Council archive · source document
Request for Further Information - 010.2008.00001896.001 [As Published] · 142008.1896
-4-
39. There is concern that 900gsm coconut blanket does not breakdown and is also unsuitable for
reinforcement of steep slopes and in high flow environments – i.e. 5-7m/second. Reconsider
the stabilisation material proposed, with consideration of the velocities expected in the areas
to be reinforced and the requirement for the material to breakdown once vegetation is
established.
40. The Erosion and Sediment Control plan states that the sediment basin will contain ground
water and surface water flows. Council is concerned that the intrusion of groundwater to the
sediment basin may affect its performance. Please provide comment on the impact the
groundwater intrusion will have on the performance of the sediment basin and advise of any
special management requirements.
41. Please show water quality monitoring locations referred to on the Erosion and Sediment
Control Plan.
ENVIRONMENTAL MANAGEMENT PLAN
42. Please amend the EMP is respect to the following comments:
42.1. Information presented in the Environmental & Planning Committee Report 01/02/08 –
ordinary Meeting 14/02/08 states that Cape Bouvard is willing to undertake the annual
maintenance requirements of the wetland for the first 3 – 4 years, being the remaining
length of time to complete future stages of Settlers Cove development. During this time
Cape Bouvard will prepare a maintenance manual drawing from the experience of 3-4
years maintenance works. Information presented in the EMP with the application refers
to Council being responsible for maintenance of the wetland at completion of
construction. This is contrary to agreements made in the preliminary approval.
Therefore, please amend the EMP to be reflective of the maintenance agreement
made in the preliminary approval.
42.2. Define “attendee”.
42.3. Define “fully briefed” as referred to on pg 6 of the EMP.
42.4. Trees for removal should be inspected for wildlife on the day of their removal.
42.5. Herbicides are not permitted within 30m of waterways.
42.6. Define “humane manner”
42.7. Provide information on the existing TSS entering the parkland.
42.8. Provide existing groundwater levels and include a dewatering Management Plan.
42.9. Include requirement for hazardous substances to be stored and handled in accordance
with the relevant Australian Standard.
42.10. Include a contingency management plan in the event the site should be shut down for
unforseen circumstances.
42.11. Provide a plan wit the expected location of the acid sulfate soils treatment pad.
42.12. Identify the final location for treated acid sulfate soils.
42.13. Identify what the leachate water will be inspected for as referred to on pg 6 of the Acid
Sulfate Soil Management Plan.
Land Use (Environmental Planner)
43. The site is located within the Biodiversity Overlay. This particular attributes are Environmental
Protection, Environmental Enhancement and Koala Habitat Area. The site is adjacent to a
Riparian Buffer area. Provide an assessment of the flora and fauna values of the site in
accordance with Section 4 of the Planning Scheme Policy 18 Ecological Assessment
Guidelines. Attention shall be paid, but not limited to, the likelihood of the presence or suitable
habitat for protected species listed in applicable legislation and supporting documents.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Further Information - 010.2008.00001896.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 22 KB (small file)
- File type
No other editions are linked here.