minimum, or more frequently if required. 4.8 Responsibility The Body Corporate Manager and each Owner/Lessee will be responsible for ensuring compliance with the requirements of this WMP and for continual improvement of waste management practices within the development. Contractors employed by Body Corporate for site maintenance will be responsible for ensuring that waste is appropriately disposed of as required during their contract. The manager of the Cafe shall ensure the grease trap is maintained by an appropriately licensed waste contractor as required. 4.9 Monitoring and Recording Spillage or dispersal of waste material shall be reported to the Body Corporate Manager as soon as possible. In the event of non-compliance with this WMP, a review of the reasons for the failure will be undertaken and corrective measures will be implemented by the Body Corporate Manager. Corrective measures will include provision of additional waste receptacles or increase in the frequency of waste collection where required. If a spillage or dispersal of waste causes contamination of the site, the area affected by the spillage will be immediately remediated by the Owner/Lessee and any contamination reported to the relevant authorities. The Body Corporate Manager shall ensure the Cafe’s grease trap is maintained on a quarterly basis, at minimum, or as required. 4.10 Corrective Action Should there be non-compliance with the stated performance indicator the following corrective actions are to be implemented. e Identification of the cause of the non-compliance and completion of CAR form (provided in Appendix B). Mintgrove Pty Ltd Version 2 14 February 2008 17800-62\wp\Waste Management Plan (2).doc Commercial in Confidence Page 11
Page 28
GATEWAY DRIVE, NOOSAVILLE < Cardno OPERATIONAL WASTE MANAGEMENT PLAN « Action of the CAR form and implementation of appropriate mitigation measures as determined by the Body Corporate Manager in consultation with the Consultant. * Relevant validation monitoring to confirm that the nominated corrective actions have been effective. The Owner/Lessee shall implement the corrective action(s) as required within the agreed time frame noted on the CAR. Mintgrove Pty Ltd Version 2 14 February 2008 #:\7800-62\wp\Waste Management Plan (2),doc Commercial in Confidence Page 12
Page 29
GATEWAY DRIVE, NOOSAVILLE Cc Cardno OPERATIONAL WASTE MANAGEMENT PLAN FIGURES Figure 1 Locality Plan Figure 2. Site Layout Plan showing Bin Collection Points Mintgrove Pty Ltd Version 2 14 February 2008 1:\7800-62twp\Waste Management Ptan (2).doc Commercial in Confidence
Page 30
GATEWAY DRIVE, NOOSAVILLE
WASTE MANAGEMENT PLAN
Morghorn Dietricie
MeN OUT HG EH
ee
Peers
. Weetern Dierkts
SILOM
SITE Ses. Sutter OG til,
d —
Scale 1:20,000 (A4) ss 4 INOTTO SCALE re _toxrmnnor
Map reproduced with permission of UBD.
Copyright Universal Publishers Pty Ltd DG 01,06
FIGURE 1
SITE LOCALITY PLAN
Rev: Orig. Date: 12 November 2007 ___ProjectNo.: 7800/62
Mintgrove Pty Ltd
Page 31
on Aig anouB july, 29) 0082 “ON Ya[Oig ries 7 i g002 Aueniqaye) :aleq “Bu :nay INIOd NOILO31T109 NIP DNIMOHS NV1d LNOAVT ALIS . é SYNDdDIsS . sown wo oun 5 a|B9S OL ION L ON 1984S “GL7 Ald SLNVLINSNOO GNVILYVH WO4; pecunos aBeu| Bally UMOP-USeM Ig cS JUIOg UONIA!JOD ulg Ey Asepunog ays C_] QN3931 OF 0-66 8eBME 3 3 206 60590 £1 coset Or F tras 8h St ba. cs Dr 03 ke. NW1d LNSWS9VNVW 3LSVM ATMAVSOON 'SAING AVMALVS
Page 32
GATEWAY DRIVE, NOOSAVILLE F S OPERATIONAL WASTE MANAGEMENT PLAN Ci Cardno APPENDIX A Waste Register Form Mintgrove Pty Ltd Version 2 14 February 2008 1:\7800-62\wp\Waste Management Plan (2) doc Commercial in Confidence
Page 33
GATEWAY DRIVE, NOOSAVILLE OPERATIONAL WASTE MANAGEMENT PLAN G Cardno Waste Register Site Material Destination Reuse and Recycling Disposal Type of material Estimated Volume (m’) On Island (Specify Proposed reuse or on- site recycling methods) Off Island (Specify contractor and recycling outlet) Specify disposal facitity Timber and vegetation Scrap metal Cable and wires Concrete, bricks, tiles and rubble Plasterboard Packaging materials (plastics, glass and timber) Domestic and general waste Organic and food waste Wastewater Diesel and other fuels Paints and other chemicals Asbestos Mintgrove Pty Ltd I:\7800-62\wp\Waste Management Plan (2).doc Version 2 Commercial in Confidence 14 February 2008
Page 34
OPERATIONAL WASTE MANAGEMENT PLAN GATEWAY DRIVE, NOOSAVILLE < | Cardno APPENDIX B Corrective Action Request Form Mintgrove Pty Ltd Version 2 14 February 2008 (\7800-62wp\Waste Management Plan (2).doc Commercial in Confidence
Page 35
GATEWAY DRIVE, NOOSAVILLE f ) OPERATIONAL WASTE MANAGEMENT PLAN Cc Cardno CORRECTIVE ACTION REQUEST Operator Name: Date: DETAILS OF NON-CONFORMANCE; Inspected by: DETAILS OF PROPOSED ACTION: Passed to Body Corporate Manager (as applicable): yes / no Date: CONSULTANT ADVICE (as required): Date action required by (if applicable): Signed (by Consultant representative): Date: BODY CORPORATE AUTHORITY TO PROCEED: Sign: Date: ACTION CARRIED OUT: Sign: Date: RE-INSPECTION CONDUCTED BY: Sign: Date: COPY OF CAR ISSUED TO OPERATOR: Sign: Date: Mintgrove Pty Ltd Version 2 14 February 2008 |N7800-62\wp\Waste Management Plan (2).doc. Commercial in Confidence
Page 36
-12- APPENDIX C TRAFFIC ENGINEERING DESIGN NOTE
Page 37
Cardno Eppell Olsen Pty Ltd
> Cardno ‘ABN 82 095 614 154
Transportation and Traffic
Ep, iP ell Olsen Specialists
Level 1, 9 Gardner Close, Milton QLD
4064
PO Box 388 Toowong, Queensland
Our Ref. 780062: KB/AB 4066 Australia
Date:
Telephone: 07 3310 2401
Facsimile: 07 3369 9722
Email: [email protected]
20 February 2008
DESIGN NOTE www.cardno.com,.au/eo
NOOSAVILLE INDUSTRIAL BUSINESS DEVELOPMENT
64 GATEWAY DRIVE, NOOSAVILLE
RESPONSE TO NOOSA SHIRE COUNCIL’S INFORMATION REQUEST
Reference is made to Noosa Shire Council's request for further information received via a letter dated 4
June 2007 regarding the proposed development of an industrial business located on property at 64
Gateway Drive, described as Lot 13 SP170295.
The traffic and transportation related issues identified by Council are addressed herein. The individual
information request items are reproduced herein for ease of reference.
The development is proposed to incorporate 42 tenancies with a total of 4,532sq.m of Industrial
Business Uses and 100sq.m of Café Uses.
Council Condition - 2
“It is considered that a development of this scale, with a number of smaller units/tenancies may
generate traffic and parking demand that exceeds the minimum Vehicle Parking Requirements detailed
in the Driveways and Car Parking Code. Please provide a car parking and traffic generation report
prepared by a suitably qualified person to address the requirements of Specific Outcome O9 of the
code. In this regard, it may be necessary to amend the plans to provide additional car parking spaces
and/or reduced fioor areas of the development.”
Response
To accommodate the parking requirements of the industrial business development, a total of 97 spaces
are proposed. These spaces are to consist of:
. 65 spaces to AS/NZS 2890.1 Class 3 (width 2.6 x 4.8m length plus 600mm overhang);
. 29 small car spaces to AS/NZS 2890.1 Clause 2.3.4 (iii) (width 2.4 x 5.4m length);
. 3 disabled spaces complying to AS2890.6 (width 3.6m x length 5.4m including 600mm
overhang).
The car parking requirements for the development have been determined based upon rates quoted in
Table 14-47 of The Noosa Plan. Since the tenants of the development are not yet known, sensitivity
analysis has been completed using:
. a worse case scenario of 100% type 1 Industrial Business being Warehouse;
. a more realistic case scenario of 50% type 1 Industrial Business being Warehouse and
50% type 1 Industrial Business being production, alteration, repackaging & repairing.
The appropriate {and uses, yields and corresponding car parking rates are included in Tables 1 and
Tables 2 respectively.
G:A780062 Noosaville Industrial\780062 DRAFT CEO RFI DN_20080220.doc
Page 38
2 CJ Cardno Eppell Olsen Table 1 Development Car Parking Requirements for Type 1 . ; Car Parking Land Use Yield Car Parking Rate Requirement Type 1 Industrial Business 4,532sq.m 1 space/50sq.m 91 spaces Type 1 Entertainment and 100sq.m 1 space/10sq.m 10 spaces Dining Businesses TOTAL 4,632sq.m 101 spaces Table 2 Development Car Parking Requirements for Type 1 & 2 . Car Parking Land Use Yield Car Parking Rate Requirement Type 1 Industrial Business 2,266sq.m 1 space/50sq.m 46 spaces Type 2 Industrial Business 2,266sq.m 41 space/50sq.m for first 500sq.m and 28 spaces 1 space/100sq.m thereafter Type 1 Entertainment and 100sq.m 1 space/10sq.m 10 spaces Dining Businesses TOTAL 4,632sq.m 84 spaces A previous development by the applicant along Gateway Drive shows that it is extremely unlikely that 100% of the tenancies would be used for type 1 industrial being warehouses. Therefore, using the results shown in Table 2 of a car parking demand of 84 spaces, the spaces provided by the proposed development is within the Noosa Plan and considered adequate. Furthermore, the proposed development includes 2 racks for 25 bicycles totally 50 spaces plus each tenant will have showering facilities which allows for high levels of active transport, reducing the car parking demand. The Noosa Plan only requires 1 bicycle parking space per 100m2 for Industrial Business type 2, equating to 45 spaces. There are no bicycle parking requirements for type 1 entertainment and dining businesses. In addition, it is likely that the majority of customers to the café component of the development are likely to come from the industrial buildings. Thus, the provision of ten spaces is considered to be more than reasonable for the café component of the development. The expected peak traffic generation for the site has been determined based upon traffic generation rates published in TAG. The rates given for the land uses within the development are as follows: . Light Industrial: 0.9 vehicles/100sq.m GFA; . Restaurant: 5 vehicles/100sq.m GFA. Based upon these rates the expected traffic generation is as shown in Table 3. Table 3 Expected Peak Hour Traffic Generation . Peak Traffic Generation Expected Peak Land Use Yield Rate Generation Industrial Business 4,532sq.m 0.9 vehicles/100sq.m GFA 41 vehicles Café 100sqg.m 5 vehicles/100sq.m GFA 5 vehicles TOTAL 4,843sq.m 46 vehicles AM Peak - 70% in/30% Out 33 Cars In/ 13 Cars Out PM Peak — 30% in/70% Out 13 Cars In/ 33 Cars Out The development is expected to generate a total of 46 vehicles per hour during the road network peaks. This is considered to be somewhat conservative, as it is likely that trips to the café use will be made in conjunction with a trip to the industrial use of the development plus the high levels of active transport available at the site will further reduce the sites traffic generation. G:\780062 Noosaville tndustrial\780062 DRAFT CEO RFI DN_20080220.doc
Page 39
: Q> Santee, Therefore, the traffic generated in the AM and PM peak hours would have limited impact on the external road network and thus not require any upgrading of external road networks, so a detailed traffic report would not be necessary in this situation. Council Condition - 7 “Demonstrate that the car park areas (including all car park spaces, manoeuvring areas, and driveways) comply with Australian Standard AS2890.1 — Off-street Car Parking. Some issues to be addressed include: Response The car parking area has been designed in accordance with Australian Standard 2890. 1:2004 Parking Facilities, Part 1: Off-street Car Parking. All circulation aisles have been designed such that they are one-way and have a width of 5.8m. Since the users of the development are considered to be defined as User Class 3 (customers) and Class 1 (staff) this is considered to be appropriate. The minimum car parking space width specified for these users is 2.4m for staff and 2.6m for customers. As spaces of both widths are to be provided throughout the site, the employee spaces may be designated as such though the use of line marking and signage. All of the 90 degree angle spaces that are located through the centre of the site will have a length of 4.8m. This is appropriate given that these vehicles are abie to overhang into the central area. The spaces located immediately in front of the industrial buildings are proposed to have a length of 5.4m. Drawings CE780062-1 (refer Appendix A) shows the swept paths of a car at the intended bay areas which may be considered the more difficult of spaces to park in. Council Condition — 7.1 “Demonstrate the adequate sight lines are available to and from Gateway Drive and internal to the site in accordance with section 3.2.4 of AS2890. 1.” Response Since the proposed site is at the end of a cul-de-sac and has a roundabout controlling movement priority, the design speeds to the site would be approximately 20km/hr and from the site even less. Furthermore, the bend in Gateway Drive approximately 150m south of the roundabout will limit the speed approaching the site. Therefore, to demonstrate the adequate sight lines is considered unnecessary as the sight distance required for speeds of 20km/h and lower are not even included in section 3.2.4 of AS2890.1. Nevertheless, the sight distance available at the site access intersection with Gateway Drive with the highest conflict speed is illustrated for a design speed of 40km/h on Drawing Number CE780062-2 which is included at Appendix A and is considered to be appropriate. Council Condition - 7.2 “Demonstrating that a vehicle queue length on all driveways of at least 12m is provided (Measured from the Gateway Drive property boundary into the site) whereby no parking spaces or manoeuvring areas are permitted in the order to allow the free influx of traffic in accordance with Section 3.4 of AS2890.1.” Response Table 3.3 of AS2890.1, states that the minimum queuing length that should be accommodated shall be the greater of a minimum of two cars or 3% of the capacity of the car park for not more than 100 cars. Therefore, for this development the required queue length at the entrance to the site should be able to store three vehicle tengths, with three car lengths for the 88 spaces to the east and 1 car length for the 9 spaces to the west. Drawing Number CE780062-2 (refer Appendix A) shows that these queues can be accommodated at the entry to the site. G:\780062 Noosaville Industria\780062 DRAFT CEO RFI ON_20080220.doc
Page 40
‘ CJ Cardno Eppell Olsen Council Condition — 7.3 “Demonstrate that the car park will be suitable to cater for pedestrians. In this regard specific attention needs to be given to section 4.1 of AS2890.1.” Response A pedestrian path 1.2m wide has been provided around the entire site and is considered appropriate. As described above, the traffic generation of this proposed development is very low and therefore the number of vehicles within the car park and circulation aisle is very low and as such is not considered to pose a significant hazard to pedestrians. Council Condition - 7.4 “Demonstrate how it is intended to control vehicle speeds internal to the site given the long straight circulation aisles. In this regard speed humps or other similar devices may be necessary.” Response Speed humps will be installed along the circulation aisles immediately after the loading bay as shown on drawing number CE780062-1 (refer Appendix A). The humps have been located adjacent to the landscaping section as it is approximately half way along the circulation aisle, and will not effect vehicles either parking or vehicles unloading in the bay. Council Condition — 7.5 “Demonstrate how safe pedestrian access is proposed to each of the Industrial Units, as the entrances to most of the proposed units is presently proposed directly off the main circulation aisle. The present proposal raises safety concerns and the applicant will need to provide a means of separating pedestrian and vehicle safety to avoid any conflicts between the two. in this regard a 1.5m wide walkway, raised above the level of the circulating road, may be required to the frontage of aif the Industrial Units to ensure adequate separation between pedestrians and circulating traffic, and to allow pedestrian friendly access to the proposed buildings. Provision of landscaping elements to the frontages of the Industrial Units should also be incorporated to soften the building facade, to create interest, and to assist in reducing vehicle speeds on the circulating aisle.” Response Pedestrian paths have been provided around the entire site at a width of 1.2m which is the Australian Standard acceptable minimal width. Raised paths are not considered appropriate for this site as they may pose a trip and fall safety hazard for customers and staff carrying goods from the tenants’ areas to vehicles. Since the development consists of small light industrial tenancies, they will have relatively low pedestrian activity as therefore the pedestrian paths are considered appropriate. In addition, as stated above the traffic generation of this proposed development is very low and therefore the number of vehicles within the car park and circulation aisle is very low and as such is not considered to pose a significant hazard to pedestrians. Due to the small size of the development landscape elements to the frontages of the units can not be provided and are not considered to reduce the vehicles speeds like a landscaped street frontage development would. Instead the buildings fagade themselves has been modified with varying form and articulation to soften the hard building edge and create the interest. G\780062 Noosaville Industrial\780062 DRAFT CEO RFI DN_20080220.doc
Page 41
5 < j Cardno Eppell Olsen Council Condition — 7.6 “To prevent vehicles from encroaching over proposed landscaped areas, wheel stops will be necessary to most of the proposed car parking spaces and these wheel stops should be shown on the amended proposal plan.” Response Section 2.4.5.4 of AS2890.1 states wheel stops may be provided where it is necessary to limit the travel of vehicles into a parking space and typical uses are for the following: . control of kerb overhang where inconvenient or hazardous for pedestrians; . inhibiting contact with an end barrier or high kerb; . inhibiting encroachment into an opposing parking space. As none of these conditions are and therefore the requirement of wheel stops is considered unnecessary. Council Condition — 7.7 "Staff car park spaces on a development of this scale, with 44 different unitstenancies, is appropriate and will not function adequately. In accordance with AS2890.1, staff car parks cannot be intermingled across the development but instead need to be kept together if they are to work properly. This however will be difficult to achieve in practice on this development due to the size of the site. As such all spaces on site should be sized as standard spaces 2.6m wide x 5.4m long, unless the space is obstructed by an adjacent wall or fence, in which case the space will need to be at least 300mm wider to allow access room for car doors fo open.” Response As discussed above, the car parking sizes provided are generally at Australian Standards for visitors and staff car parking areas will not be specifically marked across the site, with the exception of the five indented areas with 4 car spaces which may be marked for staff use only. The central car parking aisle provides standard spaces at 2.6m wide x 5.4m long including 600mm overhang. Council Condition — 7.8 “Provide at least four disabled car park spaces (evenly distributed across the development to maximises their usage) each with a minimum dimension of 3.2m wide x 5.4m long.” Response Table C1 of AS2890.1 (1993), recommends 1-2% of car parking provision should be provided for disabled spaces for retail/commercial uses. This is considered the most appropriate rate compared to the other land uses within table C1 for this development and thus only a maximum of 2 car spaces are required. There are 3 disabled spaces proposed and therefore the number provided is above standard. The dimensions of the bays provided are a minimum of 5.4m (including 600mm overhang for bays 1 and 10) x 3.7m which is considered appropriate. Council Condition - 8 “Demonstrate that the car park area (including all loading areas, manoeuvring areas, and driveways) comply with Australian Standard AS2890.2 - Commercial Vehicle Facilities. The issues addressed Shall include:” Response See next item. G:\780062 Noosaville Industrial\780062 DRAFT CEO RFi DN_20080220.doc
Page 42
6 C j Cardno Eppell Olsen Council Condition — 8.1 “Demonstrate that a 19m-semi trailer is capable of entering or leaving the site in forward gear with provision for such vehicle to be safely parked for loading and/or unloading without restricting the operation of the industrials facility. In this regard a designated semi trailer loading area needs to be provided and this should be shown on the amended proposal plans along with the swept path of this vehicle.” Response The requirement of providing for a 19m semi-trailer is considered inappropriate as we assume this condition has been based on the fact that the total area of industrial business is over 2,000sq.m. Table 14.47 of the Noosa Plan states that for type 2 industrial business provision for a semi-irailer of 15m x 3.6m to unload and manoeuvre is required. The site areas stated are only applicable for developments with a single tenant, not the 42 small tenancy areas which this development proposes. Since the maximum size of any tenancy is well under 1,000sq.m, 165sq.m in fact, and tenants will have different delivery and dispatching companies due to there wide and various business types, the maximum size of vehicle ever likely to service the tenancies would only be an MRV. Nevertheless a LRV of 12.5m length was considered and swept path analysis completed which is shown on drawings CE780062-1 and CE780062-2 (refer Appendix A). Council Condition — 8.2 “Demonstrate how it is intended to safely load and unload ail trucks and commercial vehicles, as there is concerned that these activities occurring in a common area could others users of the site at risk. In this regard, it may be necessary to provide additional bays to adequately serve the site.” Response One loading bay 7.5m wide is located in approximately half way along the eastern circulation aisle for safe unloading and loading. The larger tenancies which are expected large delivers and/or more frequent deliveries have roller door bays to allow delivery vehicles to drive into their tenancy area for safe unloading and loading. The remaining tenancies are smaller companies which typically only have deliveries once a week by a light van or small commercial vehicle. Drawings CE780062-1 and CE780062-2 (refer Appendix A) show the swept path of a LRV and RCV for refuse collection. Council Condition - 9 “Demonstrate that adequate sight lines are available to all proposed pathways, with consideration given to cyclists who will be travelling at higher speeds than pedestrians and therefore will require greater sight distances. In this regard the positioning and alignment of the pathway between Units 10 & 11(and linking to the Gateway Drive cul-de-sac) is considered dangerous in a number of different ways and will need to be reviewed.” Response It should be noted firstly that this bicycle path was never proposed by the client but requested to be incorporated into the development by the Council despite a proposed bicycle path on the western boundary of the site. The riding of any bicycle through the proposed car parking area, like any other car park, is considered inappropriate and unsafe. As such, “cyclists to dismount" signs will be installed at key locations as shown on drawing CE780062-2 (refer Appendix A). G:\780062 Noosaville Industrial\780062 DRAFT CEO RFI ON_20080220.doc
Page 43
' > Sardne Council Condition — 21 “Please provide a detailed Traffic Report assessing the impacts of the proposed development and making recommendations as to the level of upgrading works that may be necessary to the road network to cater for the development. Traffic generation rates should be based on a worst-case scenario for the actual uses proposed (including the Café and Outdoor Dining Area particularly if that is what is going to be ultimately proposed by the applicant). Response As per response to condition 2, the development is expected to generate a total of 46 vehicles per hour during the road network peaks. This is considered to be somewhat conservative, as it is likely that trips to the café use will be made in conjunction with a trip to the industrial use of the development plus the high levels of active transport available at the site will further reduce the sites traffic generation. Therefore, the traffic generated in the AM and PM peak hours would have limited impact on the external road network and thus not require any upgrading of external road networks, so a detailed traffic report would not be necessary in this situation. G:\780062 Noosaville Industrial\780062 DRAFT CEO RF! DN_20080220.doc
Page 44
Appendix A Drawings CE780062-1 and CE780062-2
Page 45
en Sue 1g Sees we -0up.4 1:
AaNGAS 4svo> d109 anvasiag =
uasig jeaddz
S1IVL30 NOISN3WIG
SANIT? SNOIS
av wr
IWINLSNGNI
N LONIOSYd
ATIAVSOON HOYVLYVNS
SS
12.66 zZesov
SIVLAG ONIMYVWANIT 8 SNOIS
66 869r1
of
:
: ;
} || U f
ae 3
= Ge s+ |
M oa
4 BE 9E i
oH
|
. a .
&
<
>
&
at
<=
>
-
oO
=
¢
| ,
Lh
|
|
ee
were
4 gavitan | auvvzzar : : a
wd 5 (avo woos ‘HONYL wWoO9) Ne reas wewczan | sncrzzan
EB — BONVYVSIO 3TOIH3A ae
m ; FIOIH3A Y 25-65) NOIS LNNOWSI'SisMoK-LOSNa
Af) } Hivd 31130 : = a —YVO YVO ¥95-69) NOIS INNOWSIC SiSIM9AD 19343
4 ath AGO FIOIH3A al ¥ mast af
ONGOS1 =
Page 46
0S'6z : ajbuy Bul1aats
009: AWIY 4907 0} 4907
os‘z : 4904)
osz : UPIM
suajyaw AOY
02'S 0971
©
©
00'0L
og 9c : ajbuy 6u994s
QO'9 > BWIL 4907 OF 4207
os : 4OO4L
os’? : UYPIM
suajew AN]
seg Oz'%
pa fOxXO
[I I
Se
ag ‘Zt
NOIS ¥8G-69 MIN 10583
LNNOWSIG
SLSITDAD
a
>
4
m
=
>
x<
9
a
<
m
wh
Q
vA
\
\
\
€
2
a
x
Q
A
g\
\
Coie Wom OY onoae) ee vB os: 3w9s ww Bow: awvos Tamar, “Genelia en §
We Px Siiv13d NOIS coms) “Seemann |omme co FO wumecor weesos ampod 9
gq S| tionmtoninano oa a ee siege magia won
asq] Jou PS AONVLSIC LHOIS awralsnant peveug| — uvera| —_ubsaq (¥4 NOILONYLSNOO YOs LON uasiO yeddyz . }
Z-79008249 N LONIDARd aTIAWSOON Houvaws WU INIdd AYVNINI Tad Sin ae ougeamemas| § oupsez CTS |
‘on Bune ant Sume-d eri Pakud Ag paxdcns vonewoju) aseg uvoN) _—- —— 4a aed voadiaseg | anssy a
SATOIHAA NOISAG 4O S1VL3a0 Re
\
\
ose¢ : ajbuy Buaa}s \
009 : aU, 4907 0} 4907 \ q3sds
“hs 4301
rel: capt \ NoIsad udyor HOS
suajau wy) | WO9 SONV.LSIG LHOIS
, NOILOASYSALNI 34vS
\
\
\
\
\
\ Cc
\
\
« @ ee
1 uc J Pp! Saige wees —
awororr | aNNvZzan FO vere%09 ig ae,
zy i
FE
«| «|?
EER EE REECE
WYP
VG ayer sem avo yen Kem UG
_ SHV € WNWINIW ude
eS JONVLSIO ONINAND A |
x en +]
w | so “bh is y @ e
33v9 sore 0) ued wonan09 Ui é EI
ype
st * ev | a +h tt a $s ’
3 | GH 5a
suk 909 _wlworelon
vy oe
z . ——_—— Syakeano™
yea hem vO Wg’ pz ouyen em a8Q
SIV GEESE EEE EEE EEE EEE pe oo NN REE
_ 304 { $69 $99 en 06'S
4 Sil sw O6E moose $09 sus
SNINVZZ34 SNINYZZAN
ARES aueres au 2b aw 1See so cE
vb €h a —}
C ob GE'OZT a G2°90T
SL WLeeiT OL
, cbrz- ewoove woo woot tt
ANINYZZ34 SNINYZZAN 3NiINYZZ4W
| rll
- __
SNOIS V8S-69 MAN LOAYA ahs
Page 47
-13- APPENDIX D NOISE AND LIGHT ASSESSMENT REPORT
Page 48
CIS Cardno Shaping the Future GATEWAY DRIVE, NOOSAVILLE Noise and Light Assessment Report 24 January 2008 Job No. 7800/62 Mintgrove Pty Ltd ——_—_—_—_—_———
Page 49
GATEWAY DRIVE, NOOSAVILLE < | > Cardno NOISE AND LIGHT ASSESSMENT REPORT Cardno (Qld) Pty Ltd ABN 57 051 074 992 5 Gardner Close Milton Q 4064 PO Box 388 Toowong Queensland 4066 Australia Telephone: 07 3369 9822 Facsimile: 07 3369 9722 Intemational: +61 7 3369 9822 [email protected] www.cardno.com.au Document Control Author Reviewer Version Date Name Initials Name Initials Final 24 January 2008 E. Young ; £ P. Jacobs ee} "© 2008 Cardno (Qld) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this document belongs to Cardno (Qid) Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person without the prior written consent of Cardno (Qld) Pty Ltd.” Mintgrove Pty Ltd Version 1 24 January 2008 IA7800-62\wp\Nolse and Light Assessment (1).doc Commercial in Confidence Page i
Page 50
GATEWAY DRIVE, NOOSAVILLE Sy
NOISE AND LIGHT ASSESSMENT REPORT CG Cardno
GATEWAY DRIVE, NOOSAVILLE
NOISE AND LIGHT ASSESSMENT REPORT
TABLE OF CONTENTS
1. INTRODUCTION...........ccccccssesssessceersetstenesssessevesonssccanscesesenvaseenesssnenensosnenseaseseeseesaneansaraenes 1
2. SITE DESCRIPTION .........:ccsccscsscsserssnsssentossescesessnaseuseensesseveessassaescensensoenensoneentansesereaneenseaes 2
2.1 Existing Site... cc ccc ene ccnscneeeeseceerecescetaseecsesaeeesseeaenessesneasesecsaecesasaeseecersaeeates
2.2 Proposed Development.
3. REQUIREMENTS OF INFORMATION REQUEST..........:csccsssssecestereeensenenteenteereseantees 3
3.1 Business Uses Code... ccccccescescecnesneevevecneserscssssecneseressessessesserssessaseaeensseneeaes 3
3.2 Noosa Shire Local Law No. 12.0.0... cnr ern sernecioeecnresinereetsasentecnres 3
3.3. Environmental Protection Regulation 1998 0.0... cece eeeereeereerereerneeerirecteeeee 3
4. DEVELOPMENT DESIGN AND MITIGATION .......cccccssssvsressserssenseensessensersersneenneenseseestens 4
4.1 NOISC@ oie cece cere reer er ee een enters ene enn REIS One SSeS centre tn etnenrneeneers 4
4.2 LIQHting.... eects ee eeec ene ceetesstenseessteseeseeneeseneersenmtienesesenneneenenresenennennense 4
5. -_ CONCLUSION .....ccscccserceseessecsseenssostceevesuneessessensenaueconreasensessenuseessersnssneseasauasaecoaseeseneneaeeanees 5
LIST OF FIGURES
Figure 1 Site Locality Plan
Figure 2 Site Layout Plan
Mintgrove Pty Ltd Version 1 24 January 2008
IA7800-62\wp\Notse and Light Assessment {1}.doc Commercial in Confidence Page ii
Page 51
GATEWAY DRIVE, NOOSAVILLE < j ) Cardno
NOISE AND LIGHT ASSESSMENT REPORT
1.
INTRODUCTION
Mintgrove Pty Ltd proposes to develop a 44 lot light-industrial precinct at 64 Gateway Drive,
Noosaville, also known as Lot 13 on SP170295, within the Noosa Shire Council (‘Council’).
A development application (Applicant 07/0738) was made to Council in June 2007 for a
development permit that would allow for an Industrial Business Type 1 (Warehouse) and
Type 2 (Production, alternation, repackaging and repairing) to be developed at this site. A
subsequent Information Request (reference number 2007/738) was issued by Council on 4
July 2007 requesting further information to be provided to assist in the assessment of the
application.
The Information Request required a noise and lighting assessment report to be prepared in
accordance with Council’s Business Uses Code (Outcomes O3 and O11) with respect to
residential areas to the west of the site and any noise attenuation measures that may be
necessary.
The purpose of this report is to address the Council's Information Request regarding noise
and light issues associated with the new development layout against Council’s Planning
Scheme and relevant local and state government legislative and policy objectives.
Furthermore, this report provides updated information as to any potential impacts on the
surrounding sensitive receivers and recommends appropriate mitigation measures to
ensure environmental amenity is maintained.
Mintgrove Pty Ltd Version 1 24 January 2008
{:\7800-62\wp\Noise and Light Assessment (1).¢oc Commercial in Confidence Page 1
Page 52
GATEWAY DRIVE, NOOSAVILLE < | ) Cardno NOISE AND LIGHT ASSESSMENT REPORT 2. SITE DESCRIPTION 2.1 Existing Site The development site is located at 64 Gateway Drive, Noosaville, and also known as Lot 13 on SP170295. The site to be developed has an area of 1.24 hectares. The site is located within the Noosa Shire Council. Figure 1 illustrates the location of the proposed development site. The existing site is surrounded by dense vegetation to the north, east, and south. A residential area is situated to the west, and a light industrial area is situated south-east to the site. 2.2 Proposed Development The proposed development involves a 44-lot commercial and industrial precinct, including an outdoor dining and cafe area with a landscaped buffer. A layout of the proposed site is provided in Figure 2. The buildings will be 8 metres in height with mezzanine level, and will surround the central car parking area. An approximately 10-metre landscape buffer area will surround the site’s buildings to ensure environmental amenity is maintained. Mintgrove Pty Ltd Version 1 24 January 2008 I\7800-G2\wp\Noise and Light Assessment (1).doc Commercial in Confidence Page 2
Page 53
GATEWAY DRIVE, NOOSAVILLE ) a > rea NOISE AND LIGHT ASSESSMENT REPORT Gq a mo 3. REQUIREMENTS OF INFORMATION REQUEST In regards to potential light and noise issues, this report will address point 4 of the Information Request, as follows. "Please provide a noise and lighting assessment report prepared by a suitably qualified person to address the acoustic and lighting amenity issues raised in the Business Uses Code (specifically Outcomes O3 and O11) with respect to the residential areas to the west of the site and any noise attenuation measures that may be necessary. The acoustic report shall assess all potential sources and demonstrate how the development will not cause — - Excessive noise under Council's Local Law No. 12 — Control of Nuisances. - Unlawful environmental nuisance under the Environmental Protection Regulation 1998. It is noted that the existing development approval for the site (23074DA) involved a report of this nature, prepared by Cardno MBK (Qld) Pty Ltd, and this may be revised for the new proposal.” A senior environmental consultant has reviewed the light and noise aspects of the development, the information provided and the relevant codes as specified in the information request. It was concluded that there should be no substantial impact from noise or light from this development if developed in accordance with the resources outlined in the following sections. 3.1 Business Uses Code As specified in the Information Request, Specific Outcome O3 of Council's Planning Scheme requires development to be designed and sited so as to avoid noise emissions that unreasonably diminish the amenity of the area or of surrounding uses. Furthermore, Specific Outcome O11 requires the lighting of a development to be of appropriate intensities to maximise safety. 3.2 Noosa Shire Local Law No. 12 Council's Local Law No. 12 aims to protect the environment and public health, safety and convenience, by eliminating or reducing nuisances resulting from excessive noise and light spillage. The document specifies requirements regarding the mitigation of noise emissions. 3.3 Environmental Protection Regulation 1998 The Environmental Protection Regulation 1998 seeks to prevent interference of unlawful environmental nuisance from noise not permitted under the Environmental Protection (Noise) Policy 1997 (EPP Noise). The EPP Noise seeks to enhance the wellbeing of the community and the wellbeing of an individual, including the individual's opportunity to have sleep, relaxation and conversation without unreasonable interference from intrusive noise. Mintgrove Pty Ltd Version 1 24 January 2008 (:\7800-62\wpINoise and Light Assessment (1).doc Commercial in Confidence Page 3
Page 54
GATEWAY DRIVE, NOOSAVILLE NOISE AND LIGHT ASSESSMENT REPORT qG Cardno 4. DEVELOPMENT DESIGN AND MITIGATION 4.1 Noise Operator activities of the site will be light-industry based, involving negligible external noise emissions. The development has been designed so any external noise generating activities will be located centrally to the site and away from the residential area adjacent to the western boundary. The central location of noise generating activities will allow shielding of noise by the surrounding buildings. Additionally, the proposed landscaped buffer surrounding the development, as shown on Figure 2, will provide a further buffer to allow for acoustic amenity to the surrounding areas to be maintained. Any external noise-generating equipment (i.e. air-conditioning units) installed on the external facade of buildings, however, should be strategicaily positioned away from the western boundary. If the positioning of equipment away from the western boundary is not feasible and that equipment has a Sound Power Level (‘SPL’) of greater than 76 dB(A), an appropriate acoustic enclosure should be utilised. 4.2 Lighting Potential light influence from the proposed development is expected to include: e external lighting including security lighting, lighting for general safety purposes, and balcony lighting; and e vehicle headlights in the car park area. With consideration to potential amenity issues, lighting for the development will be designed in accordance to the requirements of the Council's Planning Scheme. Lighting will be provided in appropriate intensities so as to maximise safety and will be designed in accordance with AS17158 - Public Lighting Code (AS1158). External lighting will be designed with a gradual intensity so as to provide a high level of lighting at building entrances and the centre area of the site, and a lower lighting intensity at site boundaries. Lighting will be directed toward the development and away from neighbouring properties, and will be vandal resistant in any publicly-accessible areas. The 8-meter height of the proposed buildings is likely to shield any lighting issues to sensitive receivers to the west of the site. Any lighting on the external western-facing facade will be designed so as to minimise impact on neighbouring dwellings. Mintgrove Pty Ltd Version 1 24 January 2008 4:\7800-62\wo\Noise and Light Assessment (1).d0c Commercial in Confidence Page 4
Page 55
GATEWAY DRIVE, NOOSAVILLE ) NOISE AND LIGHT ASSESSMENT REPORT qc Cardno 5. CONCLUSION Mintgrove Pty Ltd proposes to develop a 44 lot light-industrial precinct at 64 Gateway Drive, Noosaville, also known as Lot 13 on SP170295, within the Noosa Shire Council (‘Council’). A development application (Applicant 07/0738) was made to Council in June 2007 for a development permit that would allow for an industrial Business Type 1 (Warehouse) and Type 2 (Production, alternation, repackaging and repairing) to be developed at this site. This report has been prepared to address an Information Request from Council regarding noise and light issues associated with the proposed development layout. A senior environmental consultant has reviewed the light and noise aspects of the development, the information provided and the relevant codes as specified in the information request. It was concluded that there should be no substantial impact from noise or light from this development as the site layout allows for shielding of noise to surrounding sensitive receivers by buildings, where noise-generating activities have been minimised. Further, it the development shall be designed in accordance with AS1158, minimising light annoyance to neighbouring properties. Mintgrove Pty Ltd Version 1 24 January 2008 4:\7800-62\wpiNoise and Light Assessment (1).doc Commercial in Confidence Page 5
Page 56
GATEWAY DRIVE, NOOSAVILLE < Cardno NOISE AND LIGHT ASSESSMENT REPORT FIGURES Figure 1 Site Locality Plan Figure 2 Site Layout Plan Mintgrove Pty Ltd Version 1 24 January 2008 1A7800-62twplNoise and Light Assessment (1).doc Commercial in Confidence
Page 57
GATEWAY DRIVE, NOOSAVILLE NOISE AND LIGHT ASSESSMENT REPORT Scale 1:20,000 (A4) Map reproduced with permission of UBD. Copyright Universal Publishers Pry Lid DG 01/06 Rev: Orig. Date: 12 November 2007 Peace UT aHL@-eroEt en RA :Waetern Dietrkts LOA SITE mete «Sutter indie INOT TO SCALE APAINNAM B sOUD CONT ay pink Dut Tite . Contra pleats MEW + RCE ANPTON . J OASIOME al wo amas eM vey BAIAANE sODONDANE DH FIGURE 1 SITE LOCALITY PLAN ACAD\Naise and Mintgrove Pty Ltd AD FILE 1\7800 Project No.: 7800/62
Page 58
eee maa Sue See 1002 8awaAON Zi @IEQ GUC ‘Aa NW1d LNOAV1 ALIS sepirogees [] = @ 3YnNDdIi4 aJB9S OL ION aNn3a931 ame owe ceere mewmeree one [=o newenm some ne oe a cesses emegeeeecce--! ge eels ge"! wee tee ne ae aeons me oe gf MRR PTAA Reg BR ae a pune een un | a : 1 Ee a Frere TIL Se ye ee eae =n amps Fal i PUES TS 2 : 3 1WOd3Y IN3NSS3SSV LHOM ONv 3SION oupwea € STAYSOON IAC AWACILYD
Page 59
-14- APPENDIX E SEWAGE & STORMWATER DESIGN NOTE
Page 60
www.callaghanandtoth.com.au ABN No. 57690359242 6/41 Sunshine Beach Roa Noosa Junction P.O, Box 2305 Noosa Heads 4567 0754749081 Fax 0734749041 E-mail [email protected] Callaghan & Toth Civil, Environmental & Hydraulic Engineers 12" December 2007 . File No: 06105 The Chief Executive Officer Noosa Council PO Box 141 Tewantin 4565 Attention: Denis Wallace Dear Sir, INFORMATION REQUEST DATED 4™ JUNE 2007 FOR APPLICATION 07/0138 AT 64 GATEWAY DRIVE NOOSAVILLE On behalf of Mintgrove Pty Ltd, below we offer our repose to items 11, 12, 13, 14, 15, 16, 17, 18, 19 & 20 of the above information request. 11. The enclosed plan 06105-1A shows finalised floor levels of the buildings and carpark. The plan also shows one east west section and one north south section which reflect the finish levels in relation to the natural surface. 12. Plan 06105-1A also shows the extents of retaining walls and cut & fill batters. The volume of earthworks is likely to be in the order of 1,500m° cut and 5,000m* fill. 13. Plan 06105-1A has notes which list the proposed height of retaining walls. 14. Plan 06105-2 has the main sanitary drainage lines shown with invert levels and surface levels which indicate that the site can connect by gravity to Council's sewers. 15. Plan 06105-2 shows access to sewer in the south east corner and the North West corner. 16. Plan 06105-1A shows the proposed location of the electrical substation and the location of the fire hydrant booster boxes. 17. Previous indicative river flood free floor height issued by Noosa Council in an earlier approval by 23074DA (30) was RL2.8 as all floor levels shown on our plan 06105-1 are above RL3.60 we certify that the floor levels for each industrial unit as shown on plan 06105-1 will be above the estimated 1 in 100 year average recurrence interval design storm for a Q100 river flood. \\Troy\jobs\Office Admin - Jobs\CT\06105 64 gateway drive\Info Request Response.doc
Page 61
18. 19. 20. Our plan 06105-1A shows finish levels for floors and carpark. These levels have been designed to provide an overland flow path for the Q100 overland flow from the end of the cul-de-sac which will pass through the carpark and exit at the eastern end with Lake Doonella. The overland capacity of the carpark with a 1% longitudinal grade and 3% cross fall is 1.48m*/s at 1.5m/s. This is in excess of the calculated Q100 flow of 1.29m*/s for both external catchments as shown on TOD Noosa catchment plans 98953-16 & 17 and calculation table 98953-20. The Callaghan & Toth Stormwater Quality Management Plan 0416 sets out a detention basin/Bioretention system of basins and rainwater tanks which will reduce runoff from the internal site to predevelopment levels for all storm events up to a Q100 event. The report also indicates that water quality objectives can be met. The extemal catchment detention system suitability has not been investigated as it is outside the scope of this development. The proposed outlet to the bioretention basins and rainwater tanks will be dispersed over the ground via a weir which will ensure the flow depth is only 100mm deep by 5m wide approximately for a Q10 storm. This will ensure that erosion is kept to a minimum. The outlet slope from the bioretention basin down to the river flood plane will be protected from erosion by river stones and native grasses. The Callaghan & Toth Stormwater Quality Management Plan 0416 Fig 1.2 has the preliminary sizing of the various devices. These have been sized to perform to the standard listed in 19 above. The proposed levels for the devices are shown on the enclosed plan 06105-1. Yours faithfully, Callaghan & Toth Vea AD Toth BE Environmental RPEQ MIEAust CPEng NPER (Env) (civil) Principal \\Troy\jobs\Office Admin ~ Jobs\CT\O6105 64 gateway drive\Info Request Response.doc
Page 62
APPROX. 1m
HIGH BLOCK
O.4m HIGH
RETAINING WALL ee | a RETAINING. WALL
t
HON A-A
DATUM RL 0.00
APPROX. 1.2m 1.4m HIGH 1.2m HIGH
HIGH BLOCK RETAINING WALL APPROX. Im ETAINING WALL
HIGH BLOCK
sere b= Be
TON B-B ___ sero =e
DATUM RL 0.00 DATUM RE 0.00
~
= Bo ® Wie OL. 1 Shon Bites
ToS |_| ® PDs |S. ~
ne | h.. NL S8S
& Serna § ce FL 4.45 | | SS IN FL_3.75 fe} A
Y 500 W735 SBS OP
f é SB) a (Mes ‘ _—. ; xr oot — 8 (M) &
CoED* ( (st $2
a
& EID 5, 1%;
ip —
sey
. pf CAS] oe . are>
eee
4
es
se 682m GOD SS>* >
eo B
8 FL 5.25] FL 4.75
FU 5.25
SN
cs
PIA T |
a
El
2Am2 x 0.3m DEEP
14m2_x 0.3m DEEP = Sw —— UNTREATED STORMWATER
37m2 x 0.63m DEEP [Ss] POSSIBLE GPT / SED/OIL 1 + —— TREATED STORMWATER LINE
0100 FLOW PATH
@@RD PROPOSED FINISH PAVEMENT LEVEL
PROPOSED FINISH PAVEMENT GRADES
GATEWAY DRIVE
(FEES
[COMPUTER DIRECTORY
IC:\KEAYS\ 48S \¢ moe ——S—sd
|For Approval _|
Sheet 1 of 1 sheets
drowing number
06105-1,
io
Callaghan & Toth
Civil, Environmental &
Hydraulic Engineers
| 6/41 Sunshine Beach Rood
P.0. Box 2305
1 NOOSA HEADS 4567
Ph: 54749081 Fox: 54749041
www.callaghanandtoth.com.au
LOCALITY : NOOSAVILLE
Page 63
'
\
{— 200Z AON PIC yop ~*~ ( \ ¢ Davoed SNOSEME 100 3 5 c ~\
zs mos Ss ems are avs SRST TTIMYSOON + ALTVOOT TTIAYSOON
ND"wos"YOYpUoLDYbO}}OI" nas
c—-SOT90 ee TYONNOD 3YIHS YSOON INNO AVNGIYD +79 {POB¥L¥S 2X04 (BDBHZ¥S “kd
“quny Bure = ut 6 9 f 0 HOMWA : AINNOD JV JNdOT3AQd "WRULSNIN Oe
sways Z 40 2 yaUS ae ap Torsnat = TWOs J vga 40 HSRivd pefoud Pooy ys0eg sulusuns 19/9 4
Teaoiddy 10} SON ee Lee) |p namie ounernca |
f . By ‘
SSE \ J bie 107 + KG ee 2F [eaWUOMAUA a
STFO\D\SEONSADNVD| cv wnyop [Cart psa 0 ue
22019390 YANN t ! 5 YJoL 2 ueysel[e)
[FI
HINOS HIBON saqved asod0d = <tz
SMS 0S) HUM TBAT] LNGNGAY HSIN (OUd CED w
HW NON TINg JOVNIVED ANVUNVS ONILS!
BOVNIVEC AUVUNYS AGN
SHOHNYW U3N3S
GNI9F1
HW
ONUSIXI O1 80H
OG) MON NI LAD