                                                                                    MCU16/0043


      Waste Storage
28.   The developer must provide waste storage and disposal facilities in accordance with
      Planning Scheme Policy 9, Waste Management, including an external imperviously paved
      area correctly sized for all refuse and recycling containers and suitably screened from
      public places and neighbouring properties.
29.   A bin wash area is required with a cold-water tap, hose and drain outlet connected to
      sewer, via a bucket trap. The drain outlet is to be designed to prevent storm water entry to
      the sewerage system which can be achieved by a bunded area, with a nib wall height of
      100mm maximum, enclosing a wash area of 700mm x 700mm minimum (max 0.7m²).
      Alternatively the waste area can be roofed, or any other appropriate design approved by
      Council.
      Noise
30.   Written certification is required from a suitably qualified person confirming that sound
      pressure levels from all mechanical plant and equipment comply with the following :
      a.       Air-conditioning and Refrigeration
           •    7am to 10pm: Maximum level allowable = background + 5dB(A)
           •    10pm to 7am: Maximum level allowable = background + 3dB(A)
      b.       Pumps
           •     7am to 7pm: Maximum level allowable = background + 5dB(A)
           •    7pm to 10pm: Maximum level allowable = background + 3dB(A)
           •    10pm to 7am: No audible noise.
      Assessment and certification is required immediately after installation of the equipment
      and prior to any occupation of the building. All equipment should be operating at the
      same time to test the overall noise level created, with the measurement location at either
      the residential boundary or outside the most exposed part of an affected building -
      whichever is the closest to the plant/equipment.
31.   The certification must be submitted to Council, which certifies that operational noise from
      any fixed plant and equipment complies with the requirements of this Decision Notice.

5.    REFERRAL AGENCIES

Not Applicable.

6.    ADVISORY NOTES

The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
      Aboriginal Cultural Heritage Act 2003
1.    There may be a requirement to establish a Cultural Heritage Management Plan and/or
      obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
      The ACH Act establishes a cultural heritage duty of care which provides that: “A person
      who carries out an activity must take all reasonable and practicable measures to ensure
      the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply




                                                                                 Page 7 of 12
Log in to download the original file

MCU Decision Notice.pdf · 314 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.