Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

07/0738 - Response to Information Request [As Published] · 132007.738

of 63

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

2 CJ Cardno

 

 

 

 

 

 

 

 

 

 

 

Eppell Olsen
Table 1 Development Car Parking Requirements for Type 1
. ; Car Parking
Land Use Yield Car Parking Rate Requirement
Type 1 Industrial Business 4,532sq.m 1 space/50sq.m 91 spaces
Type 1 Entertainment and 100sq.m 1 space/10sq.m 10 spaces
Dining Businesses
TOTAL 4,632sq.m 101 spaces
Table 2 Development Car Parking Requirements for Type 1 & 2
. Car Parking
Land Use Yield Car Parking Rate Requirement
Type 1 Industrial Business 2,266sq.m 1 space/50sq.m 46 spaces
Type 2 Industrial Business 2,266sq.m 41 space/50sq.m for first 500sq.m and 28 spaces
1 space/100sq.m thereafter
Type 1 Entertainment and 100sq.m 1 space/10sq.m 10 spaces
Dining Businesses
TOTAL 4,632sq.m 84 spaces

 

 

 

 

 

A previous development by the applicant along Gateway Drive shows that it is extremely unlikely that
100% of the tenancies would be used for type 1 industrial being warehouses. Therefore, using the
results shown in Table 2 of a car parking demand of 84 spaces, the spaces provided by the proposed
development is within the Noosa Plan and considered adequate.

Furthermore, the proposed development includes 2 racks for 25 bicycles totally 50 spaces plus each
tenant will have showering facilities which allows for high levels of active transport, reducing the car
parking demand. The Noosa Plan only requires 1 bicycle parking space per 100m2 for Industrial
Business type 2, equating to 45 spaces. There are no bicycle parking requirements for type 1
entertainment and dining businesses.

In addition, it is likely that the majority of customers to the café component of the development are likely
to come from the industrial buildings. Thus, the provision of ten spaces is considered to be more than
reasonable for the café component of the development.

The expected peak traffic generation for the site has been determined based upon traffic generation
rates published in TAG. The rates given for the land uses within the development are as follows:

. Light Industrial: 0.9 vehicles/100sq.m GFA;
. Restaurant: 5 vehicles/100sq.m GFA.

Based upon these rates the expected traffic generation is as shown in Table 3.

 

 

 

 

 

 

 

 

 

Table 3 Expected Peak Hour Traffic Generation
. Peak Traffic Generation Expected Peak
Land Use Yield Rate Generation
Industrial Business 4,532sq.m 0.9 vehicles/100sq.m GFA 41 vehicles
Café 100sqg.m 5 vehicles/100sq.m GFA 5 vehicles
TOTAL 4,843sq.m 46 vehicles
AM Peak - 70% in/30% Out 33 Cars In/
13 Cars Out
PM Peak — 30% in/70% Out 13 Cars In/
33 Cars Out

 

 

 

The development is expected to generate a total of 46 vehicles per hour during the road network peaks.
This is considered to be somewhat conservative, as it is likely that trips to the café use will be made in
conjunction with a trip to the industrial use of the development plus the high levels of active transport
available at the site will further reduce the sites traffic generation.

G:\780062 Noosaville tndustrial\780062 DRAFT CEO RFI DN_20080220.doc

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0738 - Response to Information Request [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.