Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
PO13 AO13.1 To be complied with at detailed
Development is designed and constructed to maintain The location and form of stormwater discharge points do design / construction stages.
surface and ground water balances that sustain the not alter the pre-development hydrology of receiving
environmental values of water dependent ecosystems, surface water or groundwater.
including downstream aquatic, riparian, wetland and
terrestrial ecosystems. AO13.2 N/A Development is not located
Developments located on groundwater recharge or on groundwater recharge or
discharge areas are designed and managed in accordance discharge areas.
with a groundwater recharge and discharge management
plan prepared by a suitably experienced and qualified
groundwater hydrologist. The groundwater recharge or
discharge must demonstrate that the development does
not affect groundwater balances beyond the property
boundaries.
Construction and establishment of stormwater AO14.1 To be complied with at detailed
management systems An erosion and sediment control plan prepared in design / construction stages.
PO14 accordance with the International Erosion Control
Construction methods provide for appropriate controls to Association Best Practice Books demonstrates that the
avoid entry and transport of litter, sediment, and capture and release of stormwater achieves the design
associated prescribed water contaminants into receiving objectives listed in Table A: Construction phase –
waters. stormwater management design objectives of the State
Planning Policy (Appendix 2).
AO14.2 To be complied with at detailed
Construction works are designed and managed to restrict design / construction stages.
the extent of clearing and soil exposure to the minimum
Page 9 of 12
June 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2ND RFI - Attachment 4A - Stormwater Management Plan (2).pdfRelated documentApplication case desk ↗
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.