                                                                    RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads

                                                                            ADG Ref: 22366 C R10 Rev07 21.07.2023.docx

                                                                                                             July 2023


          EXECUTIVE SUMMARY
          ADG Engineers (Aust.) Pty Ltd has been engaged by Aspect Architects to prepare a Site Based
          Stormwater Management Plan (SBSMP) suitable for submission to Noosa Shire Council (NSC) as
          additional information in support of a Development Application for a Material Change of Use for a
          proposed Eco Resort Extension to the current RACV Noosa Resort located at 94-142 Noosa Drive,
          Noosa Heads QLD 4567.

          The proposed development as shown in Aspect Architects plans issued on 30.06.2023 is for eight
          (8) double storey eco resort style units, raised boardwalk footpath links and associated carparking.
          The proposed application to Council also includes works involving converting an existing pond
          internal to the RACV Noosa Resort site into a new pool. ADG make note that this existing pond does
          not form part of an existing site-based stormwater treatment train nor provides further stormwater
          detention management. The pool works is to form part of separate application submitted to Council
          for building approval.

          The report comprises of stormwater quantity and quality assessments. The quantity assessment is
          undertaken to confirm a ‘non-worsening’ of peak flow discharges from the site and the quality
          assessment is undertaken to determine the required stormwater treatment measures to be
          implemented on site.

          The stormwater quantity objective was to demonstrate that there are no impacts from storm events
          up to and including the 1% AEP storm event. The purpose is to ensure that the existing infrastructure
          and/or downstream properties are not adversely affected. Due to negligible increase in peak flows
          from the subject site and the subject site being located close to the downstream waterway hence in
          the lower portion of the regional catchment, it is considered unnecessary to include provision for
          stormwater quantity management as the proposed runoff is intended to infiltrate into the existing sub-
          surface utilising bio infiltration basin. The In-situ Constant Head Permeability Test using the Talsma-
          Hallam Test method (per AS1547) undertaken by Tectonics Geotechnical & Environmental
          Engineers has confirmed the hydraulic conductivity of the soil is capable to infiltrate the retained
          water with an exfiltration rate of 115 mm/hr.

          Currently no stormwater quality management measures are in place for the Eco Village subject site.
          Stormwater treatment measures are proposed to be implemented on site in accordance with Industry
          Best Practice, WSUD Engineering Guidelines and, Council’s Land Development Guidelines to
          provide stormwater treatment for this site. ADG recommends the use of the following devices to meet
          the water quality objectives identified within the SPP 2017 and Council’s WSUD Planning Scheme
          Policies:

             Combined 40kL Rainwater Tank (Reuse) and downpipes to convey the overflow to the bio
             infiltration basin area.

             60m2 bio infiltration basin that will permit flows to infiltrate into the subject sites sub-surface.

          The eMUSIC model compares the pre and post-development stormwater pollutant residual loads in
          Section 6.6 of this report. ADG advise the post-development pollutant residual loads are now below
          the pre-development stormwater pollutant residual loads and that water is intended to infiltrate into
          the sub-surface strata of the subject site through the drainage layer of the proposed bio infiltration
          basin. This results in no increase in gross pollutants, total suspended solids, total phosphorus, nor
          total nitrogen compared to the pre-development scenario.

          To address the Noosa Shire Council’s RFI dated 6th April 2023, the following has been added to this
          SBSMP:

            The originally proposed 30m2 bio infiltration basin area is upsized into 60m2 surface and filter
            area. Refer to Appendix C of this report for updated plans with bio basin details.

BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA               Page 5

Used in these records

About this file

File size
35.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2ND RFI - Attachment 4A - Stormwater Management Plan (2).pdf · 35.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.