Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2015-03-31 Infrastructure and Services Committee Meeting Agenda

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               31 MARCH 2015


5.   FUNDING OF MUNNA POINT BRIDGE REPAIRS

Author           Project Manager, Adam Britton
                 Planning & Infrastructure Department

Index            ECM/Subject/Asset Management/Bridges
                 ECM/Projects (T1)/Noosa Parade Munna Point Bridge
                 ECM/Projedts (T1)/Noosaville – Munna Point Bridge

Attachments      1.    Munna Point Bridge Level 3 Bridge Report (31 Pages)
                 2.    Munna Point Bridge Design Drawings (16 Pages)
                       (Attachments 1 & 2 provided separately to this Agenda,
                       2 hard copies available for viewing in the Councillors’ Room)


EXECUTIVE SUMMARY
Not applicable

RECOMMENDATION
That Council note the report by the Project Manager to the Infrastructure & Services Committee
Meeting dated 31 March 2015, advising that the grant application with the Australian Government
Department of Infrastructure and Regional Development under the Bridges Renewal Programme
for 50/50 funding of the Munna Point bridge rehabilitation has been unsuccessful, and
A.   Authorise the calling of tenders for the full scope of rehabilitation works (Full Scope Option
     C) as detailed in the consultant’s level 3 bridge report and design; and
B.   Refer for consideration as part of the 2015/16 budget process, the required budget
     adjustments from the depreciation reserves to fund the full scope of works.



REPORT

1.   Introduction
Noosa Council is responsible for the maintenance and renewal of Munna Point Bridge on Noosa
Parade, Noosaville. The bridge is known to be suffering from deterioration from factors known
broadly as concrete cancer.
Investigation into the deterioration and rehabilitation options by Noosa Council in 2014 identified
that the bridge life may be extended through a specialised process of concrete repairs and
cathodic protection along with other strengthening measures. Following this investigation a
design was developed that would allow Council to call for tender submissions.
At the time of development of the rehabilitation solution, the Australian Government Department
of Infrastructure and Regional Development announced 50/50 funding opportunities under its
Bridges Renewal Programme. Council submitted a proposal in August 2014 with the advice that
announcements would be made in November 2014. A condition of the funding was that works
could not commence. This definition extended to also preclude Council from tendering for the
work.
The 2014/15 budget included a provision of $1.4 million for the rehabilitation works which was
based on an assumption that the project would be successful through the Federal grants
programme and receive 50 / 50 funding.



                                                                                    Page 18 of 29
Log in to download the original file

2015-03-31 Infrastructure and Services Committee Meeting Agenda(PDF, 862KB).pdf · 882 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.