2ND RFI - Attachment 4A - Stormwater Management Plan (2) · MCU22/0118
Plans and drawings: the text below has words only, no drawings.
Very large file (35.2 MB): may take a few minutes to open.
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Toilet requires 25 L/day (per person) in accordance with Table 4.4 of the MUSIC Modelling
Guidelines 2010;
Laundry requires 21 L/day (per person) in accordance with Table 4.4 of the MUSIC Modelling
Guidelines 2010;
Peak occupancy of two (2) people per dwelling for the proposed 16x 2-bedroom units for the
holiday accommodation in accordance with Table 4.3 of the MUSIC Modelling Guidelines 2010.
Based on these assumptions the required volume for the internal demand component of the
rainwater tank is calculated as;
25 L/day (per person) + 21 L/day (per person) x 2 people per dwelling (peak) = 92 L/day
Daily demand (representing indoor use) = 92 L/d * 16 units = 1,472 L / day = 1.472 kL / day
6.5 MUSIC Model
The sites stormwater run-off for both the pre and post development were modelled using MUSIC
(version 6.3.0) and the water quality objectives for South East Queensland specified in the SPP 2017
of 80% TSS reduction, 60% TP reduction, 45% TN reduction, and 90% Gross Pollutants reduction.
Since the site slopes towards Weyba Creek which is a High Ecological Value waters, the post-
development pollutant discharge cannot be more than that of the pre-development discharge
according to The Noosa Plan 2020 Water Quality and Drainage Code.
Figure 4 – Treatment Train for Pre-Development
The pre-developed site situation is modelled in MUSIC and the arrangement is as given in Figure 4. The
Suspended Walkway node in the post development model has used the ewater parameters for the existing
vegetated surface as agreed by Noosa Council (Leon Rowland from Switchback Consulting on behalf of NSC).
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2ND RFI - Attachment 4A - Stormwater Management Plan (2).pdfRelated documentApplication case desk ↗
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.