Council archive · source document
23176DA Change a Decision Notice [As Published] · 132003.220653.3
2003/220653
60. In particular, but without limitation, the EMP shall address the following issues in relation to the
construction and operational phases of the development:
legislative compliance;
vegetation protection;
fauna and fauna habitat protection;
aquatic ecosystem protection;
weed control;
pest control (particularly mosquitoes)
soil erosion and sediment control;
water quality protection;
groundwater protection;
air quality protection;
acid sulphate soil management;
storage and handling of hazardous substances;
noise and vibration management;
waste management;
cultural heritage management;
visual amenity protection;
bushfire control;
environmental emergencies;
community liaison.
61. The Environmental Management Plan shall incorporate the requirement for monthly
environmental compliance monitoring and annual audit reports to be submitted to Council for
the construction stages of the development. The format and content of these reports shall be
in hard copy and digital form, generally in accordance with the following:
61.1 Include tables of the monitoring results (digital form should be in Excel).
61.2 Include individual charts plotting the results for all parameters required in the
monitoring.
61.3 Include a brief written discussion of the results and recommend any necessary
actions.
62. The Applicant and all future owners of the site shall comply with the EMP and compliance with
the EMP shall be referenced in any community management statement for any group title
development over the site.
Page 10 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23176DA Change a Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 111 KB (small file)
- File type
No other editions are linked here.