Original source · versioned page text
Application Cover Letter - Operational Works - 85 Gympie Street, Tewantin
In order to facilitate a lawful point of stormwater discharge, the development proposes to pipe stormwater through adjacent Lots 48 and 49 on RP28717, connecting to the existing stormwater main located within Lot 48 on RP28717. In support of this arrangement an Operational Works Stormwater Plan has been prepared by Lindsay Consulting (Attachment 1), which demonstrates the proposed arrangement. As per the Stormwater Plan (Attachment 1), the development includes a 2,000Lt detention tank to ensure that the development does not result in an increase in stormwater flows discharging to Council’s Stormwater Infrastructure. Figure 2 Extract of Stormwater Management Plan (Source: Lindsay Consulting) As per the Stormwater Plan (Attachment 1) and Figure 2 above, the development proposes a 1.5m wide easement over the stormwater infrastructure. Based on available information, it is understood that conversations have been held with Noosa Council’s Coordinator of Engineering, Marc Lewis, with the landholder of Lots 48 and 49 on RP28717 seeking that a maximum 1.5m wide inter allotment drainage easement is provided. Under Planning Scheme Policy 6 ‘Engineering Design Standards’, ‘Section ‘SC6.7.5 – Specific Design and Construction Requirements, Element (m) – Allotment Drainage’, detail is provided in relation to the minimum requirements for inter allotment drainage. An extract of this section is provided below that relates to minimum easement widths.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original