Proposed Subdivision
1 George Tewantin
corner of the site is 3.65m deep but has now been located more than 15m from the
large tree in front of lot 1 and as such is not anticipated to impact on this tree. The
sewer main then traverses the rear of lots 1, 4, 5, 7, 10 and 11 to service these lots
and two manholes connect to sewer pipes along the side boundary of lots 2 and 8
to provide a connection to the rear of lots 2, 3, 6, 8 & 9. The proposed sewer system
has been forwarded to Unitywater for initial comment and they have no objection in
principle to the proposed alignment.
The sewer connects to the existing network on the north side of George St. It is
proposed to tunnel bore under the existing George St pavement and new footpath
at this location. This will also assist in minimising damage to two existing trees on
the south side of the road. The alignment of the sewer on the south side of George
St in front of number 35 is 1.75m off the property boundary. There are a few
significant trees within number 35 but these are set back between 3 and 5 metres
from the boundary and are unlikely to be impacted upon by the installation of the
new sewer. If necessary arborist services will be engaged to undertake minor root
pruning during excavation for this section of the sewer and to provide advice on
protection of any other trees potentially impacted on by the sewer construction.
In order to avoid disturbance of significant trees at the George Street frontage the
development site the water service to each block has been positioned accordingly.
Two road crossings (tunnel bores) are proposed to avoid trenching in front of a large
tree in the front of proposed lot 1 and lot 10. Note a similar approach is proposed
for the underground electrical service.
The above information is provided in support of the response to Council’s
information request dated 9 July 2015.
Prepared by
Doug Reynolds
RPEQ 9072
Tod Consulting Pty Ltd
8 October 2015
J/N 15513 October 2015
Rev C Page 3 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering report 1 George St rev C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 311 KB (small file)
- File type
No other editions are linked here.