Council archive · source document
07/0738 - Response to Information Request [As Published] · 132007.738
"Issue 23 . — It is noted that some of the outcomes proposed and recommended by the various reports submitted ;with the proposal are in conflict with one another. In this regard each individual consultant should 'be given copies of the other consultants reports to review and to ensure that they each have a workable and consistent approach to developing the site. The applicant should then review the .various reports to ensure consistency prior.to resubmitting the amended reports to Council. Comment: The reports submitted with the application were background documents to demonstrate that no specific site issues exist. Any specific site development requirements can be addressed by conditions of approval and integrated into a subsequent Environmental Management Plan. ENVIRONMENTAL SERVICES / WORKS roe eee oe eee one ee ——a ee Issue 24 | It is requested that further discussions are held with Council to confirm an appropriate layout for the ‘bicycle path any fire fighting access path. necessary to protect the development. Appropriate , , connectivity is also required with other development currently, being assessed in the area. __ Comment: The bicycle path has been located as discussed at the pre-lodgement meeting. As indicated in our response to issue 5 above, The Noosa Plan does not include the subject site within a bushfire hazard area nor does any boundary of the site adjoin an area designated as bushfire hazard area. As such a fire fighting access path is not necessary. ENVIRONMENTAL HEALTH ‘Sse 25 ™ 7 ° ee ‘Please submit a Waste Management Plan (Operational) in accordance with Planning Scheme Policy : | No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, for the day- | to-day operation of the development. i ! It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9: (explaining exactly how to predict waste quantities and design waste areas Is available from Council i ‘or online. The Plan shail include the following information: - « The types of waste that will be generated from the activities approved within the development. « €stimated volumes or tonnage of both recyclables and waste generated. e Methods to be used for dealing with garden waste. 1 ¢ Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling. ‘ e Description of procedures for getting all waste to the bins; the storage of bins and the f collection of bins by the contractor. 1 e A description of the design details of waste storage and recycling areas including size, location, elevation and floor plan, methods of bin washing and system to prevent storm water getting into sewer via the bin wash. e Adescription of types and volume of waste storage containers to be used. i e The waste and recycling storage area shall include the provision of containers for all waste and recycling materials including putresable matter, non-recycling waste, paper/ cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin washing facilities ' connected to sewer. ae eee ee eel
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.