Council archive · source document
Minor Change Existing Approval OPW19 0266 03 · OPW19/0266.03
Maintenance Bonds
61. The developer is responsible for the maintenance of all development works which are to
become Council assets (includes civil infrastructure, landscaping, open space areas, park
improvements) for a minimum period of 12 months or as otherwise advised by Council. This
period will commence from Council’s formal acceptance of the development “on
maintenance”.
62. The developer must submit a Maintenance Bond to Council to ensure the above works are
maintained during this period. The maintenance bond must be:
a. 5% of the agreed value of the development obligations; or
b. $1500, whichever is the greater amount.
5. REFERRAL AGENCIES
Not applicable.
6. REFERENCED DOCUMENTS
JOOO488 2 Fauna Management Plan prepared by 21/11/2019
North Coast Environmental Services
JOOO488 2 Environmental Management Plan prepared 21/11/2019
by North Coast Environmental Services
Bushfire Management PlanA3-FINAL 19/03/2019
280319
Emergency Response Plan -Essence of Undated
Peregian Beach Residential Units
Emergency Response Plan -Essence of Undated
Peregian Beach Hotel
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
General Advisory Notes
1. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
of the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
2. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
3. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
4. Development obligations refers to all conditions of approval relative to the development
permit. This includes, but is not limited to, Civil Works, Park improvements, landscaping,
provision of “As Constructed” information, test certificates, revegetation, sediment and
erosion control.
Page 14 of 18
Document Set ID: 22642068
Version: 2, Version Date: 31/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval OPW19 0266 03.pdfRelated documentApplication case desk ↗
About this file
- File size
- 245 KB (small file)
- File type
No other editions are linked here.