Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

07/0738 - Response to Information Request [As Published] · 132007.738

of 63

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

18.

19.

20.

Our plan 06105-1A shows finish levels for floors and carpark. These levels

have been designed to provide an overland flow path for the Q100 overland
flow from the end of the cul-de-sac which will pass through the carpark and
exit at the eastern end with Lake Doonella.

The overland capacity of the carpark with a 1% longitudinal grade and 3%
cross fall is 1.48m*/s at 1.5m/s. This is in excess of the calculated Q100 flow
of 1.29m*/s for both external catchments as shown on TOD Noosa catchment
plans 98953-16 & 17 and calculation table 98953-20.

The Callaghan & Toth Stormwater Quality Management Plan 0416 sets out a
detention basin/Bioretention system of basins and rainwater tanks which will
reduce runoff from the internal site to predevelopment levels for all storm
events up to a Q100 event. The report also indicates that water quality
objectives can be met. The extemal catchment detention system suitability
has not been investigated as it is outside the scope of this development.

The proposed outlet to the bioretention basins and rainwater tanks will be
dispersed over the ground via a weir which will ensure the flow depth is only
100mm deep by 5m wide approximately for a Q10 storm. This will ensure that
erosion is kept to a minimum. The outlet slope from the bioretention basin
down to the river flood plane will be protected from erosion by river stones and
native grasses.

The Callaghan & Toth Stormwater Quality Management Plan 0416 Fig 1.2 has
the preliminary sizing of the various devices. These have been sized to
perform to the standard listed in 19 above. The proposed levels for the
devices are shown on the enclosed plan 06105-1.

Yours faithfully,
Callaghan & Toth

Vea

AD Toth BE Environmental RPEQ MIEAust CPEng NPER (Env) (civil)

Principal

\\Troy\jobs\Office Admin ~ Jobs\CT\O6105 64 gateway drive\Info Request Response.doc

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0738 - Response to Information Request [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.