-3-
23. Council officers are concerned that the wetland is not big enough and may cause scour.
Therefore, provide a Hec-Ras, Mike 11 or full 2d flow model to demonstrate that flow short
circuiting or scour will not occur.
24. Council officers are concerned that the smooth configuration of the concrete spillay does not
provide any dissipation to protect the receiving area from scour. Therefore provide details of
any dissipation and rip rap proposed along the spillway/ at its outlet based on the maximum
expected velocities of water discharge from the wetland.
25. Provide comment whether scour protection is required at the stormwater outlets shown on
drawing JO7-071-01 and at the proposed outlet of the concrete pipes from the sediment
forebay spillway.
26. Please provide engineers detail as referenced on drawing J07-071-02.
27. Council is concerned that the wetland is proposed in proximity of the Council sewer main and
sewer pump station. Include monitoring for faecal coliforms at an appropriate frequency
during construction to ensure damage to the pump station does not occur.
28. Indicate the location of the sewer pump station overflow path on Drawing J07-071-04.
29. Please label the sections on J07-071-01.
30. Drawing JO7-071-05 states that handrails will be installed to an unnamed standard. Specify
the relevant standard on the drawing.
31. Specify the minimum rock size requirements on drawing JO7-071-05, based on maximum
expected velocities.
32. Incorporate a safety device within the pipework to ensure humans do not enter or become
stuck in the pipework.
33. Council is concerned that the bathymetry of the wetland is not reflective of a natural
environment. Furthermore, the grade of bathymetry may affect the mosquito breeding
success. Please provide a revised longitudinal section and an ecologist comment on the
suitability and diversity of habitat zones proposed.
34. Council is concerned that the absence of a high flow bypass will compromise the viability of
the microphyte zone in high flow situations. Please provide justification for the absence of the
high flow bypass from the wetland design.
SEDIMENT AND EROSION CONTROL PLAN
35. Show approximate location of site exit referred to on Drawing J07-071-03.
36. The erosion and sediment control plan refers to the requirement for a dam upstream of the
sediment forebay during construction. Please indicate the dimensions and depth of the
required dam.
37. The Erosion and Sediment control plan proposes a turbidity release limit of 140 NTU based on
the correlation of suspended solids and turbidity at another site. Council understands the
correlation was based on all data points including many values where TSS exceeded the limit
of 50mg/L. Council will only consider the correlation based on compliant TSS values of less
than or equal to 50mg TSS/L. In this respect, provide Council with the data detailing the stated
correlation in excel format. In order for council to accept any correlation please confirm to
Council that the soil types at the subject site is the same/ consistent in terms of TSS and NTU
correlations to the soil at the site where the correlation was sourced from.
38. All Sediment and Erosion Control plans must be signed by an RPEQ or CPESC.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Further Information - 010.2008.00001896.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 22 KB (small file)
- File type
No other editions are linked here.