MCU Decision Notice
MCU16/0043
c. provision of two (2) 45 litre trees within the setback to Opal Lane planted between
the parking area and the street boundary
d. dense landscaping provided between the boundary and the manoeuvring areas to
Opal Street and Opal Lane.
26. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained
and vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
ENVIRONMENTAL HEALTH CONDITIONS
Building Demolition/Removal/Relocation
27. Where the development involves the removal, relocation or demolition of a building, a
Waste Management Plan (construction and demolition) must be submitted and approved
by Council’s Environmental Health Officer prior to issue of a development permit for
operational works for demolition, removal or relocation of any building other than a shed.
Waste Management Plans (construction and demolition) must be submitted in accordance
with Planning Scheme Policy 11, Waste Management Plans.
Waste storage areas must provide for adequate separation of all reusable, recyclable and
waste materials. These must be located so that they are convenient and safe to use.
The Plan must contain the following information:
• The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.
• A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled – reused or disposed.
Table – Waste Management Table
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify contractor
materials volume(m³) *specify proposed *specify contractor and landfill site or
re-use or on-site and recycling outlet other disposal site
recycling methods
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management table
is to be completed by the demolition contractor.
Page 6 of 12