Minor Change Existing Approval OPW19 0266 03 · OPW19/0266.03

of 18

Text shows just the words. Original shows the document exactly as it was published.

                      f.      Any fencing has muted natural tones to blend with the natural environment.
                      g.      Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of
                              foreign matter including anthropogenic waste, rock, soil/sediment contamination and is
                              applied to all planting areas to ensure a minimum 100mm depth once settled.
                      h.      Turfed areas must be must be free of pest, diseases and weeds and level with adjoining
                              surfaces.
                      i.      Ensure all biobasin batters are adequately stabilised and densely planted.
                      Bushfire Management
               54.    A qualified person* must be engaged for the duration of the works to ensure:
                      a.      Works are carried out in accordance with the referenced Bushfire Management
                              PlanA3-FINAL 280319 Report, where required by these conditions.
                      b.      Bushfire Management PlanA3-FINAL 280319 must be certified and endorsed by
                              Council as meeting the requirements of the higher order approval by a suitably qualified
                              person*, prior to the issue of building approval.
                      c.      Emergency Response Plan -Essence of Peregian Beach Hotel must be certified and
                              endorsed by Council as meeting the requirements of the higher order approval by a
                              suitably qualified person*, prior to the issue of building approval.
                      d.      Emergency Response Plan -Essence of Peregian Beach Residential Units must be
                              certified and endorsed by Council as meeting the requirements of the higher order
                              approval by a suitably qualified person*, prior to the issue of building approval.
                              (* Refer to Advisory Note)
                      Environmental Management Plan
               55.    All works must be in accordance with the approved Environmental Management Plan.
               56.    Prior to issue of any building approval, certification from a qualified person* must be provided
                      to Council certifying compliance with the approved Environmental Management Plan.
                      (* Refer to Advisory Note)
                      Damage to Services and Assets
               57.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               FOLLOWING CONSTRUCTION / PRIOR TO COUNCIL SIGNING THE PLAN OF SURVEY
                      Certification
               58.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the Operational Works permit.
               59.    Certification that the existing retaining wall (Peregian Beach Hotel – on the eastern boundary
                      of the proposed development) has not been damaged nor structurally compromised by the
                      development works, must be provided by the supervising engineer.
               60.    A final inspection and approval of the works and completed reinstatement works by Council’s
                      Inspector is required. Please contact Council on 5329 6245 to arrange for the inspection.




                                                                                                       Page 13 of 18
Document Set ID: 22642068
Version: 2, Version Date: 31/10/2023

Used in these records

About this file

File size
245 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval OPW19 0266 03.pdf · 245 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.