12. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
Environment
13. Lot 900SP286680 (western park area) must:
a. Be protected with a 1.8m high temporary safety fence.
b. Have the fence installed prior to the prestart meeting and maintained for the entire
period of construction.
c. Have ‘Exclusion Zone’ (‘No Go’) signage fixed to the fence at 10m centres.
d. Have no construction material, equipment or personnel entering the park except to
undertake approved civil works.
e. Be protected from any damage.
*(Refer to Advisory Note)
14. Vegetation in Rufous Lane must:
a. Be protected with a 1.8m high temporary safety fence.
b. Have the fence installed prior to the prestart meeting and maintained for the entire
period of construction.
c. Have ‘Exclusion Zone’ (‘No Go’) signage fixed to the fence at 10m centres.
d. Have no construction material, equipment or personnel entering the park except to
undertake approved civil works.
e. Be protected from any damage.
DURING CONSTRUCTION
Engineering
15. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
who is independent of the Developer and Principal Contractor, and they must certify that all
works conform to the Operational Works permit. Where municipal works are involved, such
confirmation must be submitted for the respective hold points prior to any site inspection by
Council Officers.
16. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice;
b. The relevant conditions of the higher order Material Change of Use and
Reconfiguration of Lot approval viz. MCU16/0153 & REC16/0041 to which this
approval relates;
c. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines;
d. The latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site.
Roadworks
17. All pavement widening or construction of new pavement must join neatly to the existing
pavement so that there are no irregularities in line or level resulting at or adjacent to the join
for the length of the construction. Where necessary the existing pavement must be brought
to a satisfactory standard to allow for the above.
Page 6 of 18
Document Set ID: 22642068
Version: 2, Version Date: 31/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval OPW19 0266 03.pdfRelated documentApplication case desk ↗
About this file
- File size
- 245 KB (small file)
- File type
No other editions are linked here.