07/0738 - Response to Information Request [As Published] · 132007.738
-6-
Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F.
| Demonstrate that each industrial unit will be capable of draining all effluent waste by gravity means
(Issue 14 ~ a ]
‘to Council’s sewerage reticulation network (i.e. without the need for pumps)...
Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F.
Issue 15
\ Demonstrate how internal access for maintenance purposes (by the owner and/or Council) will be
given to the southeast corner of the site where at least part of the development will need to be
connected to sewer. In this regard the proposal does not provide access to this part of the site due
to existing developments, likely future developments, and due to extensive vegetation in this area.
'To this end it is noted that the previous approval over the site (23704DA) had proposed a carparking |
! area in this part of the site and as such access would be more readily available by the owner and/or -
, Council if needed.
- : - f
‘In this regard, an access may need to be provided between Units 29 & 30 or alternatively have Unit —
29 setback sufficiently from the eastern boundary to allow access past the building and to the south
teast corner of the site.
Comment: The proposal plan has been amended to provide suitable access provision to the sewer
easement in the southeast corner of the site.
+ a -- -= eee we - ose ee 5
“Issue 16 ~~
{Illustrate on the proposal plans the location of the electrical substation and the location of the fire ;
;hydrant booster boxes that are likely to be required in order to serve the proposed development, |
‘with consideration given to how maintenance and/or emergency vehicle access to these services will
{be obtained.
Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F.
“Issue 17
Provide certification from a Registered Professionat Engineer Queensland demonstrating that each
- industrial unit will be above the estimated 1 in 100 year Average Recurrence Interval design storm ; ‘
(Q100). In this regard it is likely that the rear of the site will be subject to flooding from the Noosa i
River and Lake Doonella. 0 8 ee
Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F.
‘Issue 18”
All existing drainage flow paths that enter the site, whether overland or within a pipe, shall be {
‘accepted and safely carried through the site. In this regard Gateway Drive will act as an overland
flow path in a major storm event and due to the grade of this road stormwater runoff will be
directed into and across the subject site towards Lake Doonella at the rear. This overland flow will
,therefore need to be taken into consideration with the design of the industrial development and an
" appropriately sized flow path provided through the site to safely carry this volume of water past the |
Industrial Units.
As such, please arrange a Registered Professional Engineer Queensland to design the overland flow
path through, the site, with consideration given tothe actual, drainage catchment and the. future.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.