RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
All erosion and sediment control measures are to be designed and installed in accordance with IECA
Guidelines. Further details regarding the proposed erosion and sediment control measures will be
provided during the detailed design phase of the development.
6.2.4 Maintenance
All erosion and sediment control devices are to be maintained through the entire phase of the
development leading up to the operational phase. Erosion and sediment control devices will need to
be monitored closely throughout the entire project to ensure they are operating correctly and
efficiently. No erosion and sediment control devices are to be removed unless otherwise authorized
by a suitably qualified engineer or the site superintendent.
6.3 Operational Phase Treatment
Once directed to be commissioned by the superintendent and engineers, the Stormwater Quality
Improvement Devices (SQIDs) will provide the required level of stormwater quality treatment to runoff
from the site. It is expected that sediment laden runoff and the erosion potential at the subject site
during the operational phase will be minimal. This is due to impervious developed areas in the form
of roofs, driveways and carparking. It is understood that the footprint of these impervious areas has
been reduced as much as practicable. The proposed landscaped areas will be maintained in a
manner that will minimise erosion.
Existing grassed and proposed landscaped areas will be maintained in a manner that will minimise
erosion, some of which would be subject to erosion of topsoil from garden beds, erosion of soil from
behind retaining walls, etc.
6.3.1 Bio infiltration basin
A minimum 60m2 surface area bio infiltration basin is proposed.
The bio infiltration basin will remove contaminants and sedimentation from stormwater runoff via
infiltration through layers of soil media. The basin is made of a 400mm filter media layer, a 100mm
transition layer and a minimum 200mm drainage layer located above the silty sand sub-strata. The
basin is to be vegetated, as per the Concept Rehabilitation Plan’s recommendations as attached to
Appendix D or with suitable plants listed in Table 19 of the bio infiltration Technical Design
Guidelines (Water by Design, 2014). These plants provide additional treatment and will prevent
clogging of the basin. Runoff within the bio infiltration area gradually infiltrates the soil layers,
assuming the in-situ soil of the area is sand. This assumption is based on the The In-situ Constant
Head Permeability Test using the Talsma-Hallam Test method (per AS1547) undertaken by
Tectonics Geotechnical & Environmental Engineers has confirmed the hydraulic conductivity of the
soil is capable to infiltrate the retained water with an exfiltration rate of 115 mm/hr.
6.4 Rainwater Harvesting – Reuse Minimum Sizing of Rainwater Tank
To satisfy Council’s code performance outcomes by reducing the need for mains water, the roof area
is to be connected to a rainwater tank with a minimum capacity of 5,000L in accordance with
Department of Housing and Public Works MP4.2 – Rainwater Tanks and Other Supplementary Water
Supply Systems. For the eight proposed cabins this equates to a total rainwater tank volume of 40
kL. Each rainwater tank is to be plumbed to be available for outdoor cleaning, washing machines
and toilet flushing in accordance with Council’s WSUD Planning Scheme Policies. Any overflow from
the rain water will be directed to down pipes and suspended pipes clamped on the raised timber
walkway leading into the bio-basin area.
6.4.1 Internal Demand
To calculate expected internal demand, the following assumptions were made:
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2ND RFI - Attachment 4A - Stormwater Management Plan (2).pdfRelated documentApplication case desk ↗
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.