Council archive · source document
07/0738 - Response to Information Request [As Published] · 132007.738
-7- ‘in runoff. This overland flow path will need to be shown on the proposal plans for Council to review and ascertain the level of, impact. Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F. “Issite 19 ~ Demonstrate how the site is proposed to be drained such that there is no impact to any of the adjacent land and no increase in run-off for storm events up to and including a 1 in 100 year Average Recurrence Interval design storm (Q100). Consideration will also need to be given to the I ikely contaminants that could be expected off an industrial site and to erosion caused by | concentrated flows that scour the natural landform. It is noted that the present proposal does not give an indication of the extent of scour that could occur nor the measures that will be necessary to j avoid the affects of scouring. Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F. ‘Issue 20 ‘On review of the Stormwater Quality Management & Assessment Report by Callaghan & Toth it is | : noted that a number of different devices are proposed to manage and treat stormwater runoff. In this regard please indicate on the Architectural plans these devices (i.e. once they have been ! correctly sized to cater for the Q100 flow), particularly when they are proposed to be located above ground (such as rainwater tanks), as Council will need to review the devices in context with the \ , Proposed buildings and carpark. As such the Architectural plans and elevations will need to ber ‘reviewed. Comment: Refer correspondence and plans prepared by Callaghan & Toth attached in Appendix F. It is not considered necessary for rainwater tanks to be shown on the architectural plans or elevations as The Noosa Plan includes rainwater tanks as part of landscaped area. Further, elevations of rainwater tanks are irrelevant to engineering assessment of the proposal. "Issue 21 Please provide a detailed Traffic Report assessing the impacts of the proposed development and _ making recommendations as to the level of upgrading works that may be necessary to the road network to cater for the development. Traffic generation rates should be based on a worst-case scenario for the actual Uses proposed (including the Café and Outdoor Dining Area particularly if | that is what is going to be ultimately proposed by, the applicant). ‘ Comment: The Design Note prepared by Cardno Eppell Olsen attached in Appendix C provides an adequate traffic assessment of the development and concludes that traffic generation would have limited impact on the external road network and thus not require upgrading of external road networks, and as such a detailed traffic report is not necessary in this situation. “Issue 22 ees 7] Please submit a copy of the Environmental Management Plan for the site, and incorporate the relevant aspects of the Acid Sulphate Soil Report, the Stormwater Quality Management al Assessment Report, the Ecological Assessment Report, the Traffic Report, and any other site-specific s _reports, ne a ane om ve ee ere Comment: An Environmental Management Plan is not required for the assessment of this code assessable material change of use and can be imposed as a condition of the development permit and submitted as part of a subsequent Operational Works application.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.