23176DA Change a Decision Notice [As Published] · 132003.220653.3
2003/220653
Construction Issues
113. A Construction Management Plan addressing all construction phases, including traffic
management, shall be prepared and submitted to Council for approval prior to obtaining a
Development Permit for Operational Works.
The report should aim to address every foreseeable problem that could occur during the
construction process and include recommendations on how these can be overcome or
minimised. The report shall be to the reasonable satisfaction of the Manager Land
Development.
Community Management Statement Requirements
114. The Applicant and all future owners of the site shall comply with the Environmental
Management Plan (EMP) for Settlers Cove Development 23118 DA and compliance with the
EMP shall be referenced in any community management statement over the site.
115. The Fire Management Plan is to be implemented by the Developer and future owners of the
site and is to be referenced in any community management statement.
116. The owners of the allotment shall not object to the construction of a boardwalk along Noosa
Inlet beside allotment 7 for the purpose of providing public access. Any Community
Management Statement established over any allotment shall also detail that the body
corporate will not object to the provision of a boardwalk as detailed above.
General
117. A Registered Professional Engineer of Queensland shall certify engineering drawings and
specifications for all engineering works, which shall be submitted in conjunction with an
application for a Development Permit for Operational Works.
118. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
119. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
120. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Building
121. To meet the needs of people across a range of abilities and ages and be adaptable for the
changing needs of people over time, at least 3 dwelling units shall include the following:
121.1 All doors to habitable rooms, kitchen, laundry and bathrooms are a minimum of
870mm wide; and
121.2 Hallways are a minimum of 1.2m wide; and
121.3 All entries into the dwelling unit and internal doorways, have no more than a 10mm
change in level, other than access to balconies where building code sill weatherseal is
to be maintained. A ramp can be retrofitted to provide access in accordance with
Australian Standards 1428.1 – 1993 Design for Access and Mobility Chapter 7
Doorways, Doors and Circulation Space at Doorways – Ramped Threshold; and
121.4 Has an accessible toilet and bathroom, complete with reinforced walls, that can be
reached along an accessible path; and
121.5 A sliding door or window, no higher than 600mm from the floor is provided in at least 1
bedroom to allow for a seated person to look out of and open and close the sliding
door or window; and
Page 17 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23176DA Change a Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 111 KB (small file)
- File type
No other editions are linked here.