access between structures and vegetated areas;
proposed building construction methods, materials and designs to reduce fire risks;
gutter treatments to avoid the collection of leaves and other fire-prone material;
location of fire hydrants and water points;
access for fire fighters and emergency workers;
fire suppression and evacuation procedures;
landscaping measures to reduce fire risk;
owners and operators training and responsibilities;
implementation procedures.
54. The Fire Management Plan shall meet the provisions of the Queensland Fire and Rescue
Authority Act 1990 and shall be endorsed by the Queensland Fire & Rescue Authority.
55. The Applicant shall provide a bushfire information kit to the body corporate manager. The
bushfire information kit shall be submitted to Council for approval as part of the Fire
Management Plan.
56. The Fire Management Plan shall incorporate all the relevant requirements of, and be
consistent with, all the other management plans required by this approval.
Environmental Management Plan
57. An Environmental Management Plan (EMP) shall be prepared and implemented to ensure that
the impact of the development on the environment is minimised and that the environmental
values of the site are protected and enhanced. The EMP is to:
57.1 Comply with AS14000.
57.2 Demonstrate a high level of environmental care and responsibility and be consistent with
best practice for developments of this type in similar environments.
57.3 Detail the developer’s environmental policy and the proposed environmental
management system for the site.
58. The Environmental Management Plan shall specify to the reasonable satisfaction of Council:
the performance targets, including those derived from the conditions and other requirements
arising from legislation and other approvals;
how the performance targets are to be achieved;
when the performance targets will be satisfied;
how performance will be monitored;
corrective actions and contingency measures to be undertaken;
reporting arrangements (including monthly reports to Council during construction);
auditing arrangements;
how the requirements are to be incorporated into construction and works contracts;
how the developers employees, contractors and the contractor’s employees will be
informed and trained with respect to the environmental protection requirements;
enforcement; and
penalties for non-compliance.
59. The EMP shall apply to all works and activities on the site and the adjacent road reserve.
Page 9 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23176DA Change a Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 111 KB (small file)
- File type
No other editions are linked here.