PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
sketch designs for stormwater filtration systems (Healthy
Waterways Water by Design).
AO11.5
Development will comply..
Floodplain management is designed in accordance with
the Framework for the Integration of Flood
and Stormwater Management into Open Space published
by Healthy Waterways Water by Design (version current at
the time of development application).
PO12 AO12.1 Development will comply, pre-
Development protects in-stream ecology by maintaining Where run-off from or within the site passes through or development low flows will be
pre-development low flow discharge regimes and drains to natural channels, waterways or wetlands, maintained in accordance with the
maintaining fish passages. development protects in-steam ecology by maintaining
frequent flow management
pre-development low flow discharge regimes in
objectives in PSP6 Engineering
accordance with the frequent flow management objectives
in PSP6 Engineering Design Standards - Roads, drainage Design Standards - Roads,
and earthworks drainage and earthworks
AO12.2 N/A no instream structure are
Instream structures such as roads, bridges, culverts, and proposed within this SBSMP
other stormwater infrastructure do not cause barriers to prepared by this office.
fish passage and facilitate the movement of terrestrial and
aquatic fauna along waterway corridors.
AO12.3 Development will comply.
Benthic substrate retains a continuous grade with the
direction of flow consistent with the natural bed profile.
Page 8 of 12
June 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2ND RFI - Attachment 4A - Stormwater Management Plan (2).pdfRelated documentApplication case desk ↗
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.