Council archive · source document
07/0738 - Response to Information Request [As Published] · 132007.738
2 CJ Cardno Eppell Olsen Table 1 Development Car Parking Requirements for Type 1 . ; Car Parking Land Use Yield Car Parking Rate Requirement Type 1 Industrial Business 4,532sq.m 1 space/50sq.m 91 spaces Type 1 Entertainment and 100sq.m 1 space/10sq.m 10 spaces Dining Businesses TOTAL 4,632sq.m 101 spaces Table 2 Development Car Parking Requirements for Type 1 & 2 . Car Parking Land Use Yield Car Parking Rate Requirement Type 1 Industrial Business 2,266sq.m 1 space/50sq.m 46 spaces Type 2 Industrial Business 2,266sq.m 41 space/50sq.m for first 500sq.m and 28 spaces 1 space/100sq.m thereafter Type 1 Entertainment and 100sq.m 1 space/10sq.m 10 spaces Dining Businesses TOTAL 4,632sq.m 84 spaces A previous development by the applicant along Gateway Drive shows that it is extremely unlikely that 100% of the tenancies would be used for type 1 industrial being warehouses. Therefore, using the results shown in Table 2 of a car parking demand of 84 spaces, the spaces provided by the proposed development is within the Noosa Plan and considered adequate. Furthermore, the proposed development includes 2 racks for 25 bicycles totally 50 spaces plus each tenant will have showering facilities which allows for high levels of active transport, reducing the car parking demand. The Noosa Plan only requires 1 bicycle parking space per 100m2 for Industrial Business type 2, equating to 45 spaces. There are no bicycle parking requirements for type 1 entertainment and dining businesses. In addition, it is likely that the majority of customers to the café component of the development are likely to come from the industrial buildings. Thus, the provision of ten spaces is considered to be more than reasonable for the café component of the development. The expected peak traffic generation for the site has been determined based upon traffic generation rates published in TAG. The rates given for the land uses within the development are as follows: . Light Industrial: 0.9 vehicles/100sq.m GFA; . Restaurant: 5 vehicles/100sq.m GFA. Based upon these rates the expected traffic generation is as shown in Table 3. Table 3 Expected Peak Hour Traffic Generation . Peak Traffic Generation Expected Peak Land Use Yield Rate Generation Industrial Business 4,532sq.m 0.9 vehicles/100sq.m GFA 41 vehicles Café 100sqg.m 5 vehicles/100sq.m GFA 5 vehicles TOTAL 4,843sq.m 46 vehicles AM Peak - 70% in/30% Out 33 Cars In/ 13 Cars Out PM Peak — 30% in/70% Out 13 Cars In/ 33 Cars Out The development is expected to generate a total of 46 vehicles per hour during the road network peaks. This is considered to be somewhat conservative, as it is likely that trips to the café use will be made in conjunction with a trip to the industrial use of the development plus the high levels of active transport available at the site will further reduce the sites traffic generation. G:\780062 Noosaville tndustrial\780062 DRAFT CEO RFI DN_20080220.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.