The Developed site catchments are as follows.
Catchment A
- Area – 0.4363 Ha
- Tc – 6 mins
- Fraction Impervious (Fi) – 0.77
Catchment B
- Area – 0.1955 Ha
- Tc – 6 mins
- Fraction Impervious (Fi) – 0.83
-
Peak flow rates for the median design storms for the developed site are given in Table 6.4
Table 6.4 – Developed Site Peak Flow Rates (L/s) (At year 2100)
Storm Event Q1 Q2 Q5 Q10 Q20 Q50 Q100
(1EY) (0.5EY) (0.2EY) (10%AEP) (5%AEP) (2%AEP) (1%AEP)
Cat A 124 156 193 233 270 321 359
Developed PFR
Cat B 60 75 93 111 129 149 166
Developed PFR
(PFR – Peak Flow Rate)
6.1.4 Peak Flow Comparison
Table 6.5 indicates the increased peak flow rates for the developed cases.
Table 6.5 – Comparison of Existing Vs Developed Peak Flows (L/s) (At year 2100)
AEP Storm Q1 Q2 Q5 Q10 Q20 Q50 Q100
(1EY) (0.5EY) (0.2EY) (10%AEP) (5%AEP) (2%AEP) (1%AEP)
Cat A 45 37 33 47 52 62 72
Increase PFR
Cat B 33 36 41 52 60 66 75
Increase PFR
(PFR – Peak Flow Rate )
SCG Consulting Engineers Page 18 SCG Ref: 33132(SWMP).RevC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.