Application Cover Letter - Operational Works - 85 Gympie Street, Tewantin

of 3

Page text shows just the words. Original shows the document exactly as it was published.

Project Ref: 250108




06 February 2025


Noosa Council
Po Box 141
Tewantin QLD 4565


Development Application – Operational Works (Stormwater Infrastructure)

Address: 85 Gympie Street and 61 Ward Street Tewantin

Formal Land Reference: Lot 51 on SP260161


This correspondence forms part of a Development Application for Operational Works
(Stormwater Infrastructure). This application is associated with the Dwelling House that was
approved by Caloundra Building Approvals (Approval Reference – PC22/1292).


Post approval, the stormwater arrangement associated with the dwelling has been altered with
the dwelling proposing stormwater discharge to the south of the site, as opposed to the frontage.
Figure 1 below shows that there is no stormwater infrastructure located within the rear of the site,
with the closest infrastructure being along the southern side boundary of Lot 48 on RP28717.




Figure 1 Subject Site and Stormwater Infrastructure (Source: Noosa Council)
Log in to download the original file

Application Cover Letter - Operational Works - 85 Gympie Street, Tewantin.pdf · 285 KB (small file)

Full text of the other 2 pages

Page 2

In order to facilitate a lawful point of stormwater discharge, the development proposes to pipe
stormwater through adjacent Lots 48 and 49 on RP28717, connecting to the existing stormwater
main located within Lot 48 on RP28717. In support of this arrangement an Operational Works
Stormwater Plan has been prepared by Lindsay Consulting (Attachment 1), which demonstrates
the proposed arrangement. As per the Stormwater Plan (Attachment 1), the development
includes a 2,000Lt detention tank to ensure that the development does not result in an increase
in stormwater flows discharging to Council’s Stormwater Infrastructure.




Figure 2 Extract of Stormwater Management Plan (Source: Lindsay Consulting)


As per the Stormwater Plan (Attachment 1) and Figure 2 above, the development proposes a
1.5m wide easement over the stormwater infrastructure. Based on available information, it is
understood that conversations have been held with Noosa Council’s Coordinator of Engineering,
Marc Lewis, with the landholder of Lots 48 and 49 on RP28717 seeking that a maximum 1.5m
wide inter allotment drainage easement is provided.


Under Planning Scheme Policy 6 ‘Engineering Design Standards’, ‘Section ‘SC6.7.5 – Specific
Design and Construction Requirements, Element (m) – Allotment Drainage’, detail is provided in
relation to the minimum requirements for inter allotment drainage. An extract of this section is
provided below that relates to minimum easement widths.

Page 3

 ‘Where allotments cannot drain to the street frontage, an allotment interlot drainage system
 shall be provided that outlets to the existing or proposed underground stormwater network.
 Each property serviced by an interlot drain shall be provided with a grated inlet structure at the
 lowest point on the rear boundary and an easement minimum 1.5 metres width connection
 for the future house roof runoff’.


The proposed Stormwater Plan (Attachment 1) meets this requirement, as well as all other
criteria contained under element (m) ‘Allotment Drainage’, with a minimum pipe gradient of 1%
and therefore should be supported by Council without variation.


We look forward to working with Council throughout the application process. Should you have
any questions regarding the application please contact our office.


Kind Regards,




Michael Lyell
Director
URBN Town Planning

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.