121.6 A minimum of one power point to each habitable room is placed up from the floor
(minimum 600mm) and out from the corner (minimum 500mm) to facilitate disabled
access.
122. The following shall be complied with the development of the site:
122.1 There is to be no uncontrolled discharge of water onto the slope;
122.2 Stripping of vegetation for construction purposes should be minimised. If vegetation is
destroyed it should be reinstated immediately after construction is completed;
122.3 The recommendations of all Golder Associates Pty Ltd reports on slope stability over
the Settlers Cove site are to be adhered to for the design, construction and
supervision of the development;
122.4 Additional load due to fill, construction equipment or stockpiled materials should not be
located on the dune slope;
122.5 Vibration monitoring shall be carried out by the geotechnical engineer and appropriate
action taken should vibration effects be a concern;
122.6 A condition survey is to be carried out of adjoining buildings, structures and services
prior to any demolition works or construction works taking place on site. If distress
already exists, a photographic survey shall be undertaken, the distress measured and
a plan to monitor changes to distress shall be implemented. A copy of this report is to
be submitted to Council within 5 business days of survey and prior to construction
work proceeding;
122.7 Deleted.
122.8 A RPEQ shall be engaged by the client to oversee any piling works.
122.9 The construction of the whole of the foundations is to be carried out in accordance
with the recommendations of the applicant’s consulting Geotechnical engineer,
including any on-site supervision required by these recommendations. Such works
shall only be carried out during dry weather conditions and if there is a risk of sand
movement occurring, all work shall be suspended until such steps, approved by the
applicant’s Geotechnical engineer have been taken to ensure that no further slippage
will result.
123. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum building height above natural and finished surface, required by the provisions of the
Planning Scheme.
Environmental Health
124. The developer shall comply with the Refuse Management Plan Reference Ryter Planning RCU
1005.
125. The developer must provide a suitably screened imperviously paved area large enough for all
refuse and recycling containers. A wash down area is required with a cold-water tap, hose and
drain outlet connected to sewer. The drain outlet is to be designed to prevent stormwater entry
to the sewerage system.
126. Street litter bins to a design approved by Council, shall be supplied and installed at the
developers expense at agreed locations.
127. Refuse chutes must be provided, in accordance with Council’s Policy for Refuse Chutes and
Accessories in Multi Storey Buildings.
Page 18 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23176DA Change a Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 111 KB (small file)
- File type
No other editions are linked here.