2ND RFI - Attachment 4A - Stormwater Management Plan (2) · MCU22/0118

of 82

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (35.2 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                 RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads

                                                                        ADG Ref: 22366 C R10 Rev07 21.07.2023.docx

                                                                                                          July 2023

          All erosion and sediment control measures are to be designed and installed in accordance with IECA
          Guidelines. Further details regarding the proposed erosion and sediment control measures will be
          provided during the detailed design phase of the development.

 6.2.4    Maintenance

          All erosion and sediment control devices are to be maintained through the entire phase of the
          development leading up to the operational phase. Erosion and sediment control devices will need to
          be monitored closely throughout the entire project to ensure they are operating correctly and
          efficiently. No erosion and sediment control devices are to be removed unless otherwise authorized
          by a suitably qualified engineer or the site superintendent.

 6.3      Operational Phase Treatment
          Once directed to be commissioned by the superintendent and engineers, the Stormwater Quality
          Improvement Devices (SQIDs) will provide the required level of stormwater quality treatment to runoff
          from the site. It is expected that sediment laden runoff and the erosion potential at the subject site
          during the operational phase will be minimal. This is due to impervious developed areas in the form
          of roofs, driveways and carparking. It is understood that the footprint of these impervious areas has
          been reduced as much as practicable. The proposed landscaped areas will be maintained in a
          manner that will minimise erosion.

          Existing grassed and proposed landscaped areas will be maintained in a manner that will minimise
          erosion, some of which would be subject to erosion of topsoil from garden beds, erosion of soil from
          behind retaining walls, etc.

 6.3.1    Bio infiltration basin

             A minimum 60m2 surface area bio infiltration basin is proposed.

          The bio infiltration basin will remove contaminants and sedimentation from stormwater runoff via
          infiltration through layers of soil media. The basin is made of a 400mm filter media layer, a 100mm
          transition layer and a minimum 200mm drainage layer located above the silty sand sub-strata. The
          basin is to be vegetated, as per the Concept Rehabilitation Plan’s recommendations as attached to
          Appendix D or with suitable plants listed in Table 19 of the bio infiltration Technical Design
          Guidelines (Water by Design, 2014). These plants provide additional treatment and will prevent
          clogging of the basin. Runoff within the bio infiltration area gradually infiltrates the soil layers,
          assuming the in-situ soil of the area is sand. This assumption is based on the The In-situ Constant
          Head Permeability Test using the Talsma-Hallam Test method (per AS1547) undertaken by
          Tectonics Geotechnical & Environmental Engineers has confirmed the hydraulic conductivity of the
          soil is capable to infiltrate the retained water with an exfiltration rate of 115 mm/hr.

 6.4      Rainwater Harvesting – Reuse Minimum Sizing of Rainwater Tank
          To satisfy Council’s code performance outcomes by reducing the need for mains water, the roof area
          is to be connected to a rainwater tank with a minimum capacity of 5,000L in accordance with
          Department of Housing and Public Works MP4.2 – Rainwater Tanks and Other Supplementary Water
          Supply Systems. For the eight proposed cabins this equates to a total rainwater tank volume of 40
          kL. Each rainwater tank is to be plumbed to be available for outdoor cleaning, washing machines
          and toilet flushing in accordance with Council’s WSUD Planning Scheme Policies. Any overflow from
          the rain water will be directed to down pipes and suspended pipes clamped on the raised timber
          walkway leading into the bio-basin area.

 6.4.1    Internal Demand

          To calculate expected internal demand, the following assumptions were made:


BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA          Page 15

Used in these records

About this file

File size
35.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2ND RFI - Attachment 4A - Stormwater Management Plan (2).pdf · 35.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.