Proposed Subdivision
1 George Tewantin




    thus the long term maintenance requirements for Council would effectively be
    greater not less.

    Our concept design therefore proposes bio retention basins to treat the stormwater
    run-off from the site, however instead of one larger basin, two smaller basins have
    been proposed to minimise impacts on existing trees and to make use of the natural
    lay of the land. Following discussions with Council at the prelodgement meeting,
    water from the lots is conveyed to the bio retention basins via a conventional piped
    interlot drainage system. A gravel access originally proposed down the eastern
    and western side of the site to provide access for maintenance of the bio retention
    basins has now been deleted as per Councils information request dated 4 August
    2015.

    In regard to run off from the existing road and footpath area of George Street,
    Council has now indicated a desire replace the existing flush kerb with a
    conventional kerb and channel, however the footpath levels shall generally remain
    as they are. There is a large gum and a strand of melaleuca trees immediately
    adjacent to the existing road pavement that will need to be removed to allow the
    installation of the new kerb and channel, but following further discussions with
    Council staff it is understood that this is desirable due to the potential for long term
    damage to the road pavement. Water collected in the new kerb and channel will be
    collected in new gully pits at each end for the development site and conveyed by a
    conventional pipe system to the proposed outlets.

    The gully pit at the eastern end will drain to the proposed bio retention basin behind
    lot 2 within the drainage/environmental reserve, however the outlet for the western
    end will be directed into the Council reserve and ultimately to Wooroi Creek to
    minimise impacts on exiting trees in the environmental/drainage reserve caused by
    further pipe drainage installation. It should be noted that this pit is only collecting
    water from the existing George Street road pavement area that already flows into
    Wooroi Creek without any quality treatment. This has been depicted on the revised
    concept plans.


        4. CONCEPT DESIGN FOR WATER AND SEWER

    In regard to the sewer service we are able to command all of the new lots using a
    gravity sewer system connecting to an existing sewer manhole in George St. To
    avoid trenching adjacent significant trees along the frontage on George St we have
    elected to take the sewer down the side boundary of lot 1 (in the balance lot) on an
    alignment that avoids any existing significant trees. The manhole at the north east



    J/N 15513                                                                  October 2015
     Rev C                                                                       Page 2 of 3

Used in these records

About this file

File size
311 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Engineering report 1 George St rev C.pdf · 311 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.